|
|
Line 5: |
Line 5: |
| | author name = Zimmerman J | | | author name = Zimmerman J |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Howe A G, Evans M G, Lund A L | | | addressee name = Howe A, Evans M, Lund A |
| | addressee affiliation = NRC/NRR/DORL, NRC/OIS/ICOD/DDB | | | addressee affiliation = NRC/NRR/DORL, NRC/OIS/ICOD/DDB |
| | docket = 05000346 | | | docket = 05000346 |
|
---|
Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] Category:Press Release
MONTHYEARML24249A1952024-08-22022 August 2024 News Release-III-24-024: NRC to Hold Open House to Discuss 2023 Performance of Davis-Besse Nuclear Power Plant ML24052A3342023-12-27027 December 2023 News Release-III-23-024: NRC Names New Senior Resident Inspector at Davis-Besse Nuclear Power Plant ML24052A0992023-09-29029 September 2023 News Release-23-062: NRC Approves License Transfers for Energy Harbor Nuclear Plants ML24047A1142023-05-0909 May 2023 News Release-III-23-008: NRC to Hold Public Meeting to Discuss 2022 Performance of Davis-Besse Nuclear Power Plant ML24045A2612023-04-25025 April 2023 News Release-III-23-007: NRC Begins Special Inspection at Davis-Besse Nuclear Power Station ML23165A2342023-03-0303 March 2023 News Release-23-019: NRC Issues Annual Assessments for Nation’S Nuclear Power Plants ML22199A0622022-06-15015 June 2022 News Release-III-22-016: NRC to Hold Public Meeting to Discuss 2021 Performance of Davis-Besse Nuclear Power Plant ML22067A0642022-03-0707 March 2022 News Release-22-011: NRC Issues Annual Assessments for Nations Nuclear Power Plants ML22063A4672022-03-0303 March 2022 News Release-III-22-003: NRC Finalizes White Finding at Davis-Besse Nuclear Power Plant ML22028A0492022-01-26026 January 2022 News Release-III-22-001: NRC Schedules a Regulatory Conference with Energy Harbor Nuclear Corp Press Release-III-21-010, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Davis-Besse and Perry Nuclear Power Plants2021-06-15015 June 2021 Press Release-III-21-010: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Davis-Besse and Perry Nuclear Power Plants Press Release-III-21-005, NRC Names New Resident Inspector at Davis-Besse Nuclear Power Plant2021-04-28028 April 2021 Press Release-III-21-005: NRC Names New Resident Inspector at Davis-Besse Nuclear Power Plant Press Release-III-20-008, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Davis-Besse and Perry Nuclear Power Plants2020-07-16016 July 2020 Press Release-III-20-008: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Davis-Besse and Perry Nuclear Power Plants Press Release-19-061, NRC Approves License Transfers for Firstenergy Nuclear Power Plants2019-12-0303 December 2019 Press Release-19-061: NRC Approves License Transfers for Firstenergy Nuclear Power Plants Press Release-III-19-020, NRC Names New Senior Resident Inspector at Clinton Nuclear Power Station2019-10-0202 October 2019 Press Release-III-19-020: NRC Names New Senior Resident Inspector at Clinton Nuclear Power Station Press Release-III-19-017, NRC to Hold Open House to Discuss 2018 Performance of Davis-Besse Nuclear Power Station2019-07-10010 July 2019 Press Release-III-19-017: NRC to Hold Open House to Discuss 2018 Performance of Davis-Besse Nuclear Power Station Press Release-III-18-021, NRC to Hold Public Meeting to Discuss Performance of Davis-Besse Nuclear Power Station2018-06-13013 June 2018 Press Release-III-18-021: NRC to Hold Public Meeting to Discuss Performance of Davis-Besse Nuclear Power Station Press Release-III-18-004, NRC Names New Resident Inspector at Davis-Besse Nuclear Power Plant2018-02-0707 February 2018 Press Release-III-18-004: NRC Names New Resident Inspector at Davis-Besse Nuclear Power Plant Press Release-III-17-021, NRC to Conduct Open House to Discuss 2016 Performance of Davis-Besse Nuclear Power Plant2017-07-0707 July 2017 Press Release-III-17-021: NRC to Conduct Open House to Discuss 2016 Performance of Davis-Besse Nuclear Power Plant Press Release-III-16-022, NRC Issues Confirmatory Order to Firstenergy Regarding Davis-Besse Nuclear Station2016-09-0202 September 2016 Press Release-III-16-022: NRC Issues Confirmatory Order to Firstenergy Regarding Davis-Besse Nuclear Station Press Release-III-16-014, NRC to Hold Open House to Discuss Agency'S Assessment of Davis-Besse Nuclear Plant2016-06-13013 June 2016 Press Release-III-16-014: NRC to Hold Open House to Discuss Agency'S Assessment of Davis-Besse Nuclear Plant Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants2016-03-0404 March 2016 Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants Press Release-15-082, NRC Renews Operating License of Davis-Besse Nuclear Power Plant in Ohio2015-12-0808 December 2015 Press Release-15-082: NRC Renews Operating License of Davis-Besse Nuclear Power Plant in Ohio Press Release-15-054, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2015-09-0303 September 2015 Press Release-15-054: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-III-15-016, NRC Schedules Open House June 11 to Discuss Performance of Davis-Besse Nuclear Plant2015-06-0202 June 2015 Press Release-III-15-016: NRC Schedules Open House June 11 to Discuss Performance of Davis-Besse Nuclear Plant ML15118A5852015-04-28028 April 2015 Press Release No.15-028: NRC Issues Final Environmental Impact Statement for Davis-Besse Nuclear Power Plant License Renewal Press Release-III-14-033, NRC Schedules Open House August 7 to Discuss Performance of Davis-Besse Nuclear Power Station2014-07-28028 July 2014 Press Release-III-14-033: NRC Schedules Open House August 7 to Discuss Performance of Davis-Besse Nuclear Power Station Press Release-14-019, NRC Seeks Public Comment on Draft Environmental Report for Davis-Besse Nuclear Plant License Renewal - Meetings Scheduled for March 252014-03-13013 March 2014 Press Release-14-019: NRC Seeks Public Comment on Draft Environmental Report for Davis-Besse Nuclear Plant License Renewal - Meetings Scheduled for March 25 Press Release-III-14-004, NRC Regional Office to Discuss Davis-Besse Steam Generator Installation: Webinar to Be Held on February 202014-02-11011 February 2014 Press Release-III-14-004: NRC Regional Office to Discuss Davis-Besse Steam Generator Installation: Webinar to Be Held on February 20 Press Release-I-13-032, NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants2013-09-16016 September 2013 Press Release-I-13-032: NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants Press Release-13-074, NRC Issues Final Safety Evaluation Report for Davis-Besse License Renewal Application2013-09-0606 September 2013 Press Release-13-074: NRC Issues Final Safety Evaluation Report for Davis-Besse License Renewal Application Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2013-09-0606 September 2013 Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-III-13-021, NRC Will Hold a June 11 Open House on Davis-Besse Nuclear Power Plant 2012 Performance2013-06-0303 June 2013 Press Release-III-13-021: NRC Will Hold a June 11 Open House on Davis-Besse Nuclear Power Plant 2012 Performance Press Release-III-13-003, NRC Names New Resident Inspector at Davis-Besse Nuclear Power Plant2013-01-29029 January 2013 Press Release-III-13-003: NRC Names New Resident Inspector at Davis-Besse Nuclear Power Plant Press Release-12-118, ASLB to Hear Oral Arguments Nov. 5-6 on Contention Regarding Cracks in Davis-Besse Shield Building2012-10-24024 October 2012 Press Release-12-118: ASLB to Hear Oral Arguments Nov. 5-6 on Contention Regarding Cracks in Davis-Besse Shield Building Press Release-III-12-037, NRC, Firstenergy Nuclear Operating Co. to Discuss Company Nuclear Plants on Sept. 262012-09-20020 September 2012 Press Release-III-12-037: NRC, Firstenergy Nuclear Operating Co. to Discuss Company Nuclear Plants on Sept. 26 Press Release-III-12-033, NRC Schedules Public Meeting August 15 to Discuss Performance of Davis-Besse Nuclear Power Station2012-08-0707 August 2012 Press Release-III-12-033: NRC Schedules Public Meeting August 15 to Discuss Performance of Davis-Besse Nuclear Power Station Press Release-III-12-032, NRC to Hold Public Meeting to Discuss Its Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks2012-08-0202 August 2012 Press Release-III-12-032: NRC to Hold Public Meeting to Discuss Its Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks Press Release-12-087, NRC Issues Safety Evaluation Report with Open Items for Davis-Besse Nuclear Plant License Renewal Application2012-08-0101 August 2012 Press Release-12-087: NRC Issues Safety Evaluation Report with Open Items for Davis-Besse Nuclear Plant License Renewal Application Press Release-III-12-023, NRC Concludes Its Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks2012-06-21021 June 2012 Press Release-III-12-023: NRC Concludes Its Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks Press Release-12-057, Atomic Safety and Licensing Board Cancels Oral Arguments in Davis-Besse License Renewal Hearing Scheduled for May 182012-05-15015 May 2012 Press Release-12-057: Atomic Safety and Licensing Board Cancels Oral Arguments in Davis-Besse License Renewal Hearing Scheduled for May 18 Press Release-12-047, Atomic Safety and Licensing Board to Hold Oral Arguments May 18 on Davis-Besse Shield Building Cracking2012-05-0202 May 2012 Press Release-12-047: Atomic Safety and Licensing Board to Hold Oral Arguments May 18 on Davis-Besse Shield Building Cracking Press Release-III-12-007, NRC Begins Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks2012-02-28028 February 2012 Press Release-III-12-007: NRC Begins Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks Press Release-III-11-037, NRC to Hold Meeting with Firstenergy to Discuss Davis-Besse Shield Building Cracks2011-12-29029 December 2011 Press Release-III-11-037: NRC to Hold Meeting with Firstenergy to Discuss Davis-Besse Shield Building Cracks ML12200A2272011-12-0303 December 2011 Email from J. Zimmerman, NRR to M. Evans, NRR Et Al. Fw: Press Release Has Been Issued. Attachment Is Publicly Available ML1133606772011-12-0202 December 2011 Press Release-iiii-11-036: NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter Press Release-III-11-036, NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter2011-12-0202 December 2011 Press Release-III-11-036: NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter Press Release-III-11-035, NRC Responds to Alert at Davis-Besse Nuclear Power Station2011-11-16016 November 2011 Press Release-III-11-035: NRC Responds to Alert at Davis-Besse Nuclear Power Station Press Release-11-016, Licensing Board to Hear Oral Argument March 1 on Davis-Besse Reactor License Renewal Application2011-02-0303 February 2011 Press Release-11-016: Licensing Board to Hear Oral Argument March 1 on Davis-Besse Reactor License Renewal Application Press Release-10-193, NRC to Conduct Environmental Scoping Meeting as Part of the License Renewal Application for Davis Besse; Meeting Nov. 42010-10-28028 October 2010 Press Release-10-193: NRC to Conduct Environmental Scoping Meeting as Part of the License Renewal Application for Davis Besse; Meeting Nov. 4 2024-08-22
[Table view] |
Text
Craver, Patti From: Zimmerman, Jacob Sent: Saturday, December 03, 2011 10:12 AM To: Evans, Michele; Howe, Allen; Lund, Louise
Subject:
Fw: PRESS RELEASE HAS BEEN ISSUED Attachments:
DB- CAL-assurance pr.docx Michele/Allen/Louise FYI: NRC Press Release on Davis-Besse shield building.
I think they did a nice job crafting it. I especially like that they addressed fully documenting the decision.Have a great weekend!Jake From: Mitlyng, Viktoria To: Briley, Thomas; Murphy, Martin; Cameron, Jamnes; Wilson, Adam; Kimble, Daniel; Rutkowski, John; Hills, David;Haskell, Russell; Nolan, Ryan; Mahoney, Michael; Hernandez, Pete; Chandrathil, Prema; Neurauter, James; Zimmerman, Jacob; Hoang, Dan; Logaras, Harral; Barker, Allan; Sheikh, Abdul; Snyder, Amy; Wiebe, Joel; Meghani, Vijay; Smagacz, Phillip; Riley (OCA), Timothy; Jessup, William; Graves, Herman; Sakai, Stacie; Manoly, Kamal; Rezai, Ali; Sanchez Santiago, Elba; Steffes, Jakob; Lupold, Timothy; Gonzalez, Hipolito; Thorp, John; CuadradoDeJesus, Samuel; Thomas, George; Auluck, Rajender; Lehman, Bryce; Morey, Dennis; Burza, Justine; Stone, AnnMarie; Hogan, Rosemary; Case, Michael; Richards, Stuart; Hiland, Patrick; Orth, Steven; Cheok, Michael; Boland, Anne; Lougheed, Patricia; Zerth, Mardorie Cc: Shear, Gary; OBrien, Kenneth; West, Steven; Reynolds, Steven; Pederson, Cynthia; Uhle, Jennifer Sent: Fri Dec 02 17:30:48 2011
Subject:
PRESS RELEASE HAS BEEN ISSUED The press release associated with our conclusion on the safety of the shield building and the Confirmatory Action Letter has been issued.Viktoria Mitlyng Office of Public Affairs US Nuclear Regulatory Commission Region III Lisle, IL 60532 Tel 630/829-9662 Fax 630/515-1026 e-mail: viktoria.mitlyng(nrc.g oy 1 ~'32 4e, NRC NEWS 0 U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region III 2443 Warrenville Road t e Lisle IL 60532 Site: www.nrc.gov Blog: http://public-blog.nrc-zateway.gov No. 111-11-036 December, 2 2011 Contact: Viktoria Mitlyng (630) 829-9662 E-Mail: OPA3.RegionlII(nrc.gov Prema Chandrathil (630) 829-9663 NRC CONCLUDES DAVIS-BESSE SAFE TO RESTART AND ISSUES CONFIRMATORY ACTION LETTER The U.S. Nuclear Regulatory Commission has determined that the operators of the Davis-Besse nuclear power plant, FirstEnergy Nuclear Operating Corp. (FENOC) have provided reasonable assurance that the shield building is capable of performing its safety functions and that the utility can proceed with restarting the plant. The NRC's independent assessment evaluated a wide range of information such as technical details ranging from the size of the cracks, the utility's sampling and testing of the concrete in the building to determine the extent of the cracks, and its structural analysis.
The plant is located in Oak Harbor, Ohio about 40 miles southeast of Toledo.The NRC will hold a public meeting in which FENOC will discuss their technical analysis and explain why the plant is safe to continue to operate with the cracks in the shield building.
The meeting will take place in the near future with details to be issued once finalized.
However, the NRC has issued a Confirmatory Action Letter (CAL) to the operator of the plant, FENOC. The CAL details and confirms FENOC's agreement to take certain actions to monitor and ensure the cracks in the shield building continue to not adversely impact safety going forward. The NRC will review and evaluate FENOC's actions in response to the CAL in order to make sure they are thorough and complete.The FENOC commitments to the NRC include:-Determine and provide the root cause of the cracks in the shield building, corrective actions, and develop a long-term monitoring program.-Select multiple areas in the shield building that have no cracks but are adjacent to known cracks to determine whether the area of the cracks has spread.-Perform additional analysis in known cracked areas to determine whether the width of the cracks has increased.
ll'Even though the NRC has concluded the shield building can perform its safety functions, the NRC will continue to inspect whether the shield building in its current condition meets all design requirements in the plant's license.Failure to meet the commitments in the CAL may result in additional regulatory action if the utility does not provide reasonable assurance that the NRC can rely on the FENOC to meet the NRC's requirements and protect public health and safety.On Oct. 10 the NRC was informed by FENOC that while conducting work to replace the Davis-Besse reactor vessel head its workers identified cracks in the shield building.
The shield building is a 2.5 foot thick reinforced concrete building that surrounds a 1.5 inch thick steel containment vessel that encloses the reactor. The two buildings are separated by a 4.5 foot space.The NRC will issue an inspection report documenting its review of this issue and the agency's conclusions 45 days after the inspection is complete.News releases are available through a free listserv subscription or by clicking on the EMAIL UPDATES link on the NRC homepage (www.nrc.gov).
E-mail notifications are sent to subscribers when news releases are posted to NRC's website.