ML17264A591: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:('A'19'(90RYjREGULARYINFORMATION DISTRIBUTI SYSTEM(RIDS)1ACCESSION NBR:9609130028 DOC.DATE:
{{#Wiki_filter:('A'1 9'(90RY j REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)1 ACCESSION NBR:9609130028 DOC.DATE: 96/09/05 NOTARIZED:
96/09/05NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MARTIN,J.T.
NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MARTIN,J.T.
Rochester Gas&Electric Corp.MERCREDY,R.C.
Rochester Gas&ElectricCorp.MERCREDY,R.C.
Rochester Gas a Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSINGiG.S.
Rochester GasaElectricCorp.RECIP.NAME RECIPIENT AFFILIATION VISSINGiG.S.


==SUBJECT:==
==SUBJECT:==
LER96-011-00:on 960807,improper configuration ofcircuitbreakeroccurred.Due toundetected internalinterference, resulting inautomatic startofbothauxiliary feedwater pumps.RunningAFWpumpsweresecured.W/960905 ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR
LER 96-011-00:on 960807,improper configuration of circuit breaker occurred.Due to undetected internal interference, resulting in automatic start of both auxiliary feedwater pumps.Running AFW pumps were secured.W/960905 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR
/ENCL(SIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),incidentRpt,etc.NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
/ENCL (SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), incident Rpt, etc.NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244ERECIPIENT IDCODE/NAME PD1-1PDINTERNAL:
05000244 E RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: E./Mig/EQB FILE CENA~/5E/EELB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN1 FILE 01 COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.
E./Mig/EQB FILECENA~/5E/EELBNRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN1FILE01COPIESLTTRENCL112211111111111111RECIPIENT IDCODE/NAME VISSING,G.
AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DSIR/EIB COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR 1 1 1 1 1 1 LITCO BRYCE,J H.'vAC POORE,W.NUDOCS FULL TXT 2 2 1 1 1 1 N NOTE TO ALL"RIDS" RECIPIENTS:
AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DSIR/EIB COPIESLTTRENCL1111111111111111D0EXTERNAL:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT~415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COP,;-~S REQUIRED: LTTR 25 ENCL 25 4ND ROCHESTERGASANDELECTRICCORPORATION
LSTLOBBYWARDNOACMURPHY,G.A NRCPDR111111LITCOBRYCE,JH.'vACPOORE,W.NUDOCSFULLTXT221111NNOTETOALL"RIDS"RECIPIENTS:
~89EASTAVfNUE,ROCHESTER,N.Y Id6d9000I 7 AREA CODE7165d62700 ROScRT C.MECREDY Vce President Nvctear Ooerrst'or s September 5, 1996 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555  
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT~415-2083)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDlFULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOP,;-~SREQUIRED:
LTTR25ENCL25 4NDROCHESTERGASANDELECTRICCORPORATION
~89EASTAVfNUE,ROCHESTER,N.Y Id6d9000I 7AREACODE7165d62700 ROScRTC.MECREDYVcePresident NvctearOoerrst'or sSeptember 5,1996U.S.NuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
LER96-011,ImproperConfiguration ofCircuitBreaker,DuetoUndetected InternalInterference, ResultsinAutomatic StartofBothAuxiliary Feedwater PumpsR.E.GinnaNuclearPowerPlantDocketNo.50-244
LER 96-011, Improper Configuration of Circuit Breaker, Due to Undetected Internal Interference, Results in Automatic Start of Both Auxiliary Feedwater Pumps R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Vissing:==
==Dear Mr.Vissing:==
Inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorcondition thatresultedinamanualorautomatic actuation ofanyengineered safetyfeature(ESF),including thereactorprotection system(RPS)",theattachedLicenseeEventReportLER96-011isherebysubmitted.
In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(iv), which requires a report of,"Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)", the attached Licensee Event Report LER 96-011 is hereby submitted.
Th!seventhasinnowayaffectedthepublic'shealthandsafety.Verytrulyyours,RobertC.Mecredyxc:Mr.GuyS.Vissing(MailStop14C7)PWRProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector c7609i30028 960905PDRaOOCK0500044SPDR NRCFORM366(4-95)U.S.NUCLEARREGULATORY COMMISSIO LICENSEEEVENTREPORT(LER)(Seereverseforrequirednumberofdigits/characters fcreachblock)APPROVEDBYOMBNO.3160%104EXPIRES04/30/98ESTIMATED BURDENPERRESPONSEToCOMPLYWITHTHISMANDATORY INFORMATION COLLECTION REQUEST:50.0HRS.REPORTEDLESSONSLEARNEDAREINCORPORATED INTOTHELICENSING PROCESSANDFEDBACKToINDUSTRY.
Th!s event has in no way affected the public's health and safety.Very truly yours, Robert C.Mecredy xc: Mr.Guy S.Vissing (Mail Stop 14C7)PWR Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector c7609i30028 960905 PDR aOOCK 05000 44 S PDR NRC FORM 366 (4-95)U.S.NUCLEAR REGULATORY COMMISSIO LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters fcr each block)APPROVED BY OMB NO.3160%104 EXPIRES 04/30/98 ESTIMATED BURDEN PER RESPONSE To COMPLY WITH THIS MANDATORY INFORMATION COLLECTION REQUEST: 50.0 HRS.REPORTED LESSONS LEARNED ARE INCORPORATED INTO THE LICENSING PROCESS AND FED BACK To INDUSTRY.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE INFORMATION AND RECORDS MANAGEMENT BRANCH (T-6 F33), U.S.NUCI.EAR REGULATORY COMMISSION, WASHINGTON, DC 20555 cool, AND TO THE PAPERWORK REDUCTION PROJECT FACIUTY NAME II I R.E.Ginna Nuclear Power Plant DOCKET NUMBER I2)05000244 PAOE I3)1OF5 TITLE (4I Improper Configuration of Circuit Breaker, Due to Undetected Internal Interference, Results in Automatic Start of Both Auxiliary Feedwater Pumps EVENT DATE (6)LER NUMBER (6)REPORT DATE (7)OTHER FACILITIES INVOLVED (8)MONTH 08 DAY 07 YEAR 96 SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 MONTH OAY 09 05 96 FACIUTY NAME FACIUTY NAME DOCKET NUMBER DOCKET NUMBER OPERATING MODE (9)POWER LEVEL (10)000 20.2201(b) 20.2203(a)
FORWARDCOMMENTSREGARDING BURDENESTIMATEToTHEINFORMATION ANDRECORDSMANAGEMENT BRANCH(T-6F33),U.S.NUCI.EARREGULATORY COMMISSION, WASHINGTON, DC20555cool,ANDTOTHEPAPERWORK REDUCTION PROJECTFACIUTYNAMEIIIR.E.GinnaNuclearPowerPlantDOCKETNUMBERI2)05000244PAOEI3)1OF5TITLE(4IImproperConfiguration ofCircuitBreaker,DuetoUndetected InternalInterference, ResultsinAutomatic StartofBothAuxiliary Feedwater PumpsEVENTDATE(6)LERNUMBER(6)REPORTDATE(7)OTHERFACILITIES INVOLVED(8)MONTH08DAY07YEAR96SEQUENTIAL REVISIONNUMBERNUMBER96-011-00MONTHOAY090596FACIUTYNAMEFACIUTYNAMEDOCKETNUMBERDOCKETNUMBEROPERATING MODE(9)POWERLEVEL(10)00020.2201(b) 20.2203(a)
(1)20.2203(a)(2)(i) 20.2203(a)(2)(ii) 20.2203(a)(2)(iii)20.2203(a)
(1)20.2203(a)(2)(i) 20.2203(a)(2)(ii) 20.2203(a)(2)
(iii)20.2203(a)
(2)(iv)20.2203(a)
(2)(iv)20.2203(a)
(2)(v)20.2203(a)
(2)(v)20.2203(a)
(3)(i)20.2203(a)(3)
(3)(i)20.2203(a)(3)(ii)20.2203(a)
(ii)20.2203(a)
(4)50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i)50.73(a)(2)(ii)50.73(a)(2)(iii)X 50.73(a)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii)
(4)50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i)50.73(a)(2)
THIS REPORT IS SUBMITTED PUR SUANT TO THE REQUIREMENTS OF 10 CFR%: (Check one or more)(11)50.73(a)(2)(viii)50.73(a)(2)(x)73.71 OTHER Specify in Abstract below or m NRC Form 366A NAME LICENSEE CONTACT FOR THIS LER (12)ELEFHONE NUMBER ilncrvde Area Codel John T.St.Martin-Technical Assistant COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESC (716)771-3641 RIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT MANUFACTURER To NPRDS CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE To NPROS SUPPLEMENTAL REPORT EXPECTED (14)YES (If yes, complete EXPECTED SUBMISSION DATE).X NO EXPECTED SUBMISSION DATE (16)MONTH DAY YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)(16)On August 7, 1996, at approximately 2009 EDST, the plant was in IVlode 3 with the reactor coolant system being maintained at a temperature of 545 degrees F and a pressurizer pressure of 2235 PSIG.With no auxiliary feedwater pumps running and one main feedwater pump circuit breaker racked out in the"test" position,'n"AFW Bypass Switch" was moved from"Defeat" to"Normal".An undetected improper configuration of the circuit breaker created the logic that both main feedwater pump breakers were already open.This created the logic for autostart of both the"A" and"B" motor-driven auxiliary feedwater pumps.Immediate action was to stabilize auxiliary feedwater flow to both steam generators.
(ii)50.73(a)(2)(iii)X50.73(a)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii)
The underlying cause of the autostart was that the logic for autostart divas present due to an undetected internal interference within the circuit breaker between the racking arm and the actuating rod for the 52S auxiliary switch, which prevented this switch from opening to provide the circuit logic that the breaker was in the closed position.This event is NUREG-1022 Cause Code (A).Corrective action to prevent recurrence is outlined in Section V.B.NRC FORM 366 (4-95)
THISREPORTISSUBMITTED PURSUANTTOTHEREQUIREMENTS OF10CFR%:(Checkoneormore)(11)50.73(a)(2)(viii) 50.73(a)(2)
NRC FORM 366A (4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 PAGE (3)2 OF 5 TEXT iif more speceis required, use edditionef copies of NRC Form 366A j (17)PRE-EVENT PLANT CONDITIONS:
(x)73.71OTHERSpecifyinAbstractbelowormNRCForm366ANAMELICENSEECONTACTFORTHISLER(12)ELEFHONENUMBERilncrvdeAreaCodelJohnT.St.Martin-Technical Assistant COMPLETEONELINEFOREACHCOMPONENT FAILUREDESC(716)771-3641RIBEDINTHISREPORT(13)CAUSESYSTEMCOMPONENT MANUFACTURER ToNPRDSCAUSESYSTEMCOMPONENT MANUFACTURER REPORTABLE ToNPROSSUPPLEMENTAL REPORTEXPECTED(14)YES(Ifyes,completeEXPECTEDSUBMISSION DATE).XNOEXPECTEDSUBMISSION DATE(16)MONTHDAYYEARABSTRACT(Limitto1400spaces,i.e.,approximately 15single-spaced typewritten lines)(16)OnAugust7,1996,atapproximately 2009EDST,theplantwasinIVlode3withthereactorcoolantsystembeingmaintained atatemperature of545degreesFandapressurizer pressureof2235PSIG.Withnoauxiliary feedwater pumpsrunningandonemainfeedwater pumpcircuitbreakerrackedoutinthe"test"position,'n "AFWBypassSwitch"wasmovedfrom"Defeat"to"Normal".
On August 7, 1996, at approximately 2009 EDST, the plant was in Mode 3 as a result of a voluntary plant shutdown to upgrade motor-operated valves in the residual heat removal IRHR)system.Valve upgrades were completed and plant heatup and startup was in progress.The reactor coolant system IRCS)was being maintained at a temperature of approximately 545 degrees F and a pressurizer (PRZR)pressure of approximately 2235 PSIG.The circuit breaker for the"A" main feedwater IMFW)pump had jumpers installed and was closed in the"test" position, to comply with temporary administrative requirements.
Anundetected improperconfiguration ofthecircuitbreakercreatedthelogicthatbothmainfeedwater pumpbreakerswerealreadyopen.Thiscreatedthelogicforautostart ofboththe"A"and"B"motor-driven auxiliary feedwater pumps.Immediate actionwastostabilize auxiliary feedwater flowtobothsteamgenerators.
Auxiliary feedwater IAFW)pumps had just been secured as directed by these temporary administrative requirements, so there were no AFW pumps running.II.DESCRIPTION OF EVENT: A.DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:
Theunderlying causeoftheautostart wasthatthelogicforautostart divaspresentduetoanundetected internalinterference withinthecircuitbreakerbetweentherackingarmandtheactuating rodforthe52Sauxiliary switch,whichprevented thisswitchfromopeningtoprovidethecircuitlogicthatthebreakerwasintheclosedposition.
o August 7, 1996, 2009 EDST: Event date and time.o August 7, 1996, 2009 EDST: Discovery date and time.o August 7, 1996, 2024 EDST: One running AFW pump is secured.o August 7, 1996, 2135 EDST: All running AFW pumps are secured.EVENT: On August 7, 1996, at approximately 2009 EDST, the plant was in Mode 3.The RCS was being maintained at a temperature of approximately 545 degrees F and a PRZR pressure of approximately 2235 PSIG.As directed by Normal Operating Procedure 0-1.2,"Plant Startup From Hot Shutdown to Full Load", the Control Room operators moved an"AFW Bypass Switch" from the"Defeat" to the"Normal" position.Due to an undetected improper configuration of the circuit breaker for the"A" MFW pump, the 2 of 2 logic for both MFW pump breakers open was present, which caused an autostart of both the"A" and"B" AFW pumps.The Control Room operators observed the autostart of both the"A" and"B" AFW pumps, and controlled AFW flow to the desired flow rate for Mode 3 conditions.
ThiseventisNUREG-1022 CauseCode(A).Corrective actiontopreventrecurrence isoutlinedinSectionV.B.NRCFORM366(4-95)
One of the running AFW pumps was secured at approximately 2024 EDST.The Control Room operators requested that plant electricians investigate the problem.Electricians determined, when racking out the circuit breaker into the"test" position, the breaker positioning arm had travelled beyond its mechanical stop.This caused an undetected interference between the racking arm and the 52S auxiliary switch actuating rod, which prevented the 52S switch from opening to provide circuit logic that the breaker was in the closed position.The breaker was properly racked out, and electricians verified there was no interference and that the 52S switch had opened.NIIC FOAM 366A (4-95) tl NRC FORM 366A (4-95)LICENSEE EXTENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 PAGE (3)3 OF 5 TEXT (If more spece is required, use eddi donel copies of NRC Form 366AJ (17)C.INOPERABLE STRUCTURES, COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE EVENT: None D.OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None E.METHOD OF DISCOVERY:
NRCFORM366A(4-95)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKET05000244LERNUMBER(6)YEARSEQUENTIAL REVISIONNUMBERNUMBER96-011-00PAGE(3)2OF5TEXTiifmorespeceisrequired, useedditionef copiesofNRCForm366Aj(17)PRE-EVENT PLANTCONDITIONS:
This event was immediately apparent when both the"A" and"B" AFW pumps autostarted after the AFW Bypass Switch was placed in the"Normal".position.OPERATOR ACTION: After both the"A" and"B" AFW pumps autostarted, the Control Room operators took prompt actions to control AFW flow.They requested that the plant electricians determine the cause of the problem.The Control Room operators subsequently notified higher supervision and notified the NRC per 10CFR50.72 (b)(2)(ii), non-emergency four hour notification, at approximately 2226 EDST on August 7, 1996.G.SAFETY SYSTEM RESPONSES:
OnAugust7,1996,atapproximately 2009EDST,theplantwasinMode3asaresultofavoluntary plantshutdowntoupgrademotor-operated valvesintheresidualheatremovalIRHR)system.Valveupgradeswerecompleted andplantheatupandstartupwasinprogress.
Both the"A" and"B" AFW pumps autostarted as per design.CAUSE OF EVENT: A.IMMEDIATE CAUSE: The immediate cause of the autostart of both the"A" and"B" AFW pumps was the autostart logic, which was satisfied by 52S contacts providing circuit logic that both MFW pump breakers were open and an AFW Bypass Switch in"Normal".B.INTERMEDIATE CAUSE: The intermediate cause of autostart logic being satisfied was an undetected improper configuration of the"A"'MFW pump circuit breaker.NRC FORM 36:6 I's)
ThereactorcoolantsystemIRCS)wasbeingmaintained atatemperature ofapproximately 545degreesFandapressurizer (PRZR)pressureofapproximately 2235PSIG.Thecircuitbreakerforthe"A"mainfeedwater IMFW)pumphadjumpersinstalled andwasclosedinthe"test"position, tocomplywithtemporary administrative requirements.
NRC FORM 366A (4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)DOCKET LER NUMBER (6)PAGE (3)R.E.Ginna Nuclear Power Plant 05000244 YEAR SEQUENTIAL REVISION NUMBER NUMBER 4 OF 5 96-011-00 TEXT Iif more space is required, use additional copies of NRC Form 36@A/(17)C.ROOT CAUSE: The underlying cause of the improper configuration was an undetected internal interference within the"A" MFW pump circuit breaker.When the breaker was racked out to the test position, the breaker positioning arm travelled beyond its mechanical stop.This caused interference between the racking arm and the actuating rod for the 52S auxiliary contact switch.Therefore, while the breaker was physically closed in the"test" position, the auxiliary switch did not provide circuit logic that the breaker was in the closed position.This situation was created to be in compliance with the Ginna Station Improved Technical Specifications (ITS)Table 3.3.2-1 Function 6.f.To prevent an unnecessary actuation of both AFW pumps during Mode 2 conditions, a MFW pump breaker may be administratively closed in the test position, provided it is capable of being tripped on undervoltage and overcurrent conditions.
Auxiliary feedwater IAFW)pumpshadjustbeensecuredasdirectedbythesetemporary administrative requirements, sotherewerenoAFWpumpsrunning.II.DESCRIPTION OFEVENT:A.DATESANDAPPROXIMATE TIMESOFMAJOROCCURRENCES:
The administrative requirements were established to comply with ITS Table 3.3.2-1, which requires the autostart function of the motor-driven AFW pump upon opening of both MFW pump breakers during Modes 1 and 2.Prior to Amendment No.61 to the ITS, this function was only required in Mode 1 when the MFW pumps were actually in service.The addition of Mode 2 (when the MFW pumps may not be in service)was inadvertently added to the ITS by Amendment No.61.This event is NUREG-1022 Cause Code (A),"Personnel Error".This error was a cognitive error on the part of a plant electrician, who did not detect the interference between the racking arm and the actuating rod.This error was associated with activities that were covered by an approved procedure, and was not contrary to that procedure.
oAugust7,1996,2009EDST:Eventdateandtime.oAugust7,1996,2009EDST:Discovery dateandtime.oAugust7,1996,2024EDST:OnerunningAFWpumpissecured.oAugust7,1996,2135EDST:AllrunningAFWpumpsaresecured.EVENT:OnAugust7,1996,atapproximately 2009EDST,theplantwasinMode3.TheRCSwasbeingmaintained atatemperature ofapproximately 545degreesFandaPRZRpressureofapproximately 2235PSIG.AsdirectedbyNormalOperating Procedure 0-1.2,"PlantStartupFromHotShutdowntoFullLoad",theControlRoomoperators movedan"AFWBypassSwitch"fromthe"Defeat"tothe"Normal"position.
The procedural guidance was correct, but enhancements to the procedure have been identified.
Duetoanundetected improperconfiguration ofthecircuitbreakerforthe"A"MFWpump,the2of2logicforbothMFWpumpbreakersopenwaspresent,whichcausedanautostart ofboththe"A"and"B"AFWpumps.TheControlRoomoperators observedtheautostart ofboththe"A"and"B"AFWpumps,andcontrolled AFWflowtothedesiredflowrateforMode3conditions.
There were no unusual characteristics of the location of this breaker that contributed to this event.Note that this interference can only be created when racking the breaker out to the test position.The autostart of the AFW pump does not meet the NUMARC 93-01,"Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants", definition of a"Maintenance Preventable Functional Failure".IV.ANALYSIS OF EVENT: This event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(iv), which requires a report of,"Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)".The start of an AFW pump is an actuation nf an ESF.An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:
OneoftherunningAFWpumpswassecuredatapproximately 2024EDST.TheControlRoomoperators requested thatplantelectricians investigate theproblem.Electricians determined, whenrackingoutthecircuitbreakerintothe"test"position, thebreakerpositioning armhadtravelled beyonditsmechanical stop.Thiscausedanundetected interference betweentherackingarmandthe52Sauxiliary switchactuating rod,whichprevented the52Sswitchfromopeningtoprovidecircuitlogicthatthebreakerwasintheclosedposition.
There were no operational or safety consequences or implications attributed to the autostart of both the"A" and"B" AFW pumps because: o The autostart occurred with acceptable levels in both S/Gs.AFW flow was controlled to maintain these levels.NRC FOR)A 366A (4.95)
Thebreakerwasproperlyrackedout,andelectricians verifiedtherewasnointerference andthatthe52Sswitchhadopened.NIICFOAM366A(4-95) tl NRCFORM366A(4-95)LICENSEEEXTENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKET05000244LERNUMBER(6)YEARSEQUENTIAL REVISIONNUMBERNUMBER96-011-00PAGE(3)3OF5TEXT(Ifmorespeceisrequired, useeddidonelcopiesofNRCForm366AJ(17)C.INOPERABLE STRUCTURES, COMPONENTS, ORSYSTEMSTHATCONTRIBUTED TOTHEEVENT:NoneD.OTHERSYSTEMSORSECONDARY FUNCTIONS AFFECTED:
NRC FORM 366A (4-96)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 PAGE (3)5 OF 5 TEXT llf more spaceis required, use additional copies of NRC Form 366A/(17)o The limiting case for the supply of AFW is the Loss of Feedwater accident at 100'/o power.The plant condition at the time of this event was less than 5%power.Based on the above, it can be concluded that the public's health and safety was assured at all times.V.CORRECTIVE ACTION: A.ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS: AFW flow was controlled as desired to maintain S/G level.o The running AFW pumps were secured.B.ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:
NoneE.METHODOFDISCOVERY:
The ITS will be revised to eliminate the need for having a MFW pump breaker closed in the test position during Mode 2 conditions.
Thiseventwasimmediately apparentwhenboththe"A"and"B"AFWpumpsautostarted aftertheAFWBypassSwitchwasplacedinthe"Normal".
Procedure 0-2.1 will be enhanced to include specifically addressing that the 52S switch actuating rod is in the correct position when the breaker is racked out in the test position.Vi.ADDITIONAL INFORMATION:
position.
A.FAILED COMPONENTS:
OPERATORACTION:Afterboththe"A"and"B"AFWpumpsautostarted, theControlRoomoperators tookpromptactionstocontrolAFWflow.Theyrequested thattheplantelectricians determine thecauseoftheproblem.TheControlRoomoperators subsequently notifiedhighersupervision andnotifiedtheNRCper10CFR50.72 (b)(2)(ii),non-emergency fourhournotification, atapproximately 2226EDSTonAugust7,1996.G.SAFETYSYSTEMRESPONSES:
None B.PREVIOUS LERs ON SIMILAR EVENTS: A similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause could be identified.
Boththe"A"and"B"AFWpumpsautostarted asperdesign.CAUSEOFEVENT:A.IMMEDIATE CAUSE:Theimmediate causeoftheautostart ofboththe"A"and"B"AFWpumpswastheautostart logic,whichwassatisfied by52Scontactsproviding circuitlogicthatbothMFWpumpbreakerswereopenandanAFWBypassSwitchin"Normal".
However, LERs 96-004, 96-008, and 96-010 are similar events with different root causes.C.SPECIAL COMfvlENTS:
B.INTERMEDIATE CAUSE:Theintermediate causeofautostart logicbeingsatisfied wasanundetected improperconfiguration ofthe"A"'MFWpumpcircuitbreaker.NRCFORM36:6I's)
None NRC FORM 9"~A (4-95)}}
NRCFORM366A(4-95)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAME(1)DOCKETLERNUMBER(6)PAGE(3)R.E.GinnaNuclearPowerPlant05000244YEARSEQUENTIAL REVISIONNUMBERNUMBER4OF596-011-00TEXTIifmorespaceisrequired, useadditional copiesofNRCForm36@A/(17)C.ROOTCAUSE:Theunderlying causeoftheimproperconfiguration wasanundetected internalinterference withinthe"A"MFWpumpcircuitbreaker.Whenthebreakerwasrackedouttothetestposition, thebreakerpositioning armtravelled beyonditsmechanical stop.Thiscausedinterference betweentherackingarmandtheactuating rodforthe52Sauxiliary contactswitch.Therefore, whilethebreakerwasphysically closedinthe"test"position, theauxiliary switchdidnotprovidecircuitlogicthatthebreakerwasintheclosedposition.
Thissituation wascreatedtobeincompliance withtheGinnaStationImprovedTechnical Specifications (ITS)Table3.3.2-1Function6.f.Topreventanunnecessary actuation ofbothAFWpumpsduringMode2conditions, aMFWpumpbreakermaybeadministratively closedinthetestposition, provideditiscapableofbeingtrippedonundervoltage andovercurrent conditions.
Theadministrative requirements wereestablished tocomplywithITSTable3.3.2-1,whichrequirestheautostart functionofthemotor-driven AFWpumpuponopeningofbothMFWpumpbreakersduringModes1and2.PriortoAmendment No.61totheITS,thisfunctionwasonlyrequiredinMode1whentheMFWpumpswereactuallyinservice.TheadditionofMode2(whentheMFWpumpsmaynotbeinservice)wasinadvertently addedtotheITSbyAmendment No.61.ThiseventisNUREG-1022 CauseCode(A),"Personnel Error".Thiserrorwasacognitive erroronthepartofaplantelectrician, whodidnotdetecttheinterference betweentherackingarmandtheactuating rod.Thiserrorwasassociated withactivities thatwerecoveredbyanapprovedprocedure, andwasnotcontrarytothatprocedure.
Theprocedural guidancewascorrect,butenhancements totheprocedure havebeenidentified.
Therewerenounusualcharacteristics ofthelocationofthisbreakerthatcontributed tothisevent.Notethatthisinterference canonlybecreatedwhenrackingthebreakerouttothetestposition.
Theautostart oftheAFWpumpdoesnotmeettheNUMARC93-01,"Industry Guideline forMonitoring theEffectiveness ofMaintenance atNuclearPowerPlants",definition ofa"Maintenance Preventable Functional Failure".
IV.ANALYSISOFEVENT:Thiseventisreportable inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorcondition thatresultedinamanualorautomatic actuation ofanyengineered safetyfeature(ESF),including thereactorprotection system(RPS)".ThestartofanAFWpumpisanactuation nfanESF.Anassessment wasperformed considering boththesafetyconsequences andimplications ofthiseventwiththefollowing resultsandconclusions:
Therewerenooperational orsafetyconsequences orimplications attributed totheautostart ofboththe"A"and"B"AFWpumpsbecause:oTheautostart occurredwithacceptable levelsinbothS/Gs.AFWflowwascontrolled tomaintaintheselevels.NRCFOR)A366A(4.95)
NRCFORM366A(4-96)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKET05000244LERNUMBER(6)YEARSEQUENTIAL REVISIONNUMBERNUMBER96-011-00PAGE(3)5OF5TEXTllfmorespaceisrequired, useadditional copiesofNRCForm366A/(17)oThelimitingcaseforthesupplyofAFWistheLossofFeedwater accidentat100'/opower.Theplantcondition atthetimeofthiseventwaslessthan5%power.Basedontheabove,itcanbeconcluded thatthepublic'shealthandsafetywasassuredatalltimes.V.CORRECTIVE ACTION:A.ACTIONTAKENTORETURNAFFECTEDSYSTEMSTOPRE-EVENT NORMALSTATUS:AFWflowwascontrolled asdesiredtomaintainS/Glevel.oTherunningAFWpumpsweresecured.B.ACTIONTAKENORPLANNEDTOPREVENTRECURRENCE:
TheITSwillberevisedtoeliminate theneedforhavingaMFWpumpbreakerclosedinthetestpositionduringMode2conditions.
Procedure 0-2.1willbeenhancedtoincludespecifically addressing thatthe52Sswitchactuating rodisinthecorrectpositionwhenthebreakerisrackedoutinthetestposition.
Vi.ADDITIONAL INFORMATION:
A.FAILEDCOMPONENTS:
NoneB.PREVIOUSLERsONSIMILAREVENTS:AsimilarLEReventhistorical searchwasconducted withthefollowing results:Nodocumentation ofsimilarLEReventswiththesamerootcausecouldbeidentified.
However,LERs96-004,96-008,and96-010aresimilareventswithdifferent rootcauses.C.SPECIALCOMfvlENTS:
NoneNRCFORM9"~A(4-95)}}

Revision as of 13:49, 7 July 2018

LER 96-011-00:on 960807,improper Configuration of Circuit Breaker Occurred,Due to Undetected Internal Interference, Resulting in Automatic Start of Both Auxiliary Feedwater Pumps.Running AFW Pumps Were secured.W/960905 Ltr
ML17264A591
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/05/1996
From: MARTIN J T, MERCREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-96-011, LER-96-11, NUDOCS 9609130028
Download: ML17264A591 (8)


Text

('A'1 9'(90RY j REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)1 ACCESSION NBR:9609130028 DOC.DATE: 96/09/05 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MARTIN,J.T.

Rochester Gas&Electric Corp.MERCREDY,R.C.

Rochester Gas a Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSINGiG.S.

SUBJECT:

LER 96-011-00:on 960807,improper configuration of circuit breaker occurred.Due to undetected internal interference, resulting in automatic start of both auxiliary feedwater pumps.Running AFW pumps were secured.W/960905 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR

/ENCL (SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), incident Rpt, etc.NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: E./Mig/EQB FILE CENA~/5E/EELB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN1 FILE 01 COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.

AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DSIR/EIB COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR 1 1 1 1 1 1 LITCO BRYCE,J H.'vAC POORE,W.NUDOCS FULL TXT 2 2 1 1 1 1 N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT~415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COP,;-~S REQUIRED: LTTR 25 ENCL 25 4ND ROCHESTERGASANDELECTRICCORPORATION

~89EASTAVfNUE,ROCHESTER,N.Y Id6d9000I 7 AREA CODE7165d62700 ROScRT C.MECREDY Vce President Nvctear Ooerrst'or s September 5, 1996 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

LER 96-011, Improper Configuration of Circuit Breaker, Due to Undetected Internal Interference, Results in Automatic Start of Both Auxiliary Feedwater Pumps R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(iv), which requires a report of,"Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)", the attached Licensee Event Report LER 96-011 is hereby submitted.

Th!s event has in no way affected the public's health and safety.Very truly yours, Robert C.Mecredy xc: Mr.Guy S.Vissing (Mail Stop 14C7)PWR Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector c7609i30028 960905 PDR aOOCK 05000 44 S PDR NRC FORM 366 (4-95)U.S.NUCLEAR REGULATORY COMMISSIO LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters fcr each block)APPROVED BY OMB NO.3160%104 EXPIRES 04/30/98 ESTIMATED BURDEN PER RESPONSE To COMPLY WITH THIS MANDATORY INFORMATION COLLECTION REQUEST: 50.0 HRS.REPORTED LESSONS LEARNED ARE INCORPORATED INTO THE LICENSING PROCESS AND FED BACK To INDUSTRY.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE INFORMATION AND RECORDS MANAGEMENT BRANCH (T-6 F33), U.S.NUCI.EAR REGULATORY COMMISSION, WASHINGTON, DC 20555 cool, AND TO THE PAPERWORK REDUCTION PROJECT FACIUTY NAME II I R.E.Ginna Nuclear Power Plant DOCKET NUMBER I2)05000244 PAOE I3)1OF5 TITLE (4I Improper Configuration of Circuit Breaker, Due to Undetected Internal Interference, Results in Automatic Start of Both Auxiliary Feedwater Pumps EVENT DATE (6)LER NUMBER (6)REPORT DATE (7)OTHER FACILITIES INVOLVED (8)MONTH 08 DAY 07 YEAR 96 SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 MONTH OAY 09 05 96 FACIUTY NAME FACIUTY NAME DOCKET NUMBER DOCKET NUMBER OPERATING MODE (9)POWER LEVEL (10)000 20.2201(b) 20.2203(a)

(1)20.2203(a)(2)(i) 20.2203(a)(2)(ii) 20.2203(a)(2)(iii)20.2203(a)

(2)(iv)20.2203(a)

(2)(v)20.2203(a)

(3)(i)20.2203(a)(3)(ii)20.2203(a)

(4)50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i)50.73(a)(2)(ii)50.73(a)(2)(iii)X 50.73(a)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii)

THIS REPORT IS SUBMITTED PUR SUANT TO THE REQUIREMENTS OF 10 CFR%: (Check one or more)(11)50.73(a)(2)(viii)50.73(a)(2)(x)73.71 OTHER Specify in Abstract below or m NRC Form 366A NAME LICENSEE CONTACT FOR THIS LER (12)ELEFHONE NUMBER ilncrvde Area Codel John T.St.Martin-Technical Assistant COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESC (716)771-3641 RIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT MANUFACTURER To NPRDS CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE To NPROS SUPPLEMENTAL REPORT EXPECTED (14)YES (If yes, complete EXPECTED SUBMISSION DATE).X NO EXPECTED SUBMISSION DATE (16)MONTH DAY YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)(16)On August 7, 1996, at approximately 2009 EDST, the plant was in IVlode 3 with the reactor coolant system being maintained at a temperature of 545 degrees F and a pressurizer pressure of 2235 PSIG.With no auxiliary feedwater pumps running and one main feedwater pump circuit breaker racked out in the"test" position,'n"AFW Bypass Switch" was moved from"Defeat" to"Normal".An undetected improper configuration of the circuit breaker created the logic that both main feedwater pump breakers were already open.This created the logic for autostart of both the"A" and"B" motor-driven auxiliary feedwater pumps.Immediate action was to stabilize auxiliary feedwater flow to both steam generators.

The underlying cause of the autostart was that the logic for autostart divas present due to an undetected internal interference within the circuit breaker between the racking arm and the actuating rod for the 52S auxiliary switch, which prevented this switch from opening to provide the circuit logic that the breaker was in the closed position.This event is NUREG-1022 Cause Code (A).Corrective action to prevent recurrence is outlined in Section V.B.NRC FORM 366 (4-95)

NRC FORM 366A (4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 PAGE (3)2 OF 5 TEXT iif more speceis required, use edditionef copies of NRC Form 366A j (17)PRE-EVENT PLANT CONDITIONS:

On August 7, 1996, at approximately 2009 EDST, the plant was in Mode 3 as a result of a voluntary plant shutdown to upgrade motor-operated valves in the residual heat removal IRHR)system.Valve upgrades were completed and plant heatup and startup was in progress.The reactor coolant system IRCS)was being maintained at a temperature of approximately 545 degrees F and a pressurizer (PRZR)pressure of approximately 2235 PSIG.The circuit breaker for the"A" main feedwater IMFW)pump had jumpers installed and was closed in the"test" position, to comply with temporary administrative requirements.

Auxiliary feedwater IAFW)pumps had just been secured as directed by these temporary administrative requirements, so there were no AFW pumps running.II.DESCRIPTION OF EVENT: A.DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:

o August 7, 1996, 2009 EDST: Event date and time.o August 7, 1996, 2009 EDST: Discovery date and time.o August 7, 1996, 2024 EDST: One running AFW pump is secured.o August 7, 1996, 2135 EDST: All running AFW pumps are secured.EVENT: On August 7, 1996, at approximately 2009 EDST, the plant was in Mode 3.The RCS was being maintained at a temperature of approximately 545 degrees F and a PRZR pressure of approximately 2235 PSIG.As directed by Normal Operating Procedure 0-1.2,"Plant Startup From Hot Shutdown to Full Load", the Control Room operators moved an"AFW Bypass Switch" from the"Defeat" to the"Normal" position.Due to an undetected improper configuration of the circuit breaker for the"A" MFW pump, the 2 of 2 logic for both MFW pump breakers open was present, which caused an autostart of both the"A" and"B" AFW pumps.The Control Room operators observed the autostart of both the"A" and"B" AFW pumps, and controlled AFW flow to the desired flow rate for Mode 3 conditions.

One of the running AFW pumps was secured at approximately 2024 EDST.The Control Room operators requested that plant electricians investigate the problem.Electricians determined, when racking out the circuit breaker into the"test" position, the breaker positioning arm had travelled beyond its mechanical stop.This caused an undetected interference between the racking arm and the 52S auxiliary switch actuating rod, which prevented the 52S switch from opening to provide circuit logic that the breaker was in the closed position.The breaker was properly racked out, and electricians verified there was no interference and that the 52S switch had opened.NIIC FOAM 366A (4-95) tl NRC FORM 366A (4-95)LICENSEE EXTENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 PAGE (3)3 OF 5 TEXT (If more spece is required, use eddi donel copies of NRC Form 366AJ (17)C.INOPERABLE STRUCTURES, COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE EVENT: None D.OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None E.METHOD OF DISCOVERY:

This event was immediately apparent when both the"A" and"B" AFW pumps autostarted after the AFW Bypass Switch was placed in the"Normal".position.OPERATOR ACTION: After both the"A" and"B" AFW pumps autostarted, the Control Room operators took prompt actions to control AFW flow.They requested that the plant electricians determine the cause of the problem.The Control Room operators subsequently notified higher supervision and notified the NRC per 10CFR50.72 (b)(2)(ii), non-emergency four hour notification, at approximately 2226 EDST on August 7, 1996.G.SAFETY SYSTEM RESPONSES:

Both the"A" and"B" AFW pumps autostarted as per design.CAUSE OF EVENT: A.IMMEDIATE CAUSE: The immediate cause of the autostart of both the"A" and"B" AFW pumps was the autostart logic, which was satisfied by 52S contacts providing circuit logic that both MFW pump breakers were open and an AFW Bypass Switch in"Normal".B.INTERMEDIATE CAUSE: The intermediate cause of autostart logic being satisfied was an undetected improper configuration of the"A"'MFW pump circuit breaker.NRC FORM 36:6 I's)

NRC FORM 366A (4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)DOCKET LER NUMBER (6)PAGE (3)R.E.Ginna Nuclear Power Plant 05000244 YEAR SEQUENTIAL REVISION NUMBER NUMBER 4 OF 5 96-011-00 TEXT Iif more space is required, use additional copies of NRC Form 36@A/(17)C.ROOT CAUSE: The underlying cause of the improper configuration was an undetected internal interference within the"A" MFW pump circuit breaker.When the breaker was racked out to the test position, the breaker positioning arm travelled beyond its mechanical stop.This caused interference between the racking arm and the actuating rod for the 52S auxiliary contact switch.Therefore, while the breaker was physically closed in the"test" position, the auxiliary switch did not provide circuit logic that the breaker was in the closed position.This situation was created to be in compliance with the Ginna Station Improved Technical Specifications (ITS)Table 3.3.2-1 Function 6.f.To prevent an unnecessary actuation of both AFW pumps during Mode 2 conditions, a MFW pump breaker may be administratively closed in the test position, provided it is capable of being tripped on undervoltage and overcurrent conditions.

The administrative requirements were established to comply with ITS Table 3.3.2-1, which requires the autostart function of the motor-driven AFW pump upon opening of both MFW pump breakers during Modes 1 and 2.Prior to Amendment No.61 to the ITS, this function was only required in Mode 1 when the MFW pumps were actually in service.The addition of Mode 2 (when the MFW pumps may not be in service)was inadvertently added to the ITS by Amendment No.61.This event is NUREG-1022 Cause Code (A),"Personnel Error".This error was a cognitive error on the part of a plant electrician, who did not detect the interference between the racking arm and the actuating rod.This error was associated with activities that were covered by an approved procedure, and was not contrary to that procedure.

The procedural guidance was correct, but enhancements to the procedure have been identified.

There were no unusual characteristics of the location of this breaker that contributed to this event.Note that this interference can only be created when racking the breaker out to the test position.The autostart of the AFW pump does not meet the NUMARC 93-01,"Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants", definition of a"Maintenance Preventable Functional Failure".IV.ANALYSIS OF EVENT: This event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(iv), which requires a report of,"Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)".The start of an AFW pump is an actuation nf an ESF.An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:

There were no operational or safety consequences or implications attributed to the autostart of both the"A" and"B" AFW pumps because: o The autostart occurred with acceptable levels in both S/Gs.AFW flow was controlled to maintain these levels.NRC FOR)A 366A (4.95)

NRC FORM 366A (4-96)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 96-011-00 PAGE (3)5 OF 5 TEXT llf more spaceis required, use additional copies of NRC Form 366A/(17)o The limiting case for the supply of AFW is the Loss of Feedwater accident at 100'/o power.The plant condition at the time of this event was less than 5%power.Based on the above, it can be concluded that the public's health and safety was assured at all times.V.CORRECTIVE ACTION: A.ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS: AFW flow was controlled as desired to maintain S/G level.o The running AFW pumps were secured.B.ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:

The ITS will be revised to eliminate the need for having a MFW pump breaker closed in the test position during Mode 2 conditions.

Procedure 0-2.1 will be enhanced to include specifically addressing that the 52S switch actuating rod is in the correct position when the breaker is racked out in the test position.Vi.ADDITIONAL INFORMATION:

A.FAILED COMPONENTS:

None B.PREVIOUS LERs ON SIMILAR EVENTS: A similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause could be identified.

However, LERs96-004, 96-008, and 96-010 are similar events with different root causes.C.SPECIAL COMfvlENTS:

None NRC FORM 9"~A (4-95)