ML091520125: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML091520125 | | number = ML091520125 | ||
| issue date = 07/07/2008 | | issue date = 07/07/2008 | ||
| title = | | title = ES-301-5 R1, Transient and Event Checklist | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-III | | author affiliation = NRC/RGN-III |
Revision as of 01:45, 17 April 2019
ML091520125 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/07/2008 |
From: | NRC/RGN-III |
To: | Entergy Nuclear Palisades |
Shared Package | |
ML082200310 | List: |
References | |
Download: ML091520125 (1) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Modified from outline submittal Facility: Palisades Date of Exam: July 2008 Operating Test No.: 1 A P P L I C A N T E V E N T T Y P E Scenarios 1 2 SPARE (#)
T O T A L MINIMUM (*) CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P R I USRO-U RX - 2 - 1 1 0 NOR 1 - 1 - 1 1 I/C 23458 45 234 247 7 2 MAJ 7 7 7 6 2 1 TS 248 - 246 - 3 2 SRO-U RX - - - - 0 0 NOR 1 2 1 1 2 1 I/C 356 345 234 345 6 2 MAJ 7 7 7 6 2 1 TS - 345 246 - 3 2 RO RX 1 - 1 - 1 1 NOR - 12 - 1 2 1 I/C 2568 356 246 345 7 4 MAJ 7 7 7 7 2 2 TS - - - - 0 0 Note: # Spare scenario not included in totals.
Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and" balance-of-plant (BOP)" positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.