ML13204A138: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML13204A138
| number = ML13204A138
| issue date = 06/25/2013
| issue date = 06/25/2013
| title = Kewaunee Power Station 2012 End-of-Cycle Slides
| title = 2012 End-of-Cycle Slides
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III

Revision as of 17:52, 11 April 2019

2012 End-of-Cycle Slides
ML13204A138
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/25/2013
From:
NRC/RGN-III
To:
References
Download: ML13204A138 (42)


Text

Kewaunee Power Station Annual Assessment Meeting Reactor Oversight Process - 2012 Nuclear Regulatory Commission

- Region III Carlton, WI June 25, 2013

2 Purpose of Today's Meeting A public forum for discussion of the licensee's performance in 2012 NRC will address the performance issues identified in the annual assessment letter Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance

3 Agenda Introduction Review of Reactor Oversight Process National Summary of Plant Performance Discussion of Plant Performance Results End of the Reactor Oversight Process Transition to Decommissioning Licensee Response and Remarks NRC Closing Remarks Break NRC available to address public questions

4 Region III Organization Chuck Casto Regional Administrator Cindy Pederson Deputy Regional Administrator Steve Reynolds Director Division of Reactor Projects Ken O'Brien Deputy Director Gary Shear Director Division of Reactor Safety Pat Louden Deputy Director Ken Riemer Branch Chief Regional Specialists Kewaunee Power Station Resident Inspectors Robert Krsek Kevin Barclay Project Engineers Nirodh Shah

5 Our Mission To license and regulate the nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.

6 Some Nuclear Facts 100 nuclear power plants supply about 20 percent of the electricity in the U.S.

Nuclear materials are used in medicine for diagnosis and cancer treatment.

Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.

7 The NRC Regulates Nuclear reactors

- commercial power reactors, research and test reactors, new reactor designs Nuclear materials

- nuclear reactor fuel, radioactive materials for medical, industrial, and academic use Nuclear waste

- transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities Nuclear security

- physical security of nuclear facilities and materials from sabotage or attacks

8 What We Don't Do Regulate nuclear weapons, military reactors, or space vehicle reactors Own or operate nuclear power plants Regulate some radioactive materials, such as X-rays and naturally occurring radon

9 How We Regulate Establish rules and regulations Issue licenses Provide oversight through inspection, enforcement, and evaluation of operational experience Conduct research to provide support for regulatory decisions Respond to events and emergencies

10 Assurance of Plant Safety Require "defense

-in-depth" Require long

-term maintenance of equipment Require continual training of operators Verify compliance with regulations

11 What We Do

- Nuclear Waste The NRC regulates:

-Storage of spent reactor fuel in fuel pools or dry storage casks, and

-Any national spent fuel storage site.

12 What We Do

- Nuclear Security NRC Requires:

-Well-armed and well

-trained security forces, -Surveillance and perimeter patrols, -State-of-the-art site access equipment and controls, -Physical barriers and detection zones, and

-Intrusion detection systems and alarm stations.

13 NRC Performance Goals Safety: Ensure adequate protection of public health and safety and the environment.

Security: Ensure adequate protection in the secure use and management of radioactive materials.

14 Reactor Oversight Process SafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 15 Examples of Baseline Inspections Equipment Alignment

~80 hrs/yr Triennial Fire Protection

~250 hrs every 3 yrs Operator Response

~125 hrs/yr Emergency Preparedness

~80 hrs/yr Rad Release Controls

~110 hrs every 2 yrs Worker Radiation Protection

~95 hrs/yr Corrective Action Program

~250 hrs every 2 yrs Corrective Action Case Reviews

~60 hrs/yr

16 Significance Threshold Performance Indicators Green: Only Baseline Inspection White: Increases NRC oversight Yellow: Increases NRC oversight Red: Increases NRC oversight Inspection Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue

17 Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions LicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.

DegradedCornerstoneUnacceptablePerformance 18 National Summary of Plant Performance Status as of 12/31/2012 Licensee Response 81 Regulatory Response 18 Degraded Cornerstone 3 Multiple/Repetitive Deg. Cornerstone 1 Unacceptable 0 IMC 0350 Oversight 1 Total 104 19 National Summary Performance Indicator Results for 2012* -Green 6926 -White 23 -Yellow 0 -Red 0 *PIs are counted per plant per quarter Total Inspection Findings in 2012# -Green 914 -White 16 -Yellow 1 -Red 1 # Finding data current as of 3/04/2013

20 Kewaunee Power Station Assessment Results January 1

- December 31, 2012 Regulatory Response Column White Finding in Emergency Preparedness dealing with Degraded Emergency Action Levels and Scheme White Finding in Fire Protection regarding Fire Brigade License Basis Supplemental Inspections TBD

21 Safety Significant Findings or PIs FIN 05000305/2013007

-01 Failure to Perform Announced Fire Drills In Accordance With Fire Protection Program A White Finding involving the willful actions of the Kewaunee Fire Brigade Training Coordinator while conducting announced fire drills from August 2009 until December 2011. The licensee failed to perform required quarterly announced fire drills in that the announced fire drills were instead conducted as training sessions. (ADAMs Accession Number ML13121A317)

VIO 05000305/2012503

-01 Degraded Emergency Action Level Scheme A White Finding involving the failure to identify a loss of the System Particulate, Iodine, and Noble Gas (SPING) monitor indication on the plant process computer system (PPCS) and Radserv stations. These indications support the timely classification of Emergency Action Levels (EALs) RG1.1, General Emergency, and RS1.1, Site Area Emergency. (ADAMs Accession Number ML13094A270)

22 Kewaunee Power Station Inspection Activities January 1

- December 31, 2012 Baseline Inspection

- ~2500 hours

- Resident Inspectors on site daily

- Regional Inspectors from Lisle, IL

- Maintenance

- Operations

- Engineering

- Radiation Protection

- Security - Emergency Preparedness

23 Kewaunee Power Station Inspection Activities January 1

- December 31, 2012 Team Inspections

- License Renewal Inspection

- Problem Identification & Resolution Inspection

- Component Design Bases Inspection Refueling Outage

- April 6, 2012

- May 10, 2012

24 Kewaunee Power Station Annual Assessment Summary January 1

- December 31, 2012 Dominion operated Kewaunee Power Station in a manner that preserved public health and safety All cornerstone objectives were met with one White Finding in EP and one White Finding in Fire Protection identified.

25 January 1

- December 31, 2012 Substantive cross-cutting issues- None The NRC conducted ROP baseline inspections at Kewaunee through May 31, 2013. Decommissioning Inspections will be carried out for the remainder of 2013 as well as two supplemental inspections regarding the White Finding in Fire Protection and the White Violation in EP.

Kewaunee Power Station Annual Assessment Summary

Reactor Decommissioning Inspection Program Robert Krsek, Senior Resident Inspector, Kewaunee Power Station Rhex Edwards, Reactor Inspector, DNMS

Objectives of Inspection Program Ensure safety of decommissioning workers, members of the public and the environment throughout the decommissioning process.

Ensure licensee implementation of decommissioning activities are conducted in accordance with NRC requirements.

Prior to license termination verify residual radioactivity reduced to a level that permits unrestricted release of property.

27 Focus of Inspection Program Obtain information through direct observation and verification of licensee activities onsite.

Verify that licensee documents are implemented, and maintained as required by their NRC license.

Verify licensee activities, organization, and controls are effective to provide reasonable assurance that decommissioning is conducted safely and in accordance with our requirements

. 28 Regional Inspections Balanced look at a cross section of licensee activities important to the conduct of safe decommissioning.

Schedule and level of inspection effort is based on decommissioning activities planned or performed.

Provide flexibility in the application of inspection resources to promptly address any unexpected issues or problems

. 29 Inspection Areas Organization and Management Controls Quality Assurance Spent Fuel Storage and Handling Maintenance and Surveillance Radiation Protection Radiological Effluent and Environmental Monitoring Security Safety Evaluations Emergency Preparedness Fire Protection Radioactive Waste Packaging and Transportation Evaluate a Particular Safety Concern or Aspect of Licensee Performance 30 Master Inspection Plan Inspection Program will change from Inspection Manual Chapter (IMC) 2515 for Operating Reactors to IMC 2561 for Decommissioned Reactors Inspection Plan Developed on an Annual Basis, based on:

Plant Status / Phase of Decommissioning Licensee Performance, Staffing Plans, Effectiveness of Management Oversight, Timing and Scheduling of Significant Activities Level of Inspection is Pre

-Planned, Tailored to Planned Activities and Scheduled 31 ISFSI Inspection Program ISFSI = Independent Spent Fuel Storage Installation ISFSI inspections continue for as long as there is an ISFSI present at the site.

Oversight is designed to protect the material from terrorist threats and to ensure the protection of the public and the environment.

Inspectors examine whether licensee performs activities in accordance with licensing and regulatory requirements including radiation safety and quality assurance.

32 Region III Inspection Staff Robert Krsek, Senior Resident Inspector (920) 388-3156 Robert.Krsek@nrc.gov Rhex Edwards, Reactor Inspector (630) 829-9722 Rhex.Edwards@nrc.gov 33 34 Licensee Response and Remarks Dominion Energy Kewaunee, Inc.

35 Open to the Public The NRC places a high priority on keeping the public and stakeholders informed of its activities.

At www.nrc.gov, you can:

-Find public meeting dates and transcripts;

-Read NRC testimony, speeches, press releases, and policy decisions; and

-Access the agency's Electronic Reading Room to find NRC publications and documents.

36 Contacting the NRC Report an emergency

-(301) 816-5100 (call collect)

Report a safety concern

-(800) 695-7403 -Allegation@nrc.gov General information or questions

-www.nrc.gov

-Select "What We Do" for Public Affairs

Actions in Response to the Japan Nuclear Accident Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan

-info.html Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov Office of Public Affairs Point of Contact:

OPA.resource@nrc.gov or 301-415-8200 37 38 NRC Representatives Steve Reynolds, Director, Division Reactor Projects

-(630) 829-9600 Ken O'Brien, Deputy Division Director, DRP

-(630) 829-9601 Karl Feintuch , Project Manager, NRR

-(301) 415-3079 Rob Krsek, Senior Resident Inspector

-(920) 388-3156 Kevin Barclay, Resident Inspector

-(920) 388-3516 Ken Riemer, Branch Chief -(630) 829-9628 Nick Shah, Project Engineer -(630) 829-9821 39 NRC Representatives Bob Orlikowski , Chief, Decommissioning Branch (ISFSI)

-(630) 829-9753 Viktoria Mitlyng , Public Affairs Officer

-(630) 829-9662 Prema Chandrathil , Public Affairs Officer

-(630) 829-9663 Diana Betancourt, Senior Resident Inspector (Acting)

- {Point Beach}

-(920) 755-2309 Meghan Thorpe

-Kavanaugh , Resident Inspector

- {Point Beach} -(920) 755-2309 NRC Region III Office Switchboard

-(630) 829-9500 (800) 522-3025 NRC Social Media Channels Blog: http://public

-blog.nrc-gateway.gov/

Flickr: http://www.flickr.com/photos/nrcgov/

Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public

-involve/listserver.html#rss 40 41 Reference Sources Reactor Oversight Process

-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room

-http://www.nrc.gov/reading

-rm.html Public Document Room 800-397-4209 (Toll Free)

42 Reference Document Information Decommissioning Nuclear Power Plants; ML040340625 2012 Annual Assessment Letter; ML13060A111 Final Significance Determination, Emergency Preparedness; ML13094A270 NRC Follow

-up Assessment Letter; ML13098A970 Final Significance Determination, Fire Brigade; ML13121A317 Termination of the Reactor Oversight Process; ML13151A375 Transcripts of the April 24, 2013 Public Meeting re: Decommissioning Kewaunee Power Station; ML13168A558