{{#Wiki_filter:DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-PP-9WEquipment Class: (6) Vertical PumpsEquipment
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PP-9W Equipment Class: (6) Vertical Pumps Equipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY PUMPProject:
WEST CONTAINMENT SPRAY PUMP Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 573.00 ft, 52 Manufacturer/Model:
AB1, 573.00 ft, 52Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL, The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-PP-9WREVO
SQUG 1-PP-9WREVO
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-297 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-PP-9WEquipment Class: (6) Vertical PumpsEquipment
C-297 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-PP-9W Equipment Class: (6) Vertical Pumps Equipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST CONTAINMENT SPRAY PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall behind pump (small) -OK per DWG 12-4026, Wall W-9 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Block wall behind pump (small) -OK per DWG 12-4026, Wall W-99. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-298 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 1111 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1-PP-9w (6) Vertical Pumps WEST CONTAINMENT SPRAY P.C-299 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PP-9W Equipment Class: (6) Vertical Pumps C-300 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -PS-A Equipment Class: (1) Motor Control Centers Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-298 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 1111 NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1-PP-9w(6) Vertical PumpsWEST CONTAINMENT SPRAY P.C-299 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-PP-9WEquipment Class: (6) Vertical PumpsC-300 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -PS-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER PS-AProject:
600VAC MOTOR CONTROL CENTER PS-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
SH1,594.00 ft, 221 Manufacturer/Model:
SH1,594.00 ft, 221Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted to steel I-beam 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Mounted to steel I-beam5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-301 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-PS-AEquipment Class: (1) Motor Control CentersEauipment
Yes C-301 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-A Equipment Class: (1) Motor Control Centers Eauipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER PS-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER PS-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-302 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: ,inmint nolarrintinn" 1 -PS-A (1) Motor Control Centers)TOR CONTF C-303 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-A Equipment Class: (1) Motor Control Centers VAC MOTOR CONTROL (W814UD(U C-304 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (1) Mol 1 -PS-A or Control Centers OTOR CONTR I'14UO/4 C-305 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-A Equipment Class: (1) Motor Control Centers OVAC MOTOR CONTROl C-306 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) Other Equipment
CommentsEvaluated by: --George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-302 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:,inmint nolarrintinn" 1 -PS-A(1) Motor Control Centers)TOR CONTFC-303 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-AEquipment Class: (1) Motor Control CentersVAC MOTOR CONTROL (W814UD(UC-304 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (1) Mol1 -PS-Aor Control CentersOTOR CONTRI'14UO/4C-305 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-AEquipment Class: (1) Motor Control CentersOVAC MOTOR CONTROlC-306 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: T N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) OtherEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1Project:
AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 587.00 ft, 126 Manufacturer/Model:
AB2, 587.00 ft, 126Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-QT-106-AB1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-QT-106-AB1 REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-307 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-1 06-AB1 Equipment Class: (0) Other EauiDment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-307 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -QT-1 06-AB1Equipment Class: (0) OtherEauiDment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-308 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) Other CY [P9140516 C-309 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (0) Other 1-QT-106-ABI
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-308 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) OtherCY [P9140516C-309 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (0) Other1-QT-106-ABI
;Y I C-310 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) Other Equipment
;Y IC-310 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) OtherEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1C-311 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment  
AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1 C-311 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL FUEL OIL DAY TANKProject:
AB EMERGENCY DIESEL FUEL OIL DAY TANK Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-QT-107-AB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-QT-107-AB REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-312 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FN-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -QT-1 07-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment  
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-312 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y FN-] USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -QT-1 07-ABEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL FUEL OIL DAY TANKInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL FUEL OIL DAY TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 1-4033, Wall W-3 9. Do attached lines have adequate flexibility to avoid damage?No Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions
Fire extinguishers on short hooks -AR 2012-11669 was issued. Blockwall -OK per DWG 1-4033, Wall W-39. Do attached lines have adequate flexibility to avoid damage?NoYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: , -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-313 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶IN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment  
CommentsEvaluated by: , -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-313 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ¶IN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL FUEL OIL DAY TANKC-314 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L-] USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:l -QT-I107-AB (21) Tanks and Heat Exchangers
AB EMERGENCY DIESEL FUEL OIL DAY TANK C-314 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: l -QT-I107-AB (21) Tanks and Heat Exchangers
;y [P9130319C-315 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers
;y [P9130319 C-315 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers-- ; ;- AD -D I_ r V -lr- -I E1 IEI (V11 rlAV TAKIVl."I I ULL m C-316 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-130-AB2 Equipment Class: (5) Horizontal Pumps Equipment
-- ; ;- AD -D I_ r V -lr- -I E1 IEI (V11 rlAV TAKIVl."I I ULLmC-316 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-130-AB2 Equipment Class: (5) Horizontal PumpsEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL JACKET WATER PUMP #2Project:
AB EMERGENCY DIESEL JACKET WATER PUMP #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-QT-130-AB2
SQUG 1-QT-130-AB2
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
PAINTED4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
PAINTED 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-317 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -QT-1 30-AB2Equipment Class: (5) Horizontal PumpsEquipment
C-317 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -QT-1 30-AB2 Equipment Class: (5) Horizontal Pumps Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL JACKET WATER PUMP #2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL JACKET WATER PUMP #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-318 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-130-AB2 Equipment Class: (5) Horizontal Pumps E ui ment
CommentsEvaluated by: George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-318 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-130-AB2 Equipment Class: (5) Horizontal PumpsE ui ment


== Description:==
== Description:==


AB EMERGENCY DIESEL JACKET WATER PUMP #2P9130309 P9130310--AC-319 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1,09/12/13 Status: Y N] USeismic Walkdown Checklist (SWC)Equipment ID No.:1-QT-141-AB1 Equipment Class: (21) Tanks and Heat Exchangers Equipment  
AB EMERGENCY DIESEL JACKET WATER PUMP #2 P9130309 P9130310--A C-319 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: Y N] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-AB1 Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL STARTING AIR RECEIVER  
AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
#1Project:
AB1, 587.00 ft, 121 Manufacturer/Model:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
AB1, 587.00 ft, 121Manufacturer/Model:
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Additional space is provided at the end of this checklist for documentinq other comments.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-320 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L-N USeismic Walkdown Checklist (SWC)Equipment ID No.:I-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers Equipment  
Yes C-320 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL STARTING AIR RECEIVER  
AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
#1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution  
Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 1-4033, Wall W-3 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Yes No Other Adverse Conditions
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Fire extinguishers on short hooks -AR 2012-11669 was issued. Blockwall -OK per DWG 1-4033, Wall W-39. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesNoYesNoOther Adverse Conditions
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-321 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y E-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers MNY DIE rADTIF W- I At I C-322 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EI- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers (t-'! I C-323 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers Eauipment  
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-321 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y E-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers MNY DIErADTIFW- I At IC-322 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EI- USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers (t-'! IC-323 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers Eauipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL STARTING AIR RECEIVER  
AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 C-324 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors Equipment  
#1C-324 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors Equipment  


==
==
Line 217: Line 185:


AB EMERGENCY DIESEL STARTING AIR COMPRESSOR  
AB EMERGENCY DIESEL STARTING AIR COMPRESSOR  
#1Project:
#1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-3462 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Compressor on steel skid on concrete grout pad, anchored at base of skid.5. Is the anchorage configuration consistent with plant documentation?
DWG 12-34622. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?Compressor on steel skid on concrete grout pad, anchored at base ofskid.5. Is the anchorage configuration consistent with plant documentation?
C-325 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-QT-142-ABI Equipment Class: (12) Air Compressors Eauipment  
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-325 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-QT-142-ABI Equipment Class: (12) Air Compressors Eauipment  


==
==
Line 235: Line 200:


AB EMERGENCY DIESEL STARTING AIR COMPRESSOR  
AB EMERGENCY DIESEL STARTING AIR COMPRESSOR  
#1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
#1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-326 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors 4CY D W%' 1 1 4 -S .C-327 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors P9130338 C-328 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-AB1 Equipment Class: (12) Air Compressors Eauiment Descrirtion:
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-326 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors 4CY DW%' 1 1 4 -S .C-327 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors P9130338C-328 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-AB1 Equipment Class: (12) Air Compressors Eauiment Descrirtion:
AB EMERGENCY DIESEL STARTING AIR COMPRESSOR  
AB EMERGENCY DIESEL STARTING AIR COMPRESSOR  
#1C-329 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -QT-506Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
#1 C-329 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-506 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


TURBINE DRIVEN AUX FEED PUMP PP-4 TRIP AND THROTTLE VALVEProject:
TURBINE DRIVEN AUX FEED PUMP PP-4 TRIP AND THROTTLE VALVE Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
TB1, 591.00 ft, 50 Manufacturer/Model:
TB1, 591.00 ft, 50Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-330 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -QT-506Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-330 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -QT-506 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


TURBINE DRIVEN AUX FEED PUMP PP-4 TRIP AND THROTTLE VALVEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
TURBINE DRIVEN AUX FEED PUMP PP-4 TRIP AND THROTTLE VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesRight up against pipe insulation
Yes Right up against pipe insulation
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: i.,. .- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-331 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-506 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves AL DDA I C-332 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: i.,. .- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-331 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-506Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesALDDA IC-332 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F- NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -RCEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


REACTOR CONTROL RODS CONTROL PANELProject:
REACTOR CONTROL RODS CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Welded to embedded plates front and back through shim plates on back and unistrut in front 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Welded to embedded plates front and back through shim plates onback and unistrut in front5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-333 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -RCEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
Yes C-333 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR CONTROL RODS CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
REACTOR CONTROL RODS CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: "'-- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-334 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-RC Equipment Class: (20) Instrumentation and Control Panels and Cabinets TROL P9191247 C-335 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RPS-B3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: "'-- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-334 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-RCEquipment Class: (20) Instrumentation and Control Panels and CabinetsTROLP9191247C-335 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -RPS-B3Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Project:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-RPS-B REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
Panel welded to embedded plates through shim plates 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
SQUG 1-RPS-B REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable Yes C-336 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RPS-B3 Equipment Class: (20) Instrumentation and Control Panels. and Cabinets Equipment
YesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Panel welded to embedded plates through shim plates6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable YesC-336 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -RPS-B3Equipment Class: (20) Instrumentation and Control Panels. and CabinetsEquipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-337 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-RPS-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets pment
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-337 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.: I-RPS-BEquipment Class: (20) Instrumentation and Control Panels and Cabinetspment


== Description:==
== Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191169C-338 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I -RPS-B(20) Instrumentation and Control Panels and Cabinets)TECTI(II I IC-339 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPS-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191169 C-338 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -RPS-B (20) Instrumentation and Control Panels and Cabinets)TECTI(II I I C-339 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPS-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191176C-340 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I-RPST-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191176 C-340 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Project:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Additional space is provided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinci other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel welded to embedded plate through shim plates -there is spalling around top of embed plate on front right comer 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Panel welded to embedded plate through shim plates -there isspalling around top of embed plate on front right comer5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-341 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -RPST-B3Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
Yes C-341 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -RPST-B3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-342 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets)TEC thU1 15b C-343 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets A f1l TEC1 P9191191 C-344 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: --George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-342 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-BEquipment Class: (20) Instrumentation and Control Panels and Cabinets)TECthU1 15bC-343 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsA f1lTEC1P9191191C-344 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191192C-345 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -RPSX-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191192 C-345 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RPSX-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Project:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 633.00 ft, 123 Manufacturer/Model:
ABI, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel welded to embedded plates through shim plates 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Panel welded to embedded plates through shim plates5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-346 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-RPSX-B.Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
Yes C-346 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-B.Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-347 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: E] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-347 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: E] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION Iý II' 1 1 v~C-348 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-BEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
REACTOR PROTECTION AND SAFEGUARD ACTUATION Iý II' 1 1 v~C-348 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


REACTOR PROTECTION AND SAFEGUARD ACTUATION ftul~1 I OZC-349 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -SGEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
REACTOR PROTECTION AND SAFEGUARD ACTUATION ftul~1 I OZ C-349 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROLProject:
STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-SG REV1 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Embedded plates welded to shim plates in back (3 plates) and welded to unistrut in the front 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
SQUG 1-SG REV12. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable Yes Yes C-350 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
YesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Embedded plates welded to shim plates in back (3 plates) and weldedto unistrut in the front5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable YesYesC-350 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-SGEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROLInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: '"-J George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-351 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets TOR C-352 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets Q(TMAKA t'-CI:IMDAT-r D AKII' Al IYII IAIDV I=CTll DI IliAD InKlTl It"1lI UI\  
CommentsEvaluated by: '"-J George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-351 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SGEquipment Class: (20) Instrumentation and Control Panels and CabinetsTORC-352 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SGEquipment Class: (20) Instrumentation and Control Panels and Cabinets Q(TMAKA t'-CI:IMDAT-r D AKII' Al IYII IAIDV I=CTll DI IliAD InKlTl It"1lI UI\  
/'IW.C-353 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
/'IW.C-353 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L-N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SISEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


SAFETY INJECTION CONTROL PANELProject:
SAFETY INJECTION CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-SIS 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Panel welded to embedded plate through thick shim plates 5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-SIS2. Is the anchorage free of bent, broken, missing or loose hardware?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
SQUG SEW package for 1-SIS was incomplete and did not contain the detailed information or sketches of the anchorage configuration.
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Panel welded to embedded plate through thick shim plates5. Is the anchorage configuration consistent with plant documentation?
AR 2012-13310, Panel 1-SIS anchorage documentation could not be located was generated as a result 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
No(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
C-354 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y Wi U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-S's Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
SQUG SEW package for 1-SIS was incomplete and did not containthe detailed information or sketches of the anchorage configuration.
AR2012-13310, Panel 1-SIS anchorage documentation could not belocated was generated as a result6. Based on the above anchorage evaluations, is the anchorage free of Nopotentially adverse seismic conditions?
C-354 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y Wi USeismic Walkdown Checklist (SWC)Equipment ID No.:1-S'sEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


SAFETY INJECTION CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
SAFETY INJECTION CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: " -George G Thomas Date: 10/18/12 4 " Neda Stoeva 10/18/12 C-355 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y [NI U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equioment DescriDtion:
CommentsEvaluated by: " -George G Thomas Date: 10/18/124 " Neda Stoeva 10/18/12C-355 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y [NI USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Equioment DescriDtion:
1-S'S (20) Instrumentation and Control Panels and Cabinets SAFETY INJECTION CONTROL PANEL C-356 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets TiON C C-357 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y LNI U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets ,FETY INJECTION CONTROL P, C-358 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:
1-S'S(20) Instrumentation and Control Panels and CabinetsSAFETY INJECTION CONTROL PANELC-356 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SISEquipment Class: (20) Instrumentation and Control Panels and CabinetsTiON CC-357 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y LNI USeismic Walkdown Checklist (SWC)Equipment ID No.: I-SISEquipment Class: (20) Instrumentation and Control Panels and Cabinets,FETY INJECTION CONTROL P,C-358 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SISEquipment Class: (20) Instrumentation and Control Panels and CabinetsEauiDment DescriDtion:
SAFETY INJECTION CONTROL PANEL C-359 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
SAFETY INJECTION CONTROL PANELC-359 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYI NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-SPYEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


CONTAINMENT SPRAY CONTROL PANELProject:
CONTAINMENT SPRAY CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel welded to embedded plate through shim plates -2 places 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Panel welded to embedded plate through shim plates -2 places5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-360 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-SPYEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
Yes C-360 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


CONTAINMENT SPRAY CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTAINMENT SPRAY CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -:"/:.-s. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-361 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-362 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets TSF C-363 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N LU Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TDAB Equipment Class: (14) Distribution Panels Equipment
CommentsEvaluated by: -:"/:.-s.
George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-361 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPYEquipment Class: (20) Instrumentation and Control Panels and CabinetsC-362 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPYEquipment Class: (20) Instrumentation and Control Panels and CabinetsTSFC-363 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N LUSeismic Walkdown Checklist (SWC)Equipment ID No.: 1-TDABEquipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


250VDC TRAIN 'B' TRANSFER CABINETProject:
250VDC TRAIN 'B' TRANSFER CABINET Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 200 Manufacturer/Model:
AB1, 609.00 ft, 200Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
CANNOT OPEN OR SEE ANY ANCHORAGE 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Unknown 3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?5. Is the anchorage configuration consistent with plant documentation?
CANNOT OPEN OR SEE ANY ANCHORAGE
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
Unknown3. Is the anchorage free of corrosion that is more than mild surface Unknownoxidation?
CANNOT OPEN OR SEE ANY ANCHORAGE C-364 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U-1 Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -TDAB Equipment Class: (14) Distribution Panels Equipment
: 4. Is the anchorage free of visible cracks in the concrete near the Unknownanchors?5. Is the anchorage configuration consistent with plant documentation?
Unknown(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Unknownpotentially adverse seismic conditions?
CANNOT OPEN OR SEE ANY ANCHORAGE C-364 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N U-1Seismic Walkdown Checklist (SWC)Equipment ID No.:1 -TDABEquipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


25OVDC TRAIN 'B' TRANSFER CABINETInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
25OVDC TRAIN 'B' TRANSFER CABINET Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions thatcould adversely affect the safety functions of the equipment?
Could not open due to safety concern during online walkdown.Completed inspection during DCCNPI Unit I Outage Walkdown.Checklist included in report following Table C-3.Unknown Comments Evaluated by: Evaluated by: George G Thomas Neda Stoeva Date: 08/15/2013 08/15/2013 C-365 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N F Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment  
Could not open due to safety concern during online walkdown.
Completed inspection during DCCNPI Unit I Outage Walkdown.
Checklist included in report following Table C-3.UnknownCommentsEvaluated by:Evaluated by: George G ThomasNeda StoevaDate: 08/15/2013 08/15/2013 C-365 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N FSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Eauipment  


==
==
Description:==
Description:==


I-TDAB(14) Distribution Panels250VDC TRAIN 'B' TRANSFER CABINETC-366 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (14) Di=Eauinment Descriotion:
I-TDAB (14) Distribution Panels 250VDC TRAIN 'B' TRANSFER CABINET C-366 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (14) Di=Eauinment Descriotion:
250VD1-TDABstribution Panels11'B 1C-367 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EIN] USeismic Walkdown Checklist (SWC)Equipment ID No.:1-TR11AEquipment Class: (4) Transformers Equipment  
250VD 1-TDAB stribution Panels 11'B 1 C-367 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EIN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR11A Equipment Class: (4) Transformers Equipment  


==
==
Description:==
Description:==


600VAC BUS 11A SUPPLY TRANSFORMER Project:
600VAC BUS 11A SUPPLY TRANSFORMER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 204 Manufacturer/Model:
AB1, 609.00 ft, 204Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional soace is Drovided at the end of this checklist for documentina other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional soace is Drovided at the end of this checklist for documentina other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-368 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L-- USeismic Walkdown Checklist (SWC)Equipment ID No.:1-TR11AEquipment Class: (4) Transformers Equipment  
Yes C-368 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR11A Equipment Class: (4) Transformers Equipment  


==
==
Description:==
Description:==


600VAC BUS 11A SUPPLY TRANSFORMER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC BUS 11A SUPPLY TRANSFORMER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 1-4034, Wall W- 1 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Yes No Other Adverse Conditions
Fire extinguishers on short hooks -AR 2012-11669 was issued. Blockwall -OK per DWG 1-4034, Wall W- 19. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesNoYesNoOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Could not open -anchorage was verified.Comments Evaluated by: ', , -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-369 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TRIIA Equipment Class: (4) Transformers JAC BUS 11A SUPPLY T C-370 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-I] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TRIIA Equipment Class: (4) Transformers 11 A SUPPLY TRANSFORMER C-371 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -TR-AFWX Equipment Class: (4) Transformers Eciuioment  
Could not open -anchorage was verified.
CommentsEvaluated by: ', , -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-369 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ¶-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-TRIIAEquipment Class: (4) Transformers JAC BUS 11A SUPPLY TC-370 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L-I] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-TRIIAEquipment Class: (4) Transformers 11 A SUPPLY TRANSFORMER C-371 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: YJ NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -TR-AFWXEquipment Class: (4) Transformers Eciuioment  


==
==
Description:==
Description:==


120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANELProject:
120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 122 Manufacturer/Model:
AB1, 587.00 ft, 122Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
SQUG 1-TR-AFWREVO
SQUG 1-TR-AFWREVO
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes A Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YesAYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes C-372 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-TR-AFWX Equipment Class: (4) Transformers Equipment  
Yes6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-372 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-TR-AFWX Equipment Class: (4) Transformers Equipment  


==
==
Description:==
Description:==


120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: ' George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-373 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -TR-AFWX (4) Transformers 1 -TR-AFWX (4) Transformers E ui ment uescri tion: 1ZU/ZUdVAU AU)P9130343 (ILIARY FEEDWAT P9130346 C-374 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (4) Transformers I -TR-AFWX_IARY F C-375 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (4) Transformers
CommentsEvaluated by: ' George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-373 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I -TR-AFWX(4) Transformers 1 -TR-AFWX(4) Transformers E ui ment uescri tion: 1ZU/ZUdVAU AU)P9130343(ILIARY FEEDWATP9130346C-374 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (4) Transformers I -TR-AFWX_IARY FC-375 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (4) Transformers
:ni mnmýnt frl¢arrinfitin.
:ni mnmýnt frl¢arrinfitin.
19n 9nRIA\ .AI I'I -TR-AFWX(ILIARY FV b" I JC-376 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR-AFWX Equipment Class: (4) Transformers EauiDment  
19n 9nRIA\ .AI I'I -TR-AFWX (ILIARY FV b" I J C-376 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR-AFWX Equipment Class: (4) Transformers EauiDment  


==
==
Description:==
Description:==


120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANELC-377 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -WMO-702Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANEL C-377 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST ESSENTIAL SERVICE WTR PUMP PP-7W DISCH S/O VAProject:
WEST ESSENTIAL SERVICE WTR PUMP PP-7W DISCH S/O VA Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
SH1, 591.00 ft, 136 Manufacturer/Model:
SH1, 591.00 ft, 136Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-378 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I-WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-378 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST ESSENTIAL SERVICE WTR PUMP PP-7W DISCH S/0 VAInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST ESSENTIAL SERVICE WTR PUMP PP-7W DISCH S/0 VA Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes I 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
YesI9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-379 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves nnc.prinfinn XAIIF-.T I:::..1::MTIAI  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-379 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves nnc.prinfinn XAIIF-.T I:::..1::MTIAI  
.I\/I(.F XA/TP P IIAP PP-7\AI -W ./n \/A C-380 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
.I\/I(.F XA/TP P IIAP PP-7\AI -W ./n \/AC-380 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER 1-HE-18WProject:
WEST CONTAINMENT SPRAY HEAT EXCHANGER 1-HE-18W Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 633 Manufacturer/Model:
AB1, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Support for pipe OK by engineering (thread engagement of bolts) Ref DOC# A 158433 01 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Support for pipe OK by engineering (thread engagement of bolts) RefDOC# A 158433 013. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-381 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -WMO-715Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-381 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER 1-HE-18WInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST CONTAINMENT SPRAY HEAT EXCHANGER 1-HE-18W Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: , " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-382 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves T CONTAINMENT P9100095 C-383 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eguipment
CommentsEvaluated by: , " George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-382 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesT CONTAINMENT P9100095C-383 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N- USeismic Walkdown Checklist (SWC)Equipment ID No.:1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEguipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Project:
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 609 Manufacturer/Model:
AB1, 609.00 ft, 609Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-384 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y jT USeismic Walkdown Checklist (SWC)Equipment ID No.:1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-384 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jT U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers by 1-WMO-717  
Fire extinguishers by 1-WMO-717  
-short hooks -AR 2012-11669 wasissued.9. Do attached lines have adequate flexibility to avoid damage?NoYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
-short hooks -AR 2012-11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?No Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-385 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y Ei` USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesI=niinmant nfac\rintinn  
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-385 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y Ei` U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves I=niinmant nfac\rintinn  
%AIFgqT tflNITAINIKIPNIT 5ZPPAV HlAT PY(I-HAIIFIP Pq.(IlPNTIAI C-386 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -WMO-744Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
%AIFgqT tflNITAINIKIPNIT 5ZPPAV HlAT PY(I-HAIIFIP Pq.(IlPNTIAI C-386 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WMO-744 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVENProject:
ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVEN Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
TBI, 591.00 ft, 51 Manufacturer/Model:
TBI, 591.00 ft, 51Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Additional sDace is Drovided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional sDace is Drovided at the end of this checklist for documentinci other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-387 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -WMO-744Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-387 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WMO-744 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVENInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVEN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Bottom unistrut left bolt missing, unistrut holds up electrical panel for 1-WMO-744  
Bottom unistrut left bolt missing, unistrut holds up electrical panel for1-WMO-744  
-Acceptable As Is per CR 99-9360-02 Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-388 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: ioment Descriotion:
-Acceptable As Is per CR 99-9360-02 CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-388 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:ioment Descriotion:
1 -WMO-744 (8) Motor-Operated and Solenoid-Operated Valves ESSENTIAL SERVICE C-389 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
1 -WMO-744(8) Motor-Operated and Solenoid-Operated ValvesESSENTIAL SERVICEC-389 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -WMO-753Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER TO TURBINE DRIVENProject:
ESSENTIAL SERVICE WATER TO TURBINE DRIVEN Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
TB1, 591.00 ft, 50 Manufacturer/Model:
TB1, 591.00 ft, 50Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-390 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -WMO-753Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-390 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER TO TURBINE DRIVENInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
ESSENTIAL SERVICE WATER TO TURBINE DRIVEN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-391 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves fImii, nnmfnt Fl, IMTIAI '::1\/1C1:  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-391 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesfImii, nnmfnt Fl, IMTIAI '::1\/1C1:  
\AIATIf T() TI 1IP Kl:: flPi\/::Ki C-392 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WPA-702 Equipment Class: (18) Instruments on Racks Equipment
\AIATIf T() TI 1IP Kl:: flPi\/::Ki C-392 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -WPA-702Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


WEST ESW PUMP PP-7W DISCH LOW PRES ALARM XMTRProject:
WEST ESW PUMP PP-7W DISCH LOW PRES ALARM XMTR Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
SHI, 591.00 ft, 136 Manufacturer/Model:
SHI, 591.00 ft, 136Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
2 U-bolts 2. Is the anchorage free of bent, broken, missing or loose hardware?Vertical bolts at top of rack do not have full thread engagement, but are OK, because they are only loaded in shear 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
No Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted on instrument rack 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
2 U-bolts2. Is the anchorage free of bent, broken, missing or loose hardware?
Vertical bolts at top of rack do not have full thread engagement, butare OK, because they are only loaded in shear3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
NoYesYes4. Is the anchorage free of visible cracks in the concrete near theanchors?Mounted on instrument rack5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-393 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -WPA-702Equipment Class: (18) Instruments on RacksEquipment
Yes C-393 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WPA-702 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


WEST ESW PUMP PP-7W DISCH LOW PRES ALARM XMTRInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST ESW PUMP PP-7W DISCH LOW PRES ALARM XMTR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-394 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WPA-702 Eauioment Class: (18) Instruments on Racks Dment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-394 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-WPA-702 Eauioment Class: (18) Instruments on RacksDment


== Description:==
== Description:==


fWEST ESW PUMP PP-7C-395 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-WPA-702 Equipment Class: (18) Instruments on Racksiiiinmant frlcr-rini)n" XAIIZT IZAA PHRIP PP-7AI iC1-11 i ()\AI PPrI:: Al AP/ YMATPC-396}}
f WEST ESW PUMP PP-7 C-395 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WPA-702 Equipment Class: (18) Instruments on Racks iiiinmant frlcr-rini)n" XAIIZT IZAA PHRIP PP-7AI iC1-11 i ()\AI PPrI:: Al AP/ YMATP C-396}}

Latest revision as of 23:04, 13 July 2018

SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-297 Through Page C-396
ML13267A320
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2013
From: Stoeva N
Stevenson & Associates
To:
American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation
Shared Package
ML13267A279 List:
References
AEP-NRC-2013-074 SD-121023-001, Rev 1
Download: ML13267A320 (100)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PP-9W Equipment Class: (6) Vertical Pumps Equipment

==

Description:==

WEST CONTAINMENT SPRAY PUMP Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-PP-9WREVO

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-297 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-PP-9W Equipment Class: (6) Vertical Pumps Equipment

==

Description:==

WEST CONTAINMENT SPRAY PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind pump (small) -OK per DWG 12-4026, Wall W-9 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-298 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 1111 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1-PP-9w (6) Vertical Pumps WEST CONTAINMENT SPRAY P.C-299 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PP-9W Equipment Class: (6) Vertical Pumps C-300 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -PS-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER PS-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

SH1,594.00 ft, 221 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted to steel I-beam 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-301 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-A Equipment Class: (1) Motor Control Centers Eauipment

==

Description:==

600VAC MOTOR CONTROL CENTER PS-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-302 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: ,inmint nolarrintinn" 1 -PS-A (1) Motor Control Centers)TOR CONTF C-303 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-A Equipment Class: (1) Motor Control Centers VAC MOTOR CONTROL (W814UD(U C-304 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (1) Mol 1 -PS-A or Control Centers OTOR CONTR I'14UO/4 C-305 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-PS-A Equipment Class: (1) Motor Control Centers OVAC MOTOR CONTROl C-306 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) Other Equipment

==

Description:==

AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 126 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-QT-106-AB1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-307 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-1 06-AB1 Equipment Class: (0) Other EauiDment

==

Description:==

AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-308 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) Other CY [P9140516 C-309 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (0) Other 1-QT-106-ABI

Y I C-310 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status
F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-106-ABI Equipment Class: (0) Other Equipment

==

Description:==

AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #1 C-311 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

AB EMERGENCY DIESEL FUEL OIL DAY TANK Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-QT-107-AB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-312 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FN-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -QT-1 07-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

AB EMERGENCY DIESEL FUEL OIL DAY TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 1-4033, Wall W-3 9. Do attached lines have adequate flexibility to avoid damage?No Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: , -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-313 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶IN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

AB EMERGENCY DIESEL FUEL OIL DAY TANK C-314 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: l -QT-I107-AB (21) Tanks and Heat Exchangers

y [P9130319 C-315 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status
Y U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-107-AB Equipment Class: (21) Tanks and Heat Exchangers-- ; ;- AD -D I_ r V -lr- -I E1 IEI (V11 rlAV TAKIVl."I I ULL m C-316 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-130-AB2 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

AB EMERGENCY DIESEL JACKET WATER PUMP #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-QT-130-AB2

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

PAINTED 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-317 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -QT-1 30-AB2 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

AB EMERGENCY DIESEL JACKET WATER PUMP #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-318 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-130-AB2 Equipment Class: (5) Horizontal Pumps E ui ment

Description:

AB EMERGENCY DIESEL JACKET WATER PUMP #2 P9130309 P9130310--A C-319 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: Y N] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-AB1 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-320 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 1-4033, Wall W-3 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Yes No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-321 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y E-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers MNY DIE rADTIF W- I At I C-322 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EI- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers (t-'! I C-323 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-141-ABI Equipment Class: (21) Tanks and Heat Exchangers Eauipment

==

Description:==

AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 C-324 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors Equipment

==

Description:==

AB EMERGENCY DIESEL STARTING AIR COMPRESSOR

  1. 1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3462 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Compressor on steel skid on concrete grout pad, anchored at base of skid.5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-325 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-QT-142-ABI Equipment Class: (12) Air Compressors Eauipment

==

Description:==

AB EMERGENCY DIESEL STARTING AIR COMPRESSOR

  1. 1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-326 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors 4CY D W%' 1 1 4 -S .C-327 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-ABI Equipment Class: (12) Air Compressors P9130338 C-328 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-QT-142-AB1 Equipment Class: (12) Air Compressors Eauiment Descrirtion:

AB EMERGENCY DIESEL STARTING AIR COMPRESSOR

  1. 1 C-329 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-506 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

TURBINE DRIVEN AUX FEED PUMP PP-4 TRIP AND THROTTLE VALVE Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

TB1, 591.00 ft, 50 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-330 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -QT-506 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

TURBINE DRIVEN AUX FEED PUMP PP-4 TRIP AND THROTTLE VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Right up against pipe insulation

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: i.,. .- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-331 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -QT-506 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves AL DDA I C-332 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR CONTROL RODS CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Welded to embedded plates front and back through shim plates on back and unistrut in front 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-333 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR CONTROL RODS CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: "'-- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-334 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-RC Equipment Class: (20) Instrumentation and Control Panels and Cabinets TROL P9191247 C-335 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RPS-B3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

SQUG 1-RPS-B REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Panel welded to embedded plates through shim plates 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes C-336 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RPS-B3 Equipment Class: (20) Instrumentation and Control Panels. and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-337 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-RPS-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets pment

Description:

REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191169 C-338 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -RPS-B (20) Instrumentation and Control Panels and Cabinets)TECTI(II I I C-339 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPS-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191176 C-340 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional space is provided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel welded to embedded plate through shim plates -there is spalling around top of embed plate on front right comer 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-341 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -RPST-B3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-342 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets)TEC thU1 15b C-343 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets A f1l TEC1 P9191191 C-344 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION P9191192 C-345 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -RPSX-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel welded to embedded plates through shim plates 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-346 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-B.Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-347 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: E] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION Iý II' 1 1 v~C-348 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-RPSX-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

REACTOR PROTECTION AND SAFEGUARD ACTUATION ftul~1 I OZ C-349 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

SQUG 1-SG REV1 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Embedded plates welded to shim plates in back (3 plates) and welded to unistrut in the front 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-350 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: '"-J George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-351 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets TOR C-352 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SG Equipment Class: (20) Instrumentation and Control Panels and Cabinets Q(TMAKA t'-CI:IMDAT-r D AKII' Al IYII IAIDV I=CTll DI IliAD InKlTl It"1lI UI\

/'IW.C-353 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

SAFETY INJECTION CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-SIS 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Panel welded to embedded plate through thick shim plates 5. Is the anchorage configuration consistent with plant documentation?

No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG SEW package for 1-SIS was incomplete and did not contain the detailed information or sketches of the anchorage configuration.

AR 2012-13310, Panel 1-SIS anchorage documentation could not be located was generated as a result 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

C-354 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y Wi U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-S's Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

SAFETY INJECTION CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: " -George G Thomas Date: 10/18/12 4 " Neda Stoeva 10/18/12 C-355 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y [NI U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equioment DescriDtion:

1-S'S (20) Instrumentation and Control Panels and Cabinets SAFETY INJECTION CONTROL PANEL C-356 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets TiON C C-357 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y LNI U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets ,FETY INJECTION CONTROL P, C-358 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:

SAFETY INJECTION CONTROL PANEL C-359 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTAINMENT SPRAY CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel welded to embedded plate through shim plates -2 places 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-360 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTAINMENT SPRAY CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -:"/:.-s. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-361 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-362 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-SPY Equipment Class: (20) Instrumentation and Control Panels and Cabinets TSF C-363 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N LU Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TDAB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

250VDC TRAIN 'B' TRANSFER CABINET Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 609.00 ft, 200 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

CANNOT OPEN OR SEE ANY ANCHORAGE 2. Is the anchorage free of bent, broken, missing or loose hardware?

Unknown 3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?5. Is the anchorage configuration consistent with plant documentation?

Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?

CANNOT OPEN OR SEE ANY ANCHORAGE C-364 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U-1 Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -TDAB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

25OVDC TRAIN 'B' TRANSFER CABINET Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

Could not open due to safety concern during online walkdown.Completed inspection during DCCNPI Unit I Outage Walkdown.Checklist included in report following Table C-3.Unknown Comments Evaluated by: Evaluated by: George G Thomas Neda Stoeva Date: 08/15/2013 08/15/2013 C-365 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N F Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment

==

Description:==

I-TDAB (14) Distribution Panels 250VDC TRAIN 'B' TRANSFER CABINET C-366 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (14) Di=Eauinment Descriotion:

250VD 1-TDAB stribution Panels 11'B 1 C-367 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EIN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR11A Equipment Class: (4) Transformers Equipment

==

Description:==

600VAC BUS 11A SUPPLY TRANSFORMER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 609.00 ft, 204 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional soace is Drovided at the end of this checklist for documentina other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-368 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR11A Equipment Class: (4) Transformers Equipment

==

Description:==

600VAC BUS 11A SUPPLY TRANSFORMER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 1-4034, Wall W- 1 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Yes No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Could not open -anchorage was verified.Comments Evaluated by: ', , -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-369 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TRIIA Equipment Class: (4) Transformers JAC BUS 11A SUPPLY T C-370 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L-I] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TRIIA Equipment Class: (4) Transformers 11 A SUPPLY TRANSFORMER C-371 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -TR-AFWX Equipment Class: (4) Transformers Eciuioment

==

Description:==

120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 122 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

SQUG 1-TR-AFWREVO

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes A Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-372 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-TR-AFWX Equipment Class: (4) Transformers Equipment

==

Description:==

120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: ' George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-373 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -TR-AFWX (4) Transformers 1 -TR-AFWX (4) Transformers E ui ment uescri tion: 1ZU/ZUdVAU AU)P9130343 (ILIARY FEEDWAT P9130346 C-374 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (4) Transformers I -TR-AFWX_IARY F C-375 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (4) Transformers

ni mnmýnt frl¢arrinfitin.

19n 9nRIA\ .AI I'I -TR-AFWX (ILIARY FV b" I J C-376 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-TR-AFWX Equipment Class: (4) Transformers EauiDment

==

Description:==

120/208VAC AUXILIARY FEEDWATER DISTRIBUTION PANEL C-377 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST ESSENTIAL SERVICE WTR PUMP PP-7W DISCH S/O VA Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

SH1, 591.00 ft, 136 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-378 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST ESSENTIAL SERVICE WTR PUMP PP-7W DISCH S/0 VA Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes I 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-379 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-702 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves nnc.prinfinn XAIIF-.T I:::..1::MTIAI

.I\/I(.F XA/TP P IIAP PP-7\AI -W ./n \/A C-380 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER 1-HE-18W Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 633 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Support for pipe OK by engineering (thread engagement of bolts) Ref DOC# A 158433 01 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-381 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER 1-HE-18W Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: , " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-382 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-715 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves T CONTAINMENT P9100095 C-383 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eguipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 609.00 ft, 609 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-384 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jT U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers by 1-WMO-717

-short hooks -AR 2012-11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?No Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-385 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y Ei` U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-717 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves I=niinmant nfac\rintinn

%AIFgqT tflNITAINIKIPNIT 5ZPPAV HlAT PY(I-HAIIFIP Pq.(IlPNTIAI C-386 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WMO-744 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVEN Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

TBI, 591.00 ft, 51 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional sDace is Drovided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-387 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WMO-744 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVEN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Bottom unistrut left bolt missing, unistrut holds up electrical panel for 1-WMO-744

-Acceptable As Is per CR 99-9360-02 Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-388 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: ioment Descriotion:

1 -WMO-744 (8) Motor-Operated and Solenoid-Operated Valves ESSENTIAL SERVICE C-389 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

ESSENTIAL SERVICE WATER TO TURBINE DRIVEN Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

TB1, 591.00 ft, 50 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-390 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

ESSENTIAL SERVICE WATER TO TURBINE DRIVEN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-391 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WMO-753 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves fImii, nnmfnt Fl, IMTIAI '::1\/1C1:

\AIATIf T() TI 1IP Kl:: flPi\/::Ki C-392 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -WPA-702 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

WEST ESW PUMP PP-7W DISCH LOW PRES ALARM XMTR Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

SHI, 591.00 ft, 136 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2 U-bolts 2. Is the anchorage free of bent, broken, missing or loose hardware?Vertical bolts at top of rack do not have full thread engagement, but are OK, because they are only loaded in shear 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

No Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted on instrument rack 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-393 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -WPA-702 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

WEST ESW PUMP PP-7W DISCH LOW PRES ALARM XMTR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-394 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WPA-702 Eauioment Class: (18) Instruments on Racks Dment

Description:

f WEST ESW PUMP PP-7 C-395 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-WPA-702 Equipment Class: (18) Instruments on Racks iiiinmant frlcr-rini)n" XAIIZT IZAA PHRIP PP-7AI iC1-11 i ()\AI PPrI:: Al AP/ YMATP C-396