ML091520257: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML091520257
| number = ML091520257
| issue date = 07/07/2008
| issue date = 07/07/2008
| title = Palisades, Proposed Operating Test Comments
| title = Proposed Operating Test Comments
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III

Revision as of 01:44, 17 April 2019

Proposed Operating Test Comments
ML091520257
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200310 List:
References
Download: ML091520257 (1)


Text

Proposed Operating Test Comments

1. Change SRO JPM ADM 2 so we can perform in the simulator or classroom.

Done 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done

3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A.
4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC can't evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.