ML14104B130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713 April 14, 2014 MEETING SUMMARY LICENSEE: PPL SUSQUEHANNA, LLC.  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713 April 14, 2014 MEETING  
 
==SUMMARY==
 
LICENSEE: PPL SUSQUEHANNA, LLC.  


FACILITY: SUSQUEHANNA GENERATI NG STATION, UNITS 1 AND 2  
FACILITY: SUSQUEHANNA GENERATI NG STATION, UNITS 1 AND 2  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF PUBLIC MEETING On April 9, 2014 at 6:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a meeting with PPL Susquehanna senior managers at the Susquehanna Energy Information Center in Berwick, PA. The NRC discussed its assessment of the safety performance at Susquehanna Steam Electric Station for 2013. The meeting was open for public observation.
A notice of the meeting was issued on March 12, 2014, and was posted on the NRC's external


(public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14071A532. ADAMS is accessible from the NRC Web page at:  http://www.nrc.gov/reading-rm/adams.html
==SUMMARY==
. The NRC presentation is attached. During t he meeting, PPL management discussed the  status of their initiatives related to improving the quality of corrective action program evaluations. Additional information relative to the NRC's Annual Assessment Process and   
OF PUBLIC MEETING On April 9, 2014 at 6:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a meeting with PPL Susquehanna senior managers at the Susquehanna Energy Information Center in Berwick, PA. The NRC discussed its assessment of the safety performance at Susquehanna Steam Electric Station for 2013. The meeting was open for public observation.
A notice of the meeting was issued on March 12, 2014, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14071A532. ADAMS is accessible from the NRC Web page at:  http://www.nrc.gov/reading-rm/adams.html. The NRC presentation is attached. During t he meeting, PPL management discussed the  status of their initiatives related to improving the quality of corrective action program evaluations. Additional information relative to the NRC's Annual Assessment Process and   


safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at:  www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at:  www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Revision as of 18:49, 9 July 2018

Susquehanna - Summary of Public Meeting on April 9, 2014
ML14104B130
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/14/2014
From: Bower F L
Reactor Projects Region 1 Branch 4
To:
BOWER, FL
Shared Package
ML14063A450 List:
References
Download: ML14104B130 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 14, 2014 MEETING

SUMMARY

LICENSEE: PPL SUSQUEHANNA, LLC.

FACILITY: SUSQUEHANNA GENERATI NG STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 9, 2014 at 6:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a meeting with PPL Susquehanna senior managers at the Susquehanna Energy Information Center in Berwick, PA. The NRC discussed its assessment of the safety performance at Susquehanna Steam Electric Station for 2013. The meeting was open for public observation.

A notice of the meeting was issued on March 12, 2014, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14071A532. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presentation is attached. During t he meeting, PPL management discussed the status of their initiatives related to improving the quality of corrective action program evaluations. Additional information relative to the NRC's Annual Assessment Process and

safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The meeting with PPL managers was completed within approximately one hour. The NRC staff then hosted a question and answer discussion with members of the public and media in attendance regarding Susquehanna's performance and the role of the agency in ensuring safe plant operations.

/RA/ Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML14104A018) NRC Presentation (ML14100A371)

ML14104B130 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/ FLB for FBower/ FLB DATE 0414/14 04 /14/14