UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 March 4, 2015 Mr. Ernest Harkness Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PERRY NUCLEAR POWER PLANT (REPORT 05000440/2014001)

Dear Mr. Harkness:

On February 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Perry Nuclear Power Plant (Perry). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Perry operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Perry during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. Notable infrequent inspections planned include the biennial Problem Identification and Resolution Inspection and a Triennial Fire Protection inspection. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence The NRC on-site audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," was completed in December 2014. Due to the

E. Harkness number of open items still remaining open after the audit, an additional on-site review was conducted on March 3, 2015.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9618 with any questions you may have regarding this letter.

Sincerely,

/RA/

Michael Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Nuclear Power Plant Inspection/Activity Plan cc w/encl: Distribution via LISTSERV

E. Harkness number of open items still remaining open after the audit, an additional on-site review was conducted on March 3, 2015.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9618 with any questions you may have regarding this letter.

Sincerely,

/RA/

Michael Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Nuclear Power Plant Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl:

Kimyata MorganButler Carole Ariano RidsNrrPMPerry Resource Linda Linn RidsNrrDorlLpl3-2 Resource DRPIII RidsNrrDirsIrib Resource DRSIII Cynthia Pederson Jim Clay Darrell Roberts Carmen Olteanu Richard Skokowski ROPassessment.Resource@nrc.gov Allan Barker ADAMS Accession Number: ML15062A604 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME JJandovitz:rj/mz MKunowski DATE 03/03/15 03/04/15 OFFICIAL RECORD COPY

Page 1 of 2 Perry 03/03/2015 09:40:43 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI ISI - ISI INSPECTION 1 1 03/09/2015 03/29/2015 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 1 03/30/2015 04/03/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/30/2015 04/03/2015 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 1 05/04/2015 05/08/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 05/04/2015 05/08/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment BI HS - TRIENNIAL HEAT SINK INSPECTION 3 1 06/08/2015 06/12/2015 IP 7111107T Heat Sink Performance BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 1 07/06/2015 07/10/2015 IP 7111402 Alert and Notification System Testing 1 07/06/2015 07/10/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 07/06/2015 07/10/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 07/06/2015 07/10/2015 IP 71151 Performance Indicator Verification BI PIR - BIENNIAL PI&R INSPECTION 4 1 07/20/2015 08/07/2015 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 08/31/2015 09/04/2015 IP 71124.07 Radiological Environmental Monitoring Program 1 08/31/2015 09/04/2015 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 09/14/2015 09/18/2015 IP 71124.02 Occupational ALARA Planning and Controls BI FIRE - FIRE PROTECTION INSPECTION & BAG TRIP 5 1 09/21/2015 10/23/2015 IP 7111105T Fire Protection [Triennial]

STRIKE P - STRIKE PREPARATIONS 1 1 11/01/2015 11/20/2015 IP 92709 Licensee Strike Contingency Plans BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 03/07/2016 03/11/2016 IP 71124.05 Radiation Monitoring Instrumentation ENG BI - MODIFICATIONS / 50.59 INSPECTION 3 1 05/09/2016 05/27/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 05/16/2016 05/20/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Perry 03/03/2015 09:40:43 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 06/27/2016 07/01/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.