IR 05000440/2015006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 47: Line 47:
  -3- Please contact me at 630-829-9 8 27 with any questions you have regarding this lette  
  -3- Please contact me at 630-829-9 8 27 with any questions you have regarding this lette  


Sincerely,/RA/ Billy Dickson, Chief Branch 5 Division of Reactor Projects Docket N License N NPF-58  
Sincerely,
 
/RA/ Billy Dickson, Chief Branch 5 Division of Reactor Projects Docket N License N NPF-58 Enclosure:
===Enclosure:===
Inspection Plan cc: Distribution via LISTSERV
Inspection Plan cc: Distribution via LISTSERV
}}
}}

Revision as of 18:11, 10 May 2019

Annual Assessment Letter for Perry, Unit 1 (Inspection Report 05000440/2015006)
ML16060A319
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/02/2016
From: Dickson B C
NRC/RGN-III/DRP/B5
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2015006
Download: ML16060A319 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I I I 24 43 WARRENVILLE RD

. SUITE 2 1 0 LISLE , I L 60532-4352 Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A

-PY-290 Perry, OH 44081

-0097

SUBJECT: ANNUAL ASSESSMENT LETTER FOR PERRY NUCLEAR POWER PLANT, UNIT 1 (REPORT 05000 440/20 15006)

Dear Mr. Hamilton

On February 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Perry Nuclear Power Plant, Unit The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 , through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Perry Nuclear Power Plant, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Perry Nuclear Power Plant, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31 , 20 1 Routine inspections performed by resident inspectors are not included in the inspection pla The inspect ions listed during the last 9 months of the inspection plan are tentative and may be revised at the mid

-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondenc The NRC inspection schedule includes a triennial inspection conducted in accordance with Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications" an d an infrequently performed inspection related to the operation of the Independent Spent Fuel Storage Installation (ISFSI) using Inspection Procedure 60855.1, "Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants."

March 2, 2016 D. Hamilton

-2- In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond

-design-basis external even Additionally, the Commission issued Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide

-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond

-design-basis external even The NRC is conducting audits of licensee efforts towards compliance with these Order The audit was completed for Perry Nuclear Power Station, Unit 1, and the information gathered will aid staff in development of a safety evaluation for the sit After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issue Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans."

In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

D. Hamilton

-3- Please contact me at 630-829-9 8 27 with any questions you have regarding this lette

Sincerely,

/RA/ Billy Dickson, Chief Branch 5 Division of Reactor Projects Docket N License N NPF-58 Enclosure:

Inspection Plan cc: Distribution via LISTSERV