{{#Wiki_filter:ATTACHMENT 2toAEP:NRC:1137
{{#Wiki_filter:ATTACHMENT 2 to AEP:NRC:1137 PROPOSED, REVISED TECHNICAL SPECIFICATIONS PAGES FOR DONALD C.COOK NUCLEAR PLANT UNITS 1 AND 2~0~220ggy-p 05000~1<OR ADOC<~1021'QR 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS REACTOR CORE 2.1.1 The combination of THERMAL POWER, pressurizer pressure, and the highest operating loop coolant average temperature (T)shall not exceed avg the limits shown in Figure 2.1-1 for 4 loop operation.
: PROPOSED, REVISEDTECHNICAL SPECIFICATIONS PAGESFORDONALDC.COOKNUCLEARPLANTUNITS1AND2~0~220ggy-p05000~1<ORADOC<~1021'QR 2.0SAFETYLIMITSANDLIMITINGSAFETYSYSTEMSETTINGS2.1SAFETYLIMITSREACTORCORE2.1.1Thecombination ofTHERMALPOWER,pressurizer
: pressure, andthehighestoperating loopcoolantaveragetemperature (T)shallnotexceedavgthelimitsshowninFigure2.1-1for4loopoperation.
APPLICABILITY:
APPLICABILITY:
MODES1and2.ACTION:Wheneverthepointdefinedbythecombination ofthehighestoperating loopaveragetemperature andTHERMALPOWERhasexceededtheappropriate pressurizer pressureline,beinHOTSTANDBYwithin1hour.REACTORCOOLANTSYSTEMPRESSURE2.1.2TheReactorCoolantSystempressureshallnotexceed2735psig.APPLICABILITY:
MODES 1 and 2.ACTION: Whenever the point defined by the combination of the highest operating loop average temperature and THERMAL POWER has exceeded the appropriate pressurizer pressure line, be in HOT STANDBY within 1 hour.REACTOR COOLANT SYSTEM PRESSURE 2.1.2 The Reactor Coolant System pressure shall not exceed 2735 psig.APPLICABILITY:
MODES1,2,3,4and5.ACTION:MODES1and2WhenevertheReactorCoolantSystempressurehasexceeded2735psig,beinHOTSTANDBYwiththeReactorCoolantSystempressurewithinitslimitwithin1hour.MODES3,4and5WhenevertheReactorCoolantSystempressurehasexceeded2735psig,reducetheReactorCoolantSystempressuretowithinitslimitwithin5minutes.COOKNUCLEARPLANT-UNIT12-1AMENDMENT NO.jUP I*I<<p' 658ZOOPs)'aUNACCEPTABLE OPERATION648~100Psfa~000Ps1'a~618le~0Ps)'aACCEPTABLE OPERATION 578.2.4.5.6.7.8.1l.1.11.2POSERtfrect,ian ofnoe<cldl)PRESSURE(PSIA)8REAKPOINTS (FRACTION RATEDTHERMALPOWER,T-AVGINDEGREESF)18402000210022502400(0.0,622.1),(0.0,633.8),(0.0,640.8),(0.0,650.7),(0.0,660".1),(1.13,587.3),(1.20,(1.08,601.4),(12o,(1.06,609.8),(1.20,(1.02,621.9),(1.20,(0.98,633.7),(1.20,577.5)586.0).591.3)598.9)606.2)FIGURE2.1-1REACTORCORESAFETYLIMITSCOOKi%'CLEARPLANT-UNITI2-2AH~HDilENT NO.7g.7Nrsz If'>>'
MODES 1, 2, 3, 4 and 5.ACTION: MODES 1 and 2 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, be in HOT STANDBY with the Reactor Coolant System pressure within its limit within 1 hour.MODES 3, 4 and 5 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, reduce the Reactor Coolant System pressure to within its limit within 5 minutes.COOK NUCLEAR PLANT-UNIT 1 2-1 AMENDMENT NO.jUP I*I<<p' 658 ZOO Ps)'a UNACCEPTABLE OP ERAT ION 648~100 Ps fa~000 Ps 1'a~618 le~0 Ps)'a ACCEPTABLE OPERATION 578.2.4.5.6.7.8.1 l.1.1 1.2 POSER t frect,ian of noe<cldl)PRESSURE (PS IA)8REAKPOINTS (FRACTION RATED THERMAL POWER, T-AVG IN DEGREES F)1840 2000 2100 2250 2400 (0.0, 622.1), (0.0, 633.8), (0.0, 640.8), (0.0, 650.7), (0.0, 660".1), (1.13, 587.3), (1.20, (1.08, 601.4), (1 2o, (1.06, 609.8), (1.20, (1.02, 621.9), (1.20, (0.98, 633.7), (1.20, 577.5)586.0).591.3)598.9)606.2)FIGURE 2.1-1 REACTOR CORE SAFETY LIMITS COOK i%'CLEAR PLANT-UNIT I 2-2 AH~HDilENT NO.7g.7N rsz If'>>'
TABLE2.2-1Continued REACTORTRIPSYSTEMINSTRUMENTATION TRIPSETPOINTS FUNCTIONAL UNITTRIPSETPOINTALLOWABLE VALUES13.SteamGenerator WaterLevel-Low-LowGreaterthanorequalto17'%fnarrowrangeinstrument span-eachsteamgenerator Greaterthanorequalto16%ofnarrowrangeinstrument span-eachsteamgenerator 14.Steam/Feedwater FlowMismatchandLowSteamGenerator WaterLevelLessthan6orequalto0.71x10lb/hrofsteamflowatRATEDTHERMALPOWERcoincident withsteamgenerator waterlevelgreaterthanorequalto25'%fnarrowrangeinstrument span-eachsteamgenerator Lessthanorequalto0.73x10lbs/hrofsteamflowatRATEDTHERMALPOWERcoincident withsteamgenerator waterlevelgreaterthanorequalto24%ofnarrowrangeinstrument span-eachsteamgenerator 15.Undervoltage ReactorCoolantPumpsGreaterthanorequalto2750volts-eachbusGreaterthanorequalto2725volts-eachbus16.Underfrequency-ReactorCoolantPumpsGreaterthanorequalto57.5-Hz-eachbusGreaterthanorequalto57.4Hz-eachbus17.Turbine TripA.LowFluidOilPressureB.TurbineStopValveClosureGreaterthanorequalto800psigGreaterthanorequalto1%openGreaterthanorequalto750psigGreaterthanorequalto1%.open18.Safety Infection InputfromESFNotApplicable NotApplicable 19.Reactor CoolantPumpBreakerPositionTripNotApplicable NotApplicable COOKNUCLEARPLANT-UNIT12-6AMENDMENT NO.
TABLE 2.2-1 Continued REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 13.Steam Generator Water Level-Low-Low Greater than or equal to 17'%f narrow range instrument span-each steam generator Greater than or equal to 16%of narrow range instrument span-each steam generator 14.Steam/Feedwater Flow Mismatch and Low Steam Generator Water Level Less than6or equal to 0.71 x 10 lb/hr of steam flow at RATED THERMAL POWER coincident with steam generator water level greater than or equal to 25'%f narrow range instrument span-each steam generator Less than or equal to 0.73 x 10 lbs/hr of steam flow at RATED THERMAL POWER coincident with steam generator water level greater than or equal to 24%of narrow range instrument span-each steam generator 15.Undervoltage Reactor Coolant Pumps Greater than or equal to 2750 volts-each bus Greater than or equal to 2725 volts-each bus 16.Underfrequency-Reactor Coolant Pumps Greater than or equal to 57.5-Hz-each bus Greater than or equal to 57.4 Hz-each bus 17.Turbine Trip A.Low Fluid Oil Pressure B.Turbine Stop Valve Closure Greater than or equal to 800 psig Greater than or equal to 1%open Greater than or equal to 750 psig Greater than or equal to 1%.open 18.Safety Infection Input from ESF Not Applicable Not Applicable 19.Reactor Coolant Pump Breaker Position Trip Not Applicable Not Applicable COOK NUCLEAR PLANT-UNIT 1 2-6 AMENDMENT NO.
I5'I.I'VajfI]vi~
I 5'I.I'Va jf I]vi~
TABLE3.3-5Continued ENGINEERED SAFETYFEATURESRESPONSETIMESINITIATING SIGNALANDFUNCTIONRESPONSETIMEINSECONDS6.SteamFlowinTwoSteamLines-HihCoincident WithSteamLinePressure-Low a.SafetyIn]ection (ECCS)b.ReactorTrip(fromSI)c.Feedwater Isolation d.Containment Isolation-Phase "A"e.Containment PurgeandExhaustIsolation f.Auxiliary Feedwater Pumpsg.Essential ServiceWaterSystemh.SteamLineIsolation 7.Containment Pressure--Hi h-HihLessthanorequal13.0&#xb9;/23.0&#xb9;&#xb9; LessthanorequalLessthanorequalLessthanorequal18.0&#xb9;/28.0&#xb9;&#xb9; NotApplicable NotApplicable Lessthanorequal14.0&#xb9;/48.0&#xb9;&#xb9; Lessthanorequaltoto3.0to8'totoa.b.CeContainment SprayContainment Isolation-Phase "B"SteamLineIsolation Containment AirRecirculation FanrLessthanorequalto45.0NotApplicable Lessthanorequalto10.0Lessthanorequalto600.08.SteamGenerator WaterLevel--Hi h-Hiha.TurbineTripb.Feedwater Isolation Lessthanorequalto2.5Lessthanorequalto11.09.SteamGenerator WaterLevel--Low-Low a.MotorDrivenAuxiliary Feedwater Pumpsb.TurbineDrivenAuxiliary Feedwater PumpsLessthanorequalto60.0Lessthanorequalto60.010.4160voltEmerencBusLossofVoltaea.MotorDrivenAuxiliary Feedwater PumpsLessthanorequalto60.011.LossofMainFeedwater Pumsa.MotorDrivenAuxiliary Feedwater PumpsLessthanorequalto60.012:ReactorCoolantPumBusUndervolta ea.TurbineDrivenAuxiliary Feedwater PumpsLessthanorequalto60.0COOKNUCLEARPLANT-UNIT13/43-29AMENDMENT NO.APil/Hile
TABLE 3.3-5 Continued ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 6.Steam Flow in Two Steam Lines-Hi h Coincident With Steam Line Pressure-Low a.Safety In]ection (ECCS)b.Reactor Trip (from SI)c.Feedwater Isolation d.Containment Isolation-Phase"A" e.Containment Purge and Exhaust Isolation f.Auxiliary Feedwater Pumps g.Essential Service Water System h.Steam Line Isolation 7.Containment Pressure--Hi h-Hi h Less than or equal 13.0&#xb9;/23.0&#xb9;&#xb9; Less than or equal Less than or equal Less than or equal 18.0&#xb9;/28.0&#xb9;&#xb9; Not Applicable Not Applicable Less than or equal 14.0&#xb9;/48.0&#xb9;&#xb9; Less than or equal to to 3.0 to 8'to to a.b.Ce Containment Spray Containment Isolation-Phase"B" Steam Line Isolation Containment Air Recirculation Fan r Less than or equal to 45.0 Not Applicable Less than or equal to 10.0 Less than or equal to 600.0 8.Steam Generator Water Level--Hi h-Hi h a.Turbine Trip b.Feedwater Isolation Less than or equal to 2.5 Less than or equal to 11.0 9.Steam Generator Water Level--Low-Low a.Motor Driven Auxiliary Feedwater Pumps b.Turbine Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 Less than or equal to 60.0 10.4160 volt Emer enc Bus Loss of Volta e a.Motor Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 11.Loss of Main Feedwater Pum s a.Motor Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 12: Reactor Coolant Pum Bus Undervolta e a.Turbine Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 COOK NUCLEAR PLANT-UNIT 1 3/4 3-29 AMENDMENT NO.APi l/Hi le


TABLE4.3-2Continued ENGINEERED SAFETYFEATUREDACTUATION SYSTEMINSTRUMENTATION SURVEILLANCE REUIREMENTS FUNCTIONAL UNITCHANNELCHANNELCHANNELFUNCTIONAL CHECKCALIBRATION TESTMODEINWHICHSURVEILLANCE 4.STEAMLINEISOLATION a.Manualb.Automatic Actuation Logicc.Containment Press-ure--High-High d.SteamFlowinTwoSteamLines--HighCoincident withTavg--Low-Low N.A.N.A.N.A."N.A.M(1)M(2)M(3)1,2,31,2,31,2,31,2,3e.SteamLinePressure--Low S1,2,35.TURBINE TRIPANDFEEDWATER ISOLATION a.SteamGenerator WaterLevel--High-High6.MOTORDRIVENAUXILIARY FEEDWATER PUMPS1,2,3a.SteamGenerator WaterLevel--Low-Low1,2,3b.4kvBusLossofVoltagec.SafetyInjection d.LossofMainFeedPumpsN.A.N.A.N.ADN.A.M(2)1,2,31,2,31,2COOKNUCLEARPLANT-UNIT13/43-33AMENDMENT NO.APE,Z/PN2 TABLE3.3-6(Continued)
TABLE 4.3-2 Continued ENGINEERED SAFETY FEATURED ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE UIREMENTS FUNCTIONAL UNIT CHANNEL CHANNEL CHANNEL FUNCTIONAL CHECK CALIBRATION TEST MODE IN WHICH SURVEILLANCE 4.STEAM LINE ISOLATION a.Manual b.Automatic Actuation Logic c.Containment Press-ure--High-High d.Steam Flow in Two Steam Lines--High Coincident with Tavg--Low-Low N.A.N.A.N.A." N.A.M(1)M(2)M(3)1,2,3 1,2,3 1,2,3 1,2,3 e.Steam Line Pressure--Low S 1,2,3 5.TURBINE TRIP AND FEEDWATER ISOLATION a.Steam Generator Water Level--High-High 6.MOTOR DRIVEN AUXILIARY FEEDWATER PUMPS 1,2,3 a.Steam Generator Water Level--Low-Low 1,2,3 b.4 kv Bus Loss of Voltage c.Safety Injection d.Loss of Main Feed Pumps N.A.N.A.N.AD N.A.M(2)1,2,3 1,2,3 1,2 COOK NUCLEAR PLANT-UNIT 1 3/4 3-33 AMENDMENT NO.APE, Z/P N2 TABLE 3.3-6 (Continued)
TABLENOTATIONACTION20-WiththenumberofchannelsOPERABLElessthanrequiredbytheMinimumChannelsOperablerequirement, complywiththeACTIONrequirements ofSpecification 3.4.6.1.ACTION21-WiththenumberofchannelsOPERABLElessthanrequiredbytheMinimumChannelsOperablerequirement, performareasurveysofthemonitored areawithportablemonitoring instrumentation atleastonceperday.ACTION22-WiththenumberofchannelsOPERABLElessthanrequiredbytheMinimumChannelsOperablerequirements, complywiththeACTIONrequirements ofSpecification 3.9.9.ThisACTIONisnotrequiredduringtheperformance ofcontainment integrated leakratetest.ACTION22A-WiththenumberofOPERABLEChannelslessthanrequiredbytheMinimumChannelsOPERABLErequirements:
TABLE NOTATION ACTION 20-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, comply with the ACTION requirements of Specification 3.4.6.1.ACTION 21-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per day.ACTION 22-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirements, comply with the ACTION requirements of Specification 3.9.9.This ACTION is not required during the performance of containment integrated leak rate test.ACTION 22A-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements:
1.eitherrestoretheinoperable Channel(s) toOPERABLEstatuswithin7daysoftheevent,or2.prepareandsubmitaSpecialReporttotheCommission pursuanttoSpecification 6.9.2within14daysfollowing theeventoutlining theactiontaken,thecauseoftheinoperability andtheplansandscheduleforrestoring thesystemtoOPERABLEstatus.3.Technical Specification Sections3.0.3and3.0.4NotApplicable.
1.either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable.
ACTION22B-WiththenumberofOPERABLEChannelslessthanrequiredbytheMinimumChannelsOPERABLErequirements'.
ACTION 22B-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements'.
eitherrestoretheinoperable Channel(s) toOPERABLEstatuswithin7daysoftheevent,or2.prepareandsubmitaSpecialReporttotheCommission pursuanttoSpecification 6.9'within14daysfollowing theeventoutlining theactiontaken,thecauseoftheinoperability andtheplansandscheduleforrestoring thesystemtoOPERABLEstatus.3.Intheeventofanaccidentinvolving radiological releasesinitiatethepreplanned alternate methodofmonitoring theappropriate parameter(s) within72hours.4.Technical Specification Sections3.0.3and3.0.4NotApplicable.
either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9'within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.In the event of an accident involving radiological releases initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours.4.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable.
WCOOKNUCLEARPLANT-UNIT13/43-37AMENDMENT NO.W TABLE3.3-10Unit1andCommonAreaFireDetection SstemsDetectorSstemLocationTotalNumberofDetectors Auxiliary Building')Elevation 573b)Elevation'87 c)Elevation 609d)Elevation 633e)Elevation 650f)NewFuelSTGEAreag)RPAccessControl&ChemLabsUlEastMainSteamValveEnclosure UlMainSteamLineAreaEl.612(AroundContainment)
W COOK NUCLEAR PLANT-UNIT 1 3/4 3-37 AMENDMENT NO.W TABLE 3.3-10 Unit 1 and Common Area Fire Detection S stems Detector S stem Location Total Number of Detectors Auxiliary Building')Elevation 573 b)Elevation'87 c)Elevation 609 d)Elevation 633 e)Elevation 650 f)New Fuel STGE Area g)RP Access Control&Chem Labs Ul East Main Steam Valve Enclosure Ul Main Steam Line Area El.612 (Around Containment)
UlNESWValveAreaEl.612Heat(x/y)+Flame(x/y)"Smoke(x/y)"23/OC'5/OC 41/OC41/OC34/OC4/OC25/028/Om13/Oi'm2/0Ul4KVSwitchgear (AB)Ul4KVSwitchgear (CD)UlEngr.SafetySystemSwitchgear
Ul NESW Valve Area El.612 Heat (x/y)+Flame (x/y)" Smoke (x/y)" 23/OC'5/OC 41/OC 41/OC 34/OC 4/OC 25/0 28/Om 13/Oi'm 2/0 Ul 4KV Switchgear (AB)Ul 4KV Switchgear (CD)Ul Engr.Safety System Switchgear
&XFMR.Rm.UlCRD,XFMR.&Switchgear Rm,Inverter&Bttry.Rms.UlPressurizer HeaterXFMR.Rm.UlDieselFuelOilTransferPumpRm.UlDieselGenerator Rm.1ABUlDieselGenerator Rm.1CDUlDieselGenerator RampCorr.Ul&2AFWPVestibule 0/10/20/20/30/30/50/50/20/20/90/812/04/02/OCUlControlRoomUlSwitchgear CableVaultUlControlRoomCableVaultUlAux.CableVaultU162ESWBasementAreaUlESWPump&MCCRms.45/00/10~0/130/65''nw'ov0/64/OC9/0CSystemprotectsareacommontobothUnits1and2>'<(x/y)xisnumberofFunctionA(earlywarningfiredetection andnotification only)instruments.
&XFMR.Rm.Ul CRD, XFMR.&Switchgear Rm, Inverter&Bttry.Rms.Ul Pressurizer Heater XFMR.Rm.Ul Diesel Fuel Oil Transfer Pump Rm.Ul Diesel Generator Rm.1AB Ul Diesel Generator Rm.1CD Ul Diesel Generator Ramp Corr.Ul&2 AFWP Vestibule 0/1 0/2 0/2 0/3 0/3 0/5 0/5 0/2 0/2 0/9 0/8 12/0 4/0 2/OC Ul Control Room Ul Switchgear Cable Vault Ul Control Room Cable Vault Ul Aux.Cable Vault U162 ESW Basement Area Ul ESW Pump&MCC Rms.45/0 0/10~0/13 0/6 5''nw'ov 0/6 4/OC 9/0 C System protects area common to both Units 1 and 2>'<(x/y)x is number of Function A (early warning fire detection and notification only)instruments.
yisnumberofFunctionB(actuation offiresuppression systemsandearlywarningandnotification) instruments'ircuit containsbothsmokeandflamedetectors twocircuitsoffivedetectors eachtwocircuitsof32and33detectors eachCOOKNUCLEARPLANT-UNIT13/43-53AMENDMENT NO.79'8P  
y is number of Function B (actuation of fire suppression systems and early warning and notification) instruments'ircuit contains both smoke and flame detectors two circuits of five detectors each two circuits of 32 and 33 detectors each COOK NUCLEAR PLANT-UNIT 1 3/4 3-53 AMENDMENT NO.79'8P  
)h'44crqi1~4%4 TABLE3.3-11POST-ACCIDENT MONITORING INTRUMENTATION INSTRUMENT MINIMUMCHANNELSOPERABLE1~Containment Pressure2.ReactorCoolantOutletTemperature-(ideRange)3.ReactorCoolantInletTemperature-T(WideRange)4.ReactorCoolantPressure-Vide Range5.Pressurizer WaterLevel6.SteamLinePressure7.SteamGenerator WaterLevel-Narrow Range8~Refueling WaterStorageTankWaterLevel9.BoricAcidTankSolutionLevel10.Auxiliary Feedwater FlowRate11.Reactor CoolantSystemSubcooling MarginMonitor12.PORVPositionIndicator
)h'4 4crq i1~4%4 TABLE 3.3-11 POST-ACCIDENT MONITORING INTRUMENTATION INSTRUMENT MINIMUM CHANNELS OPERABLE 1~Containment Pressure 2.Reactor Coolant Outlet Temperature-(ide Range)3.Reactor Coolant Inlet Temperature-T (Wide Range)4.Reactor Coolant Pressure-Vide Range 5.Pressurizer Water Level 6.Steam Line Pressure 7.Steam Generator Water Level-Narrow Range 8~Refueling Water Storage Tank Water Level 9.Boric Acid Tank Solution Level 10.Auxiliary Feedwater Flow Rate 11.Reactor Coolant System Subcooling Margin Monitor 12.PORV Position Indicator--Limit Switches~13.PORV Block Valve Position Indicator--Limit Switches 14.Safety Valve Position Indicator--Acoustic Monitor 15~Incore Thermocouples (Core Exit Thermocouples) 16.Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication) 17.Containment Sump Le~el 18.Containment Water Level 2 2 2 2/steam generator 1/steam generator 2 1 1/steam generator~
--LimitSwitches~
].%%1/Valve 1/Valve 1/Valve 2/Core Quadrant One Train (~annels/Train) 2>'<Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument.
13.PORVBlockValvePositionIndicator
>'<~'<PPC subcooling margin readout can be used as a substitute for the subcooling monitor instrument.
--LimitSwitches14.Safety ValvePositionIndicator
<~'~'<Acoustic monitoring of PORV position (1 channel per three valves-headered discharge) can be used as a substitute for the PORV Position Indicator-Limit Switches instruments.
--AcousticMonitor15~IncoreThermocouples (CoreExitThermocouples) 16.Reactor CoolantInventory TrackingSystem(ReactorVesselLevelIndication) 17.Containment SumpLe~el18.Containment WaterLevel2222/steamgenerator 1/steamgenerator 211/steamgenerator~
~'~~The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational.
].%%1/Valve1/Valve1/Valve2/CoreQuadrantOneTrain(~annels/Train) 2>'<SteamGenerator WaterLevelChannelscanbeusedasasubstitute forthecorresponding auxiliary feedwater flowratechannelinstrument.
The schedule for modification or replacement of the transmitters is described in the Bases.COOK NUCLEAR PLANT-UNIT 1 3/4 3-55 AMENDMENT NO.ggg I E tl, V)1~rlII ITt REACTOR COOLANT SYSTEM LIMITING CONDITION.
>'<~'<PPCsubcooling marginreadoutcanbeusedasasubstitute forthesubcooling monitorinstrument.
FOR OPERATION (Continued) 2.With two or more block valves inoperable, within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions of ACTION a.2 or a.3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriately c.With PORVs and block valves not in the same line inoperable,~
<~'~'<Acousticmonitoring ofPORVposition(1channelperthreevalves-headereddischarge) canbeusedasasubstitute forthePORVPositionIndicator-LimitSwitchesinstruments.
within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve-in each line.Apply the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable.
~'~~Therequirements fortheseinstruments willbecomeeffective aftertheleveltransmitters aremodifiedorreplacedandbecomeoperational.
d.The provisions of Specification 3.0.4 are not applicable.
Thescheduleformodification orreplacement ofthetransmitters isdescribed intheBases.COOKNUCLEARPLANT-UNIT13/43-55AMENDMENT NO.ggg IEtl,V)1~rlIIITt REACTORCOOLANTSYSTEMLIMITINGCONDITION.
SURVEILLANCE RE UIREMENTS 4.4.11.1 Each of the three PORVs shall be demonstrated OPERABLE: At least once per 31 days by performance of CHANNEL FUNCTIONAL TEST, excluding valve operation, and At least once per 18 months by performance of a CHANNEL CALIBRATION.
FOROPERATION (Continued) 2.Withtwoormoreblockvalvesinoperable, within1houreither(1)restoreatotalofatleasttwoblockvalvestoOPERABLEstatus,or(2)closetheblockvalvesandremovepowerfromtheblockvalves,or(3)closetheassociated PORVsandremovepowerfromtheirassociated solenoidvalves;andapplytheportionsofACTIONa.2ora.3aboveforinoperable PORVs,relatingtoOPERATIONAL MODE,asappropriately c.WithPORVsandblockvalvesnotinthesamelineinoperable,~
4.4.11.2 Each of the three block valves shall be demonstrated OPERABLE at least once per 92 days'y operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested when ACTION 3.4.11.a or 3.4.11'is applied.4.4.11.3 The emergency power supply for the PORVs and block valves shall be demonstrated OPERABLE at least once per 18 months.by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite plant batteries.
within1houreither(1)restorethevalvestoOPERABLEstatusor(2)closeandde-energize theothervalve-ineachline.ApplytheportionsofACTIONa.2ora.3above,relatingtoOPERATIONAL MODE,asappropriate fortwoorthreelinesunavailable.
This testing can be performed in conjunction with the requirements of Specifications 4.8.2.3.2.d and 4.8.1.1.2.e.
d.Theprovisions ofSpecification 3.0.4arenotapplicable.
PORVs isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.
SURVEILLANCE REUIREMENTS 4.4.11.1EachofthethreePORVsshallbedemonstrated OPERABLE:
COOK NUCLEAR PLANT-UNIT 1 3/4 4-36 AMENDMENT NO.NH, X2'8, CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment ai'r lock shall be OPERABLE with: a.Both doors.closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.An overall air lock leakage rate of less than or equal to 0.05 L a at P , 12 psig~a'PPLICABILITY:
Atleastonceper31daysbyperformance ofCHANNELFUNCTIONAL TEST,excluding valveoperation, andAtleastonceper18monthsbyperformance ofaCHANNELCALIBRATION.
MODES 1, 2, 3 and 4.ACTION: With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.6.1~3 Each containment air lock shall be demonstrated OPERABLE: a~By visual inspection after each opening to verify that the seal has not been damaged.*Within 72 hours following each closing, perform an air leakage test without a simulated pressure force on the door by pressurizing the gap between the seals to 12 psig and verifying a seal leakage of no greater than 0.5 L~'<Exemption to Appendix"J" of,10 CFR 50, COOK NUCLEAR PLANT-UNIT 1 3/4 6-4 CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS Continued C.d.At least once per 6 months, perform an air leakage test without a simulated pressure force on the door per 4.6'.3.b., then perform an air leakage test with a simulated pressure force on the door, by pressurizing the volume between the seals to 12 psig and verifying a seal leakage of no greater than 0.0005 L.a't least once per 6 months by conducting an overall air lock leakage test at P (12 psig)and by verifying that the overall air lock leakage rate is within its limits a e.At least once per 6 months by verifying that only one door in each air lock can be opened at a time.COOK NUCLEAR PLANT-UNIT 1 3/4 6-5 AMENDMENT NO.  
4.4.11.2Eachofthethreeblockvalvesshallbedemonstrated OPERABLEatleastonceper92days'yoperating thevalvethroughonecompletecycleoffulltravel.Theblockvalve(s)donothavetobetestedwhenACTION3.4.11.aor3.4.11'isapplied.4.4.11.3Theemergency powersupplyforthePORVsandblockvalvesshallbedemonstrated OPERABLEatleastonceper18months.byoperating thevalvesthroughacompletecycleoffulltravelwhiletheemergency busesareenergized bytheonsitedieselgenerators andonsiteplantbatteries.
<m.*4 f">4'$t CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued) 4.6.3.1.2 Each isolation valve specified in Table 3.6-1 shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by: a~Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.L b.Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.c.Verifying that on'a Containment Purge and Exhaust isolation signal, each Purge and Exhaust valve actuates to its isolation position.4.6.3.1.3 The isolation time of each power operated or automatic valve of Table 3.6-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 1 3/4 6-15 AMENDMENT NO.gP7, C'
Thistestingcanbeperformed inconjunction withtherequirements ofSpecifications 4.8.2.3.2.d and4.8.1.1.2.e.
TABLE 3.6-1 Continued VALVE NUMBER FUNCTION ISOLATION TIME IN SECONDS CONTAINMENT PURGE EXHAUST~Continued 12.VCR-205 13.VCR-206 14.VCR-207%'PPER COMP.PURGE AIR INLET UPPER COMP.PURGE AIR OUTLET CONT.PRESS RELIEF FAN ISOLATION MANUAL ISOLATION VALVES 1.ICM-111 2.ICM-129 3.ICM-250 4.ICM-251 5.ICM-260 6.ICM-265 7.ICM-305 8.ICM-306 9.ICM-311 10.ICM-321 11.NPX 151 VI 12.PA 343 13.SF-151 14.SF-153 15.SF-159 16.SF-160 17.SI-171 18.SI-172 RHR TO RC COLD LEGS RHR INLET TO PUMPS BORON INJECTION OUTLET BORON INJECTION OUTLET SAFETY INJECTION OUTLET SAFETY INJECTION OUTLET RHR/CTS SUCTION FROM SUMP RHR/CTS SUCTION FROM SUMP RHR TO RC HOT LEGS RHR TO RC HOT LEGS DEAD WEIGHT TESTER CONTAINMENT SERVICE AIR REFUELING WATER SUPPLY REFUELING WATER SUPPLY REFUELING CAVITY DRAIN TO PURIFICATION SYSTEM REFUELING CAVITY DRAIN TO PURIFICATION SYSTEM SAFETY INJECTION TEST LINE ACCUMULATOR TEST LINE NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA COOK NUCLEAR PLANT UNIT 1 3/4 6-21 AMENDMENT NO.
PORVsisolatedtolimitRCSleakagethroughtheirseatsandtheblockvalvesshuttoisolatethisleakagearenotconsidered inoperable.
1?*>t (7" 3>1q,!I'\Ih PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 a.At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with: 1.Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency busses, and 2.One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.b.At least one auxiliary feedwater flowpath in support of Unit 2 shutdown functions shall be available.
COOKNUCLEARPLANT-UNIT13/44-36AMENDMENT NO.NH,X2'8, CONTAINMENT SYSTEMSCONTAINMENT AIRLOCKSLIMITINGCONDITION FOROPERATION 3.6.1.3Eachcontainment ai'rlockshallbeOPERABLEwith:a.Bothdoors.closedexceptwhentheairlockisbeingusedfornormaltransitentryandexitthroughthecontainment, thenatleastoneairlockdoorshallbeclosed,andb.Anoverallairlockleakagerateoflessthanorequalto0.05LaatP,12psig~a'PPLICABILITY:
MODES1,2,3and4.ACTION:Withanairlockinoperable, restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.SURVEILLANCE REUIREMENTS 4.6.1~3Eachcontainment airlockshallbedemonstrated OPERABLE:
a~Byvisualinspection aftereachopeningtoverifythatthesealhasnotbeendamaged.*Within72hoursfollowing eachclosing,performanairleakagetestwithoutasimulated pressureforceonthedoorbypressurizing thegapbetweenthesealsto12psigandverifying asealleakageofnogreaterthan0.5L~'<Exemption toAppendix"J"of,10CFR50,COOKNUCLEARPLANT-UNIT13/46-4 CONTAINMENT SYSTEMSSURVEILLANCE REUIREMENTS Continued C.d.Atleastonceper6months,performanairleakagetestwithoutasimulated pressureforceonthedoorper4.6'.3.b.,thenperformanairleakagetestwithasimulated pressureforceonthedoor,bypressurizing thevolumebetweenthesealsto12psigandverifying asealleakageofnogreaterthan0.0005L.a'tleastonceper6monthsbyconducting anoverallairlockleakagetestatP(12psig)andbyverifying thattheoverallairlockleakagerateiswithinitslimitsae.Atleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.COOKNUCLEARPLANT-UNIT13/46-5AMENDMENT NO.  
<m.*4f">4'$t CONTAINMENT SYSTEMSSURVEILLANCE REUIREMENTS (Continued) 4.6.3.1.2 Eachisolation valvespecified inTable3.6-1shallbedemonstrated OPERABLEduringtheCOLDSHUTDOWNorREFUELING MODEatleastonceper18monthsby:a~Verifying thatonaPhaseAcontainment isolation testsignal,eachPhaseAisolation valveactuatestoitsisolation position.
Lb.Verifying thatonaPhaseBcontainment isolation testsignal,eachPhaseBisolation valveactuatestoitsisolation position.
c.Verifying thaton'aContainment PurgeandExhaustisolation signal,eachPurgeandExhaustvalveactuatestoitsisolation position.
4.6.3.1.3 Theisolation timeofeachpoweroperatedorautomatic valveofTable3.6-1shallbedetermined tobewithinitslimitwhentestedpursuanttoSpecification 4.0.5.COOKNUCLEARPLANT-UNIT13/46-15AMENDMENT NO.gP7, C'
TABLE3.6-1Continued VALVENUMBERFUNCTIONISOLATION TIMEINSECONDSCONTAINMENT PURGEEXHAUST~Continued 12.VCR-20513.VCR-20614.VCR-207%'PPER COMP.PURGEAIRINLETUPPERCOMP.PURGEAIROUTLETCONT.PRESSRELIEFFANISOLATION MANUALISOLATION VALVES1.ICM-1112.ICM-1293.ICM-2504.ICM-2515.ICM-2606.ICM-2657.ICM-3058.ICM-3069.ICM-31110.ICM-32111.NPX151VI12.PA34313.SF-15114.SF-15315.SF-15916.SF-16017.SI-17118.SI-172RHRTORCCOLDLEGSRHRINLETTOPUMPSBORONINJECTION OUTLETBORONINJECTION OUTLETSAFETYINJECTION OUTLETSAFETYINJECTION OUTLETRHR/CTSSUCTIONFROMSUMPRHR/CTSSUCTIONFROMSUMPRHRTORCHOTLEGSRHRTORCHOTLEGSDEADWEIGHTTESTERCONTAINMENT SERVICEAIRREFUELING WATERSUPPLYREFUELING WATERSUPPLYREFUELING CAVITYDRAINTOPURIFICATION SYSTEMREFUELING CAVITYDRAINTOPURIFICATION SYSTEMSAFETYINJECTION TESTLINEACCUMULATOR TESTLINENANANANANANANANANANANANANANANANANANACOOKNUCLEARPLANTUNIT13/46-21AMENDMENT NO.
1?*>t(7"3>1q,!I'\Ih PLANTSYSTEMSAUXILIARY FEEDWATER SYSTEMLIMITINGCONDITION FOROPERATION 3.7.1.2a.Atleastthreeindependent steamgenerator auxiliary feedwater pumpsandassociated flowpathsshallbeOPERABLEwith:1.Twomotor-driven auxiliary feedwater pumps,eachcapableofbeingpoweredfromseparateemergency busses,and2.Onesteamturbine-driven auxiliary feedwater pumpcapableofbeingpoweredfromanOPERABLEsteamsupplysystem.b.Atleastoneauxiliary feedwater flowpathinsupportofUnit2shutdownfunctions shallbeavailable.
APPLICABILITY:
APPLICABILITY:
Specification 3.7'.2.a-MODES1,2,3.Specification 3.7.1.2.b
Specification 3.7'.2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 2 is in MODES 1, 2, or 3.ACTIONS'hen Specification 3.7.1.2.a is applicable:
-AtalltimeswhenUnit2isinMODES1,2,or3.ACTIONS'hen Specification 3.7.1.2.a isapplicable:
a~With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours'.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.When Specification 3.7.1.2.b is applicable:
a~Withoneauxiliary feedwater pumpinoperable, restoretherequiredauxiliary feedwater pumpstoOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinHOTSHUTDOWNwithinthefollowing 6hours.b.Withtwoauxiliary feedwater pumpsinoperable, beinatleastHOTSTANDBYwithin6hoursandinHOTSHUTDOWNwithinthefollowing 6hours'.Withthreeauxiliary feedwater pumpsinoperable, immediately initiatecorrective actiontorestoreatleastoneauxiliary feedwater pumptoOPERABLEstatusassoonaspossible.
With no flow path to Unit 2 available, return at least one flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return at least one flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specification 3.0.4 are not applicable.
WhenSpecification 3.7.1.2.b isapplicable:
COOK NUCLEAR PLANT-UNIT 1 3/4 7-5 AMENDMENT NO.g7, NP,  
WithnoflowpathtoUnit2available, returnatleastoneflowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit2andreturnatleastoneflowpathtoavailable statuswithinthenext60days,orhaveUnit2inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.Therequirements ofSpecification 3.0.4arenotapplicable.
'L 1'L fl ta REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING+LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:
COOKNUCLEARPLANT-UNIT13/47-5AMENDMENT NO.g7,NP,  
Vith fuel assemblies in the storage pool.ACTION: Llith the requirements of the above specification not satisfied, place the crane load in a safe condition.
'L1'Lflta REFUELING OPERATIONS CRANETRAVEL-SPENTFUELSTORAGEPOOLBUILDING+
The provisions of Specification 3.0.3 are not applicable.
LIMITINGCONDITION FOROPERATION 3.9.7Loadsinexcessof2,500poundsshallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespentfuelpoolandtheheightsatwhichtheymaybecarriedoverrackscontaining fuelshallbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,
SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.
iftheloadsaredroppedfromthecrane.APPLICABILITY:
4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be less than or equal to 24,240 in.-lbs.prior to moving each load over racks containing fuel.~'i Shared system with Cook Nuclear Plant-Unit 2."COOK NUCLEAR PLANT-UNIT 1 3/4 9-8 AMENDMENT NO.NX, ZAP 5.0 DESIGN FEATURES 5.1 SITE EXCLUSION AREA 5.1.1 The exclusion area shall be as shown in Figure 5.1-1.LOW POPULATION ZONE 5.1.2 The low population zone shall be as shown in Figure 5.1-2.Site Boundar For Gaseous and Li uid Effluents 5.1.3 The SITE BOUNDARY for gaseous and liquid effluents shall be as shown in Figure 5.1-3.5.2 CONTAINMENT CONFIGURATION 5.2.1 The reactor containment building is a steel lined, reinforced concrete building of cylindrical shape, with a dome roof and having the following design features: a.Nominal inside diameter 115 feet.b.Nominal inside height 160 feet.+c.Minimum thickness of concrete walls 3'6".d.Minimum thickness of concrete roof 2'6".e.Minimum thickness of concrete floor pad 10 feet.Nominal thickness of steel liner, side and dome 3/8 inches.g.Nominal thickness of steel liner, bottom 1/4 inch.h.Net free volume 1.24 x 10 cubic feet.6 From grade (Elev.608')to inside of dome.COOK NUCLEAR PLANT-UNIT 1 5-1 AMENDMENT NO, H9 1~'ri$'f Docket No.316 Page 5 of 11 (1)Deleted by Amendment 63.(m)Deleted by Amendment 19'n)Deleted by Amendment 28.(o)Fire Protection Amendment No.12 The licensee may proceed with and is required to complete the modifications identified in Table 1 of the Fire Protection Safety Evaluation Report for the Donald C.Cook Nuclear Plant dated June 4, 1979'hese modifications shall be completed in accordance with the dates contained in Table 1 of that SER or Supplements thereto.Administrative controls for fire protection as described in the licensee's submittals dated January 31, 1977 and October 27, 1977 shall be implemented and maintained.
Vithfuelassemblies inthestoragepool.ACTION:Lliththerequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.
Amendment No.64, 121~~(p)Deleted by Amendment 121 DEFINITIONS SOLIDIFICATION 1.29 SOLIDIFICATION shall be the conversion of radioactive liquid, resin and sludge wastes from liquid systems into a form that meets shipping and burial site requirements.
Theprovisions ofSpecification 3.0.3arenotapplicable.
OFFSITE DOSE CALCULATION MANUAL ODCM 1.30 The OFFSITE DOSE CALCULATION MANUAL shall contain the methodology and parameters used in the calculation of offsite doses due to radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm/trip setpoints and the conduct of environmental radiological monitoring program.GASEOUS RADWASTE TREATMENT SYSTEM 1.31 A GASEOUS RADWASTE TREATMENT SYSTEM is any system designed and installed to reduce radioactive gaseous effluents by collecting primary coolant system off-gases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment.
SURVEILLANCE REUIREMENTS 4.9.7.1Craneinterlocks whichpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.
VENTILATION EXHAUST TREATMENT SYSTEM , 1~32 A VENTILATION EXHAUST TREATMENT SYSTEM is any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate.
4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobelessthanorequalto24,240in.-lbs.priortomovingeachloadoverrackscontaining fuel.~'iSharedsystemwithCookNuclearPlant-Unit2."COOKNUCLEARPLANT-UNIT13/49-8AMENDMENT NO.NX,ZAP 5.0DESIGNFEATURES5.1SITEEXCLUSION AREA5.1.1Theexclusion areashallbeasshowninFigure5.1-1.LOWPOPULATION ZONE5.1.2Thelowpopulation zoneshallbeasshowninFigure5.1-2.SiteBoundarForGaseousandLiuidEffluents 5.1.3TheSITEBOUNDARYforgaseousandliquideffluents shallbeasshowninFigure5.1-3.5.2CONTAINMENT CONFIGURATION 5.2.1Thereactorcontainment buildingisasteellined,reinforced concretebuildingofcylindrical shape,withadomeroofandhavingthefollowing designfeatures:
form in effluents by passing ventilation or vent exhaust gases through charcoal absorbers and/or HEPA filters for the purpose of removing iodines or particulates from the gaseous exhaust stream prior to the release to the environment.
a.Nominalinsidediameter115feet.b.Nominalinsideheight160feet.+c.Minimumthickness ofconcretewalls3'6".d.Minimumthickness ofconcreteroof2'6".e.Minimumthickness ofconcretefloorpad10feet.Nominalthickness ofsteelliner,sideanddome3/8inches.g.Nominalthickness ofsteelliner,bottom1/4inch.h.Netfreevolume1.24x10cubicfeet.6Fromgrade(Elev.608')toinsideofdome.COOKNUCLEARPLANT-UNIT15-1AMENDMENT NO,H9 1~'ri$'f DocketNo.316Page5of11(1)DeletedbyAmendment 63.(m)DeletedbyAmendment 19'n)DeletedbyAmendment 28.(o)FireProtection Amendment No.12Thelicenseemayproceedwithandisrequiredtocompletethemodifications identified inTable1oftheFireProtection SafetyEvaluation ReportfortheDonaldC.CookNuclearPlantdatedJune4,1979'hesemodifications shallbecompleted inaccordance withthedatescontained inTable1ofthatSERorSupplements thereto.Administrative controlsforfireprotection asdescribed inthelicensee's submittals datedJanuary31,1977andOctober27,1977shallbeimplemented andmaintained.
Such a system is not considered to have any effect on noble gas effluents.
Amendment No.64,121~~(p)DeletedbyAmendment 121 DEFINITIONS SOLIDIFICATION 1.29SOLIDIFICATION shallbetheconversion ofradioactive liquid,resinandsludgewastesfromliquidsystemsintoaformthatmeetsshippingandburialsiterequirements.
Engineered Safety Feature (ESF)atmospheric cleanup systems are not considered to be VENTILATION EXHAUST TREATMENT SYSTEM components'URGE-PURGING 1.33 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidi.ty, concentration or other operating condition, in such a manner that replacement air or gas is required to purify the confinement.
OFFSITEDOSECALCULATION MANUALODCM1.30TheOFFSITEDOSECALCULATION MANUALshallcontainthemethodology andparameters usedinthecalculation ofoffsitedosesduetoradioactive gaseousandliquideffluents, inthecalculation ofgaseousandliquideffluentmonitoring alarm/trip setpoints andtheconductofenvironmental radiological monitoring program.GASEOUSRADWASTETREATMENT SYSTEM1.31AGASEOUSRADWASTETREATMENT SYSTEMisanysystemdesignedandinstalled toreduceradioactive gaseouseffluents bycollecting primarycoolantsystemoff-gases fromtheprimarysystemandproviding fordelayorholdupforthepurposeofreducingthetotalradioactivity priortoreleasetotheenvironment.
VENTING 1.34 VENTING is the controlled process of discharging air or gas from,a confinement to maintain temperature, pressure, humidity, concentration or other operating condition, in such a manner that replacement air or gas is not provided or required during VENTING.Vent, used in system names, does not imply a VENTING process.COOK NUCLEAR PLANT-UNIT 2 1-7 AMENDMENT NO.
VENTILATION EXHAUSTTREATMENT SYSTEM,1~32AVENTILATION EXHAUSTTREATMENT SYSTEMisanysystemdesignedandinstalled toreducegaseousradioiodine orradioactive materialinparticulate.
0 Pl r, t'.f 4 P.
formineffluents bypassingventilation orventexhaustgasesthroughcharcoalabsorbers and/orHEPAfiltersforthepurposeofremovingiodinesorparticulates fromthegaseousexhauststreampriortothereleasetotheenvironment.
2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS REACTOR CORE 2.1.1 The combination of THERMAL POWER, pressurizer pressure, and the highest operating loop coolant average temperature (T)shall not exceed avg the limits shown in Figure 2.1-1 for 4 loop operation.
Suchasystemisnotconsidered tohaveanyeffectonnoblegaseffluents.
Engineered SafetyFeature(ESF)atmospheric cleanupsystemsarenotconsidered tobeVENTILATION EXHAUSTTREATMENT SYSTEMcomponents'URGE-PURGING 1.33PURGEorPURGINGisthecontrolled processofdischarging airorgasfromaconfinement tomaintaintemperature,
: pressure, humidi.ty, concentration orotheroperating condition, insuchamannerthatreplacement airorgasisrequiredtopurifytheconfinement.
VENTING1.34VENTINGisthecontrolled processofdischarging airorgasfrom,aconfinement tomaintaintemperature,
: pressure, humidity, concentration orotheroperating condition, insuchamannerthatreplacement airorgasisnotprovidedorrequiredduringVENTING.Vent,usedinsystemnames,doesnotimplyaVENTINGprocess.COOKNUCLEARPLANT-UNIT21-7AMENDMENT NO.
0Plr,t'.f4P.
2.0SAFETYLIMITSANDLIMITINGSAFETYSYSTEMSETTINGS2.1SAFETYLIMITSREACTORCORE2.1.1Thecombination ofTHERMALPOWER,pressurizer
: pressure, andthehighestoperating loopcoolantaveragetemperature (T)shallnotexceedavgthelimitsshowninFigure2.1-1for4loopoperation.
APPLICABILITY:
APPLICABILITY:
MODES1and2.ACTION:Wheneverthepointdefinedbythecombination ofthehighestoperating loopaveragetemperature andTHERMALPOWERhasexceededtheappropriate pressurizer pressureline,beinHOTSTANDBYwithin1hour.REACTORCOOLANTSYSTEMPRESSURE2'~2TheReactorCoolantSystempressureshallnotexceed2735psig.APPLICABILITY:
MODES 1 and 2.ACTION: Whenever the point defined by the combination of the highest operating loop average temperature and THERMAL POWER has exceeded the appropriate pressurizer pressure line, be in HOT STANDBY within 1 hour.REACTOR COOLANT SYSTEM PRESSURE 2'~2 The Reactor Coolant System pressure shall not exceed 2735 psig.APPLICABILITY:
MODES1,2,3,4and5.ACTION:MODES1and2WhenevertheReactorCoolantSystempressurehasexceeded2735psig,beinHOTSTANDBYwiththeReactorCoolantSystempressurewithinitslimitwithin1hour.MODES3,4and5WhenevertheReactorCoolantSystempressurehasexceeded2735psig,reducetheReactorCoolantSystempressuretowithinitslimitwithin5minutes.COOKNUCLEARPLANT-UNIT22-1AMENDMENT NO.N 1fj0Ji~t/
MODES 1, 2, 3, 4 and 5.ACTION: MODES 1 and 2 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, be in HOT STANDBY with the Reactor Coolant System pressure within its limit within 1 hour.MODES 3, 4 and 5 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, reduce the Reactor Coolant System pressure to within its limit within 5 minutes.COOK NUCLEAR PLANT-UNIT 2 2-1 AMENDMENT NO.N 1 fj 0 Ji~t/
3.4.2POWERDISTRIBUTION LIMITSAXIALFLUXDIFFERENCE AFDLIMITINGCONDITION FOROPERATION 3.2.1Theindicated AXIALFLUXDIFFERENCE (AFD)shallbemaintained withinthetarget'band aboutatargefluxdifference.
3.4.2 POWER DISTRIBUTION LIMITS AXIAL FLUX DIFFERENCE AFD LIMITING CONDITION FOR OPERATION 3.2.1 The indicated AXIAL FLUX DIFFERENCE (AFD)shall be maintained within the target'band about a targe flux difference.
Thetargetbandisspecified intheCOLR.APPLICABILITY:
The target band is specified in the COLR.APPLICABILITY:
MODE1above50%RATEDTHERMALPOWER+ACTION:a.Withtheindicated AXIALFLUXDIFFERENCE outsideofthetargetbandaboutthetargetfluxdifference andwithTHERMALPOWER:l.Above90%or0.9xAPL(whichever isless)ofRATEDTHERMALPOWER,within15minutes:a)Eitherrestoretheindicated AFDtowithinthetargetbandlimits,orb)ReduceTHERMALPOWERtolessthan90'%r0.9xAPL(whichever isless)ofRATEDTHERMALPOWER.2.Between50%and90%or0.9xAPL(whichever isless)ofRATEDTHERMALPOWER;a)POWEROPERATION maycontinueprovided:
MODE 1 above 50%RATED THERMAL POWER+ACTION: a.With the indicated AXIAL FLUX DIFFERENCE outside of the target band about the target flux difference and with THERMAL POWER: l.Above 90%or 0.9 x APL (whichever is less)of RATED THERMAL POWER, within 15 minutes: a)Either restore the indicated AFD to within the target band limits, or b)Reduce THERMAL POWER to less than 90'%r 0.9 x APL (whichever is less)of RATED THERMAL POWER.2.Between 50%and 90%or 0.9 x APL (whichever is less)of RATED THERMAL POWER;a)POWER OPERATION may continue provided: 1)The indicated AFD has not been outside of the target band for more than 1 hour penalty deviation cumulative during the previous 24 hours, and 2)The indicated AFD is within the limits specified in the COLE.Otherwise, reduce THERMAL POWER to less than 50%of RATED THERMAL POWER within 30 minutes and reduce the Power Range Neutron Flux-High Trip Setpoints to less than or equal to 55%of RATED THERMAL POWER within the next 4 hours.b)Surveillance testing of the Power Range'eutron Flux Channels may be performed pursuant to Specification 4.3.1.1.1 provided the indicated AFD is maintained within the limit specified in the COLR.A total of 16 hours operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.
1)Theindicated AFDhasnotbeenoutsideofthetargetbandformorethan1hourpenaltydeviation cumulative duringtheprevious24hours,and2)Theindicated AFDiswithinthelimitsspecified intheCOLE.Otherwise, reduceTHERMALPOWERtolessthan50%ofRATEDTHERMALPOWERwithin30minutesandreducethePowerRangeNeutronFlux-High TripSetpoints tolessthanorequalto55%ofRATEDTHERMALPOWERwithinthenext4hours.b)Surveillance testingofthePowerRange'eutron FluxChannelsmaybeperformed pursuanttoSpecification 4.3.1.1.1 providedtheindicated AFDismaintained withinthelimitspecified intheCOLR.Atotalof16hoursoperation maybeaccumulated withtheAFDoutsideofthetargetbandduringthistestingwithoutpenaltydeviation.
>'<See Special Test Exception 3'0.2 COOK NUCLEAR PLANT-UNIT 2 3/4 2-1 AMENDMENT NO.Ag, gg7, Xg/
>'<SeeSpecialTestException 3'0.2COOKNUCLEARPLANT-UNIT23/42-1AMENDMENT NO.Ag,gg7,Xg/
II'I P P t P TABLE 3.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION FUNCTIONAL UNIT TOTAL NO.OF CHAN-NELS CHANNELS TO TRIP MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 1.Manual Reactor Trip 2.Power Range, Neutron Flux 1,2 and+12 1, 2 and*2&#xb9;3.Power Range, Neutron Flux, High Positive Rate 1 2 2&#xb9;4.Power Range, Neutron Flux, High Negative Rate 1, 2 2&#xb9;5.Intermediate Range, Neutron Flux 1, 2 and+3 6.Source Range, Neutron Flux A.Startup B.Shutdown 2&#xb9;&#xb9;and+4 3, 4 and 5 5 7.Overtemperature Delta T Four Loop Operation 8.Overpower Delta T Four.Loop Operation 1, 2 1, 2 6&#xb9;6&#xb9;COOK NUCLEAR PLANT-UNIT 2 3/4 3-2 AMENDMENT NO.N  
II'IPPtP TABLE3.3-1REACTORTRIPSYSTEMINSTRUMENTATION FUNCTIONAL UNITTOTALNO.OFCHAN-NELSCHANNELSTOTRIPMINIMUMCHANNELSOPERABLEAPPLICABLE MODESACTION1.ManualReactorTrip2.PowerRange,NeutronFlux1,2and+121,2and*2&#xb9;3.PowerRange,NeutronFlux,HighPositiveRate122&#xb9;4.PowerRange,NeutronFlux,HighNegativeRate1,22&#xb9;5.Intermediate Range,NeutronFlux1,2and+36.SourceRange,NeutronFluxA.StartupB.Shutdown2&#xb9;&#xb9;and+43,4and557.Overtemperature DeltaTFourLoopOperation 8.Overpower DeltaTFour.LoopOperation 1,21,26&#xb9;6&#xb9;COOKNUCLEARPLANT-UNIT23/43-2AMENDMENT NO.N  
~I)r3 0 C~~".Iy C TABLE 3.3-1 Continued REACTOR TRIP SYSTEM INSTRUMENTATION FUNCTIONAL UNIT TOTAL NO.OF CHAN-CHANNELS NELS TO TRI MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 9.Pressurizer Pressure Low 1, 2 6&#xb9;'10.Pressurizer Pressure-High 11.Pressurizer Water Level--High 1, 2 1, 2 6&#xb9;7&#xb9;12.Loss of Flow-Single Loop (Above P-8)3/loop 2/loop in any opera-ting loop 2/loop in 1 each operating loop 13.Loss of Flow-Two Loops (Above P-7 and below P-8)14.Steam Generator Water Level-Low-Low 3/loop 3/loop 2/loop in two opera-ting loops 2/loop in any opera-ting loop 2/loop in each opera-ting loop 2/loop 1, 2 each operating loop 7&#xb9;7&#xb9;15.Steam/Feedwater Flow Mismatch and Low Steam Generator Water 2/loop level and 2/loop-flow mismatch in same loop 1/loop level coincident with 1/loop-flow mis-match in same loop 1/loop-level and 2/loop-flow mismatch or 2/loop-level and 1/loop-flow mismatch 1, 2 7&#xb9;COOK NUCLEAR PLANT-UNIT 2 3/4 3-3 AMENDMENT NO.Ni lP7 t>>E TABLE 3.3-1 Continued REACTOR TRIP SYSTEM INSTRUMENTATION FUNCTIONAL UNIT 16.Undervoltage-Reactor Coolant Pumps 17.Underfrequency-Reactor Coolant Pumps 18.Turbine Trip;A.Low Fluid Oil Pressure B.Turbine Stop Valve Closure TOTAL NO.OF CHAN-CHANNELS NELS TO TRI 4-1/bus 2 4-1/bus MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 6&#xb9;6&#xb9;7&#xb9;6&#xb9;19.Safety Injection Input from ESF 2 1, 2 20.Reactor Coolant Pump Breaker Position Trip Above P-7 21.Reactor Trip Breakers 1/breaker 1/breaker per operating loop 1,2, 3%,4%,5i'r 1,13, 14 22.Automatic Trip Logic 1,2, 3>'r, 4>'c, 5~'<1 14 COOK NUCLEAR PLANT-UNIT 2 3/4 3-4 AMENDMENT NO.PP, gPj, ggj 4 fi gt TABLE 3.3-6 (Continued)
~I)r30C~~".IyC TABLE3.3-1Continued REACTORTRIPSYSTEMINSTRUMENTATION FUNCTIONAL UNITTOTALNO.OFCHAN-CHANNELSNELSTOTRIMINIMUMCHANNELSOPERABLEAPPLICABLE MODESACTION9.Pressurizer PressureLow1,26&#xb9;'10.Pressurizer Pressure-High11.Pressurizer WaterLevel--High1,21,26&#xb9;7&#xb9;12.LossofFlow-SingleLoop(AboveP-8)3/loop2/loopinanyopera-tingloop2/loopin1eachoperating loop13.LossofFlow-TwoLoops(AboveP-7andbelowP-8)14.SteamGenerator WaterLevel-Low-Low 3/loop3/loop2/loopintwoopera-tingloops2/loopinanyopera-tingloop2/loopineachopera-tingloop2/loop1,2eachoperating loop7&#xb9;7&#xb9;15.Steam/Feedwater FlowMismatchandLowSteamGenerator Water2/loopleveland2/loop-flowmismatchinsameloop1/looplevelcoincident with1/loop-flowmis-matchinsameloop1/loop-level and2/loop-flow mismatchor2/loop-level and1/loop-flow mismatch1,27&#xb9;COOKNUCLEARPLANT-UNIT23/43-3AMENDMENT NO.NilP7 t>>E TABLE3.3-1Continued REACTORTRIPSYSTEMINSTRUMENTATION FUNCTIONAL UNIT16.Undervoltage-Reactor CoolantPumps17.Underfrequency-ReactorCoolantPumps18.Turbine Trip;A.LowFluidOilPressureB.Turbine StopValveClosureTOTALNO.OFCHAN-CHANNELSNELSTOTRI4-1/bus24-1/busMINIMUMCHANNELSOPERABLEAPPLICABLE MODESACTION6&#xb9;6&#xb9;7&#xb9;6&#xb9;19.Safety Injection InputfromESF21,220.Reactor CoolantPumpBreakerPositionTripAboveP-721.Reactor TripBreakers1/breaker1/breaker peroperating loop1,2,3%,4%,5i'r 1,13,1422.Automatic TripLogic1,2,3>'r,4>'c,5~'<114COOKNUCLEARPLANT-UNIT23/43-4AMENDMENT NO.PP,gPj,ggj 4figt TABLE3.3-6(Continued)
TABLE NOTATION'CTION 20-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, comply with the ACTION requirements of Specification 3.4.6'.ACTION 21-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per day.ACTION 22-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, comply with the ACTION requirements of Specification 3.9.9." This ACTION is not required during the performance of containment integrated leak rate test.ACTION 22A-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements:
TABLENOTATION'CTION 20-WiththenumberofchannelsOPERABLElessthanrequiredbytheMinimumChannelsOperablerequirement, complywiththeACTIONrequirements ofSpecification 3.4.6'.ACTION21-WiththenumberofchannelsOPERABLElessthanrequiredbytheMinimumChannelsOperablerequirement, performareasurveysofthemonitored areawithportablemonitoring instrumentation atleastonceperday.ACTION22-WiththenumberofchannelsOPERABLElessthanrequiredbytheMinimumChannelsOperablerequirement, complywiththeACTIONrequirements ofSpecification 3.9.9."ThisACTIONisnotrequiredduringtheperformance ofcontainment integrated leakratetest.ACTION22A-WiththenumberofOPERABLEChannelslessthanrequiredbytheMinimumChannelsOPERABLErequirements:
1~either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable.
1~eitherrestoretheinoperable Channel(s) toOPERABLEstatuswithin7daysoftheevent,or2.prepareandsubmitaSpecialReporttotheCommission pursuanttoSpecification 6.9.2within14daysfollowing theeventoutlining theactiontaken,thecauseoftheinoperability andtheplansandscheduleforrestoring thesystemtoOPERABLEstatus.3.Technical Specification Sections3.0.3and3.0.4NotApplicable.
ACTION 22B-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements.
ACTION22B-WiththenumberofOPERABLEChannelslessthanrequiredbytheMinimumChannelsOPERABLErequirements.
l.either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and'he plans and schedule for restoring the system to OPERABLE status.3.In the event of an accident involving radiological releases initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours.4.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable.
l.eitherrestoretheinoperable Channel(s) toOPERABLEstatuswithin7daysoftheevent,or2.prepareandsubmitaSpecialReporttotheCommission pursuanttoSpecification 6.9.2within14daysfollowing theeventoutlining theactiontaken,thecauseoftheinoperability and'heplansandscheduleforrestoring thesystemtoOPERABLEstatus.3.Intheeventofanaccidentinvolving radiological releasesinitiatethepreplanned alternate methodofmonitoring theappropriate parameter(s) within72hours.4.Technical Specification Sections3.0.3and3.0.4NotApplicable.
COOK NUCLEAR PLANT-UNIT 2 3/4 3-36 AMENDMENT NO W, v J C INSTRUMENT TABLE 3.3-10 POST-ACCIDENT MONITORING INSTRUMENTATION MINIMUM CHANNELS OPERABLE 1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18'ontainment Pressure Reactor Coolant Outlet Temperature
COOKNUCLEARPLANT-UNIT23/43-36AMENDMENT
-T (Wide Range)Reactor Coolant Inlet Temperature
: NOW, vJC INSTRUMENT TABLE3.3-10POST-ACCIDENT MONITORING INSTRUMENTATION MINIMUMCHANNELSOPERABLE1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18'ontainment PressureReactorCoolantOutletTemperature
-T (Wide Range)Reactor Coolant Pressure-Wide Range Pressurizer Water Level Steam Line Pressure Steam Generator Water Level-Narrow Range Refueling Water Storage Tank Water Level Boric Acid Tank Solution Level Auxiliary Feedwater Flow Rate Reactor Coolant System Subcooling Margin Monitor PORV Position Indicator-Limit Switches~PORV Block Valve Position Indicator-Limit Switches Safety Valve Position Indicator-Acoustic Monitor Incore Thermocouples (Core Exit Thermocouples)
-T(WideRange)ReactorCoolantInletTemperature
Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication)
-T(WideRange)ReactorCoolantPressure-WideRangePressurizer WaterLevelSteamLinePressureSteamGenerator WaterLevel-NarrowRangeRefueling WaterStorageTankWaterLevelBoricAcidTankSolutionLevelAuxiliary Feedwater FlowRateReactorCoolantSystemSubcooling MarginMonitorPORVPositionIndicator
Containment Sump Level Containment Water Level 2 2 2 2 2 2/steam generator 1/steam generator 2 1 1/steam generator*
-LimitSwitches~
]%%'1/valve 1/valve 1/valve 2/core quadrant one-train(3 channels/train)
PORVBlockValvePositionIndicator
]~2%9hlPk Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument.
-LimitSwitchesSafetyValvePositionIndicator
PPC subcooling margin readout can be used as a substitute for the subcooling monitor instrument.
-AcousticMonitorIncoreThermocouples (CoreExitThermocouples)
Acoustic monitoring of PORV position (1 channel per three valves-headered discharge) can be used as a substitute for the PORV Position Indicator-Limit Switches instruments'he requirements for these instruments will.become effective after the level transmitters are modified or replaced and become operational.
ReactorCoolantInventory TrackingSystem(ReactorVesselLevelIndication)
The schedule for modification or replacement of the transmitters is described in the Bases.COOK NUCLEAR PLANT-UNIT 2 3/4 3-46 AMENDMENT NO.Pg, gt  
Containment SumpLevelContainment WaterLevel222222/steamgenerator 1/steamgenerator 211/steamgenerator*
)fan t I,"~l'%
]%%'1/valve1/valve1/valve2/corequadrantone-train(3 channels/train)
TABLE 3.3-11 Unit 2 and Common Area Fire Detection S stems Detection S stem Location Total Number of Detectors Auxiliary Building a)Elevation 573 b)Elevation 587 c)Elevation 609 d)Elevation 633 e)Elevation 650 f)New Fuel STGE Area Heat (x/y)*Flame (x/y)*Smoke (x/y)%23/OC 55/OC 41/OC 41/OC 34/OC 4/OC U2 East Main Steam Valve Enclosure U2 Main Steam Line Area El.612 (Around Containment)
]~2%9hlPkSteamGenerator WaterLevelChannelscanbeusedasasubstitute forthecorresponding auxiliary feedwater flowratechannelinstrument.
U2 NESW Valve Area El.612 28/P~]3/OMY 2/0 U2 4KV Switchgear (AB)U2 4KV Switchgear (CD)U2 Engr.Safety System Switchgear
PPCsubcooling marginreadoutcanbeusedasasubstitute forthesubcooling monitorinstrument.
&XFMR.Rm.U2 CRD, XFMR&Switchgear Rm.Inverter&AB Bttry.Rms.0/3 0/3 0/2 0/2 0/5 0/14 0/5 0/17 U2 Pressurizer Heater XFMR~Rm.U2 Diesel Fuel Oil XFMR.Rm.U2 Diesel Generator Rm.2AB U2 Diesel Generator Rm.2CD U2 Diesel Generator Ramp Corr.U1&2 AFWP Vestibule 0/1 0/2 0/2 12/0 4/0 2/OC U2 Control Room U2 Switchgear Cable Vault U2 Control Rm.Cable Vault U2 Aux.Cable Vault 42/0 0/]PM'<O'/13 0/76~'nw 0/6 Ul&2 ESW Basement Area U2 ESW Pump&MCC Rms.4/OC 9/0 C System protects area common to both Units 1 and 2+(x/y)x is number of Function A (early warning fire detection and notification only)instruments.
Acousticmonitoring ofPORVposition(1channelperthreevalves-headereddischarge) canbeusedasasubstitute forthePORVPositionIndicator-LimitSwitchesinstruments'he requirements fortheseinstruments will.becomeeffective aftertheleveltransmitters aremodifiedorreplacedandbecomeoperational.
y is, number of Function B (actuation of fire suppression systems and early warning and notifi.cation) instruments.
Thescheduleformodification orreplacement ofthetransmitters isdescribed intheBases.COOKNUCLEARPLANT-UNIT23/43-46AMENDMENT NO.Pg,gt  
circuit contains both smoke and flame detectors two circuits of five detectors each two circuits of 38 detectors each COOK NUCLEAR PLANT-UNIT 2 3/4 3-52 AMENDMENT NO.N, X2$  
)fantI,"~l'%
<<ji 0 ir 0 VF REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION Continued 2.With two or more block~alves inoperable, C.Within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions'f ACTION a.2 or a~3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriate.
TABLE3.3-11Unit2andCommonAreaFireDetection SstemsDetection SstemLocationTotalNumberofDetectors Auxiliary Buildinga)Elevation 573b)Elevation 587c)Elevation 609d)Elevation 633e)Elevation 650f)NewFuelSTGEAreaHeat(x/y)*Flame(x/y)*Smoke(x/y)%23/OC55/OC41/OC41/OC34/OC4/OCU2EastMainSteamValveEnclosure U2MainSteamLineAreaEl.612(AroundContainment)
k'ith PORVs'and block valves not in the same line inoperable,*
U2NESWValveAreaEl.61228/P~]3/OMY2/0U24KVSwitchgear (AB)U24KVSwitchgear (CD)U2Engr.SafetySystemSwitchgear
within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve in each line.Apply the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable.
&XFMR.Rm.U2CRD,XFMR&Switchgear Rm.Inverter&ABBttry.Rms.0/30/30/20/20/50/140/50/17U2Pressurizer HeaterXFMR~Rm.U2DieselFuelOilXFMR.Rm.U2DieselGenerator Rm.2ABU2DieselGenerator Rm.2CDU2DieselGenerator RampCorr.U1&2AFWPVestibule 0/10/20/212/04/02/OCU2ControlRoomU2Switchgear CableVaultU2ControlRm.CableVaultU2Aux.CableVault42/00/]PM'<O'/13 0/76~'nw0/6Ul&2ESWBasementAreaU2ESWPump&MCCRms.4/OC9/0CSystemprotectsareacommontobothUnits1and2+(x/y)xisnumberofFunctionA(earlywarningfiredetection andnotification only)instruments.
d.The provisions of Specification 3.0.4 are not applicable.
yis,numberofFunctionB(actuation offiresuppression systemsandearlywarningandnotifi.cation) instruments.
SURVEILLANCE RE UIREMENTS 4.4.11.1 Each of the three PORVs shall be demonstrated OPERABLE: a.At least once per 31 days by performance of a CHANNEL FUNCTIONAL TEST, excluding valve operation, and b.At least once per 18 months by performance of'a CHANNEL CALIBRATION.
circuitcontainsbothsmokeandflamedetectors twocircuitsoffivedetectors eachtwocircuitsof38detectors eachCOOKNUCLEARPLANT-UNIT23/43-52AMENDMENT NO.N,X2$  
4~4~11.2 Each of the three block valves shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested'hen ACTION 3.4'l.a or 3.4.11.c is applied.4.F 11.3 The emergency power supply for the PORVs and block valves.shall be demonstrated OPERABLE at least once per 18 months by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite plant batteries.
<<ji0ir0VF REACTORCOOLANTSYSTEMLIMITINGCONDITION FOROPERATION Continued 2.Withtwoormoreblock~alvesinoperable, C.Within1houreither(1)restoreatotalofatleasttwoblockvalvestoOPERABLEstatus,or(2)closetheblockvalvesandremovepowerfromtheblockvalves,or(3)closetheassociated PORVsandremovepowerfromtheirassociated solenoidvalves;andapplytheportions'f ACTIONa.2ora~3aboveforinoperable PORVs,relatingtoOPERATIONAL MODE,asappropriate.
This testing can be performed in conjunction with the requirements of Specifications 4.8.1.1.2.e and 4.8.2.3.2.d.
k'ithPORVs'andblockvalvesnotinthesamelineinoperable,*
*PORVs isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.
within1houreither(1)restorethevalvestoOPERABLEstatusor(2)closeandde-energize theothervalveineachline.ApplytheportionsofACTIONa.2ora.3above,relatingtoOPERATIONAL MODE,asappropriate fortwoorthreelinesunavailable.
COOK NUCLEAR PLANT-UNIT 2 3/4 4-33 AMENDMENT NO.Ni 97(Z8Z 1~~I>h 1 P EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE: a~At least once per 12 hours by verifying that the following valves are in the indicated positions with the control power locked out: Valve Number Valve Function Valve Position a.IMO-390 b.IMO-315 c.IMO-325 d.IMP-262+e.IMO-263*f.IMO-261*g.ICM-305+h.ICM-306+a.RVST to RHR b.Low head SI to Hot Leg c.Low head SI to Hot Leg d, Mini flow line e.Mini flow line f.SI Suction g.Sump Line h.Sump Line a.Open b.Closed c.Closed d.Open e.Open f.Open g.Closed h.Closed b.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.ce By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.)is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions.
d.Theprovisions ofSpecification 3.0.4arenotapplicable.
This visual inspection shall be performed:
SURVEILLANCE REUIREMENTS 4.4.11.1EachofthethreePORVsshallbedemonstrated OPERABLE:
1.For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and 2.Of the areas affected within containment at the completion of each containment entry when CONTAINMENT INTEGRITY is established.
a.Atleastonceper31daysbyperformance ofaCHANNELFUNCTIONAL TEST,excluding valveoperation, andb.Atleastonceper18monthsbyperformance of'aCHANNELCALIBRATION.
*These valves must change position during the switchover from injection to recirculation flow following LOCA.COOK NUCLEAR PLANT-UNIT 2 3/4 5-4 AMENDMENT NO.7H, f&#xc3;)<t (,~
4~4~11.2Eachofthethreeblockvalvesshallbedemonstrated OPERABLEatleastonceper92daysbyoperating thevalvethroughonecompletecycleoffulltravel.Theblockvalve(s)donothavetobetested'hen ACTION3.4'l.aor3.4.11.cisapplied.4.F11.3Theemergency powersupplyforthePORVsandblockvalves.shallbedemonstrated OPERABLEatleastonceper18monthsbyoperating thevalvesthroughacompletecycleoffulltravelwhiletheemergency busesareenergized bytheonsitedieselgenerators andonsiteplantbatteries.
CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: a.Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.An overall air lock leakage at P , 12 psig.a'PPLICABILITY:
Thistestingcanbeperformed inconjunction withtherequirements ofSpecifications 4.8.1.1.2.e and4.8.2.3.2.d.
MODES 1, 2, 3 and 4~rate of less than or equal to 0.05 L a ACTION'ith an air lock inoperable, maintain at least one door closed;restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.6'.3 Each containment air lock shall be demonstrated OPERABLE: a.+After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours, by performing an air leakage test without a simulated pressure force on the door by pressurizing the volume between the door seals to 12 psig and verifying a seal leakage rate of no greater than 0.5 L b.+Within 72 hours following each closing,,perform an air leakage test without a simulated pressure force on the door per Specification 4.6'.3.a.;then by performing an air leakage with a simulated pressure force on the door by pressurizing the volume between the door seals to 12 psig and verifying a seal leakage rate of no greater than 0.0005 L~a+Exemption to Appendix"J" of 10 CFR 50.COOK NUCLEAR PLANT-UNIT 2 3/4 6-4 AMENDMENT NO.
*PORVsisolatedtolimitRCSleakagethroughtheirseatsandtheblockvalvesshuttoisolatethisleakagearenotconsidered inoperable.
CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS Continued ce d.At least once per 6 months by conducting an overall air lock leakage test at P (12 psig)and by verifying that the'" overall air lock leakage rate is within its limit.a At least once per 6 months by verifying that only one door in each air lock can be opened at a time.COOK NUCLEAR PLANT-UNIT 2 3/4 6-5 AMENDMENT NO.
COOKNUCLEARPLANT-UNIT23/44-33AMENDMENT NO.Ni97(Z8Z 1~~I>h1P EMERGENCY CORECOOLINGSYSTEMSSURVEILLANCE REUIREMENTS 4.5.2EachECCSsubsystem shallbedemonstrated OPERABLE:
Cl t I TABLE 3.6-1 (Cont'd)CONTAINMENT ISOLATION VALVES VALVE NUMBER D.MANUAL ISOLATION VALVES (Cont'd)(1)FUNCTION ISOLATION TIME IN SECONDS 3.ICM-250 4.ICM-251 5.ICM-260 6.ICM-265 7.ICM-305 8.ICM-306 9.ICM-311&#xb9;10.ICM-321&#xb9;BORON INJECTION OUTLET BORON INJECTION OUTLET SAFETY INJECTION OUTLET SAFETY INJECTION OUTLET RHR/CTS SUCTION FROM SUMP RHR/CTS SUCTION FROM SUMP RHR TO RC HOT LEGS RHR TO RC HOT LEGS NA NA NA NA NA NA NA NA E.OTHER 1.CS-442-1 2.CS-442-2 3.CS-442-3 4.CS-442-4 SEAL WTR.TO RCP&#xb9;1 SEAL WTR.TO RCP&#xb9;2 SEAL WTR.TO RCP&#xb9;3 SEAL WTR.TO RCP&#xb9;4 NA NA NA NA COOK NUCLEAR PLANT-UNIT 2 3/4 6-27 AMENDMENT NO.  
a~Atleastonceper12hoursbyverifying thatthefollowing valvesareintheindicated positions withthecontrolpowerlockedout:ValveNumberValveFunctionValvePositiona.IMO-390b.IMO-315c.IMO-325d.IMP-262+e.IMO-263*f.IMO-261*g.ICM-305+h.ICM-306+a.RVSTtoRHRb.LowheadSItoHotLegc.LowheadSItoHotLegd,Miniflowlinee.Miniflowlinef.SISuctiong.SumpLineh.SumpLinea.Openb.Closedc.Closedd.Opene.Openf.Openg.Closedh.Closedb.Atleastonceper31daysbyverifying thateachvalve(manual,poweroperatedorautomatic) intheflowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
>,E~4 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7,1.2 a.At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with: 1.Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency busses, and 2.One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.b.At least one auxiliary feedwater flow path in support of Unit 1 shutdown function shall be available.
ceByavisualinspection whichverifiesthatnoloosedebris(rags,trash,clothing, etc.)ispresentinthecontainment whichcouldbetransported tothecontainment sumpandcauserestriction ofthepumpsuctionsduringLOCAconditions.
Thisvisualinspection shallbeperformed:
1.Forallaccessible areasofthecontainment priortoestablishing CONTAINMENT INTEGRITY, and2.Oftheareasaffectedwithincontainment atthecompletion ofeachcontainment entrywhenCONTAINMENT INTEGRITY isestablished.
*Thesevalvesmustchangepositionduringtheswitchover frominjection torecirculation flowfollowing LOCA.COOKNUCLEARPLANT-UNIT23/45-4AMENDMENT NO.7H, f&#xc3;)<t(,~
CONTAINMENT SYSTEMSCONTAINMENT AIRLOCKSLIMITINGCONDITION FOROPERATION 3.6.1.3Eachcontainment airlockshallbeOPERABLEwith:a.Bothdoorsclosedexceptwhentheairlockisbeingusedfornormaltransitentryandexitthroughthecontainment, thenatleastoneairlockdoorshallbeclosed,andb.AnoverallairlockleakageatP,12psig.a'PPLICABILITY:
MODES1,2,3and4~rateoflessthanorequalto0.05LaACTION'ith anairlockinoperable, maintainatleastonedoorclosed;restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.SURVEILLANCE REUIREMENTS 4.6'.3Eachcontainment airlockshallbedemonstrated OPERABLE:
a.+Aftereachopening,exceptwhentheairlockisbeingusedformultipleentries,thenatleastonceper72hours,byperforming anairleakagetestwithoutasimulated pressureforceonthedoorbypressurizing thevolumebetweenthedoorsealsto12psigandverifying asealleakagerateofnogreaterthan0.5Lb.+Within72hoursfollowing eachclosing,,perform anairleakagetestwithoutasimulated pressureforceonthedoorperSpecification 4.6'.3.a.;thenbyperforming anairleakagewithasimulated pressureforceonthedoorbypressurizing thevolumebetweenthedoorsealsto12psigandverifying asealleakagerateofnogreaterthan0.0005L~a+Exemption toAppendix"J"of10CFR50.COOKNUCLEARPLANT-UNIT23/46-4AMENDMENT NO.
CONTAINMENT SYSTEMSSURVEILLANCE REUIREMENTS Continued ced.Atleastonceper6monthsbyconducting anoverallairlockleakagetestatP(12psig)andbyverifying thatthe'"overallairlockleakagerateiswithinitslimit.aAtleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.COOKNUCLEARPLANT-UNIT23/46-5AMENDMENT NO.
CltI TABLE3.6-1(Cont'd)CONTAINMENT ISOLATION VALVESVALVENUMBERD.MANUALISOLATION VALVES(Cont'd)(1)FUNCTIONISOLATION TIMEINSECONDS3.ICM-2504.ICM-2515.ICM-2606.ICM-2657.ICM-3058.ICM-3069.ICM-311&#xb9;10.ICM-321&#xb9;BORONINJECTION OUTLETBORONINJECTION OUTLETSAFETYINJECTION OUTLETSAFETYINJECTION OUTLETRHR/CTSSUCTIONFROMSUMPRHR/CTSSUCTIONFROMSUMPRHRTORCHOTLEGSRHRTORCHOTLEGSNANANANANANANANAE.OTHER1.CS-442-12.CS-442-23.CS-442-34.CS-442-4SEALWTR.TORCP&#xb9;1SEALWTR.TORCP&#xb9;2SEALWTR.TORCP&#xb9;3SEALWTR.TORCP&#xb9;4NANANANACOOKNUCLEARPLANT-UNIT23/46-27AMENDMENT NO.  
>,E~4 PLANTSYSTEMSAUXILIARY FEEDWATER SYSTEMLIMITINGCONDITION FOROPERATION 3.7,1.2a.Atleastthreeindependent steamgenerator auxiliary feedwater pumpsandassociated flowpathsshallbeOPERABLEwith:1.Twomotor-driven auxiliary feedwater pumps,eachcapableofbeingpoweredfromseparateemergency busses,and2.Onesteamturbine-driven auxiliary feedwater pumpcapableofbeingpoweredfromanOPERABLEsteamsupplysystem.b.Atleastoneauxiliary feedwater flowpathinsupportofUnit1shutdownfunctionshallbeavailable.
APPLICABILITY:
APPLICABILITY:
Specification 3.7.1~2.a-MODES1,2,3.Specification 3.7.1.2.b
Specification 3.7.1~2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 1 is in MODES 1, 2, or 3.ACTIONS'hen Specification 3.7.1.2.a is applicable:
-AtalltimeswhenUnit1isinMODES1,2,or3.ACTIONS'hen Specification 3.7.1.2.a isapplicable:
a.With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE statuswithin 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT STANDBY within the following 6 hours.c.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.When Specification 3.7.1.2.b is applicable:
a.Withoneauxiliary feedwater pumpinoperable, restoretherequiredauxiliary feedwater pumpstoOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinHOTSHUTDOWNwithinthefollowing 6hours.b.Withtwoauxiliary feedwater pumpsinoperable, beinatleastHOTSTANDBYwithin6hoursandinHOTSTANDBYwithinthefollowing 6hours.c.Withthreeauxiliary feedwater pumpsinoperable, immediately initiatecorrective actiontorestoreatleastoneauxiliary feedwater pumptoOPERABLEstatusassoonaspossible.
With no flow path to Unit 1 available, return at least one flow path to available status within 7 days,-or provide equivalent shutdown capability in Unit 1 and return at least one flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 bourse'he requirements of Specification 3.0.4 are not applicable, COOK NUCLEAR PLANT-UNIT 2 3/4 7-5 AMENDMENT NO.N 4 T ELECTRICAL POWER SYSTEMS 3 4.8.3 Alternative A.C.Power Sources LIMITING CONDITION FOR OPERATION 3.8.3.1 The steady state bus voltage for the manual alternate reserve source~shall be greater than or equal to 90%of the nominal bus voltage.APPLICABILITY:
WhenSpecification 3.7.1.2.b isapplicable:
Whenever the manual alternate reserve source (69 kV)is connected to more than two buses.ACTION: With bus voltage less than 90%nominal, adjust load on the remaining buses to maintain steady state bus voltage greater than or equal to 90'4 limit.SURVEILLANCE RE UIREMENTS 4.8.3.1 No additional surveillance requirements other than those required by Specifications 4.8.1.1.1 and 4.8.1.2.>>Shared with Cook Nuclear Plant Unit 1, COOK NUCLEAR PLANT-UNIT 2 3/4 8-20 AMENDMENT NO.Xfg 0 IA I I~4 4 ig~l, Qb F 4g REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:
WithnoflowpathtoUnit1available, returnatleastoneflowpathtoavailable statuswithin7days,-orprovideequivalent shutdowncapability inUnit1andreturnatleastoneflowpathtoavailable statuswithinthenext60days,orhaveUnit1inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24bourse'he requirements ofSpecification 3.0.4arenotapplicable, COOKNUCLEARPLANT-UNIT23/47-5AMENDMENT NO.N 4T ELECTRICAL POWERSYSTEMS34.8.3Alternative A.C.PowerSourcesLIMITINGCONDITION FOROPERATION 3.8.3.1Thesteadystatebusvoltageforthemanualalternate reservesource~shallbegreaterthanorequalto90%ofthenominalbusvoltage.APPLICABILITY:
With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.
Wheneverthemanualalternate reservesource(69kV)isconnected tomorethantwobuses.ACTION:Withbusvoltagelessthan90%nominal,adjustloadontheremaining busestomaintainsteadystatebusvoltagegreaterthanorequalto90'4limit.SURVEILLANCE REUIREMENTS 4.8.3.1Noadditional surveillance requirements otherthanthoserequiredbySpecifications 4.8.1.1.1 and4.8.1.2.>>SharedwithCookNuclearPlantUnit1,COOKNUCLEARPLANT-UNIT23/48-20AMENDMENT NO.Xfg 0IAII~44ig~l,QbF4g REFUELING OPERATIONS CRANETRAVEL-SPENTFUELSTORAGEPOOLBUILDING*
The provisions of Specification 3.0.3 are not applicable.
LIMITINGCONDITION FOROPERATION 3.9.7Loadsinexcessof2,500poundsshallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespentfuelpoolandtheheightsatwhichtheymaybecarriedoverrackscontaining fuelshallbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,
SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.
iftheloadsaredroppedfromthecrane.APPLICABILITY:
4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be less than or equal to 24,240 in.-lbs.prior to moving each load over racks containing fuel.*Shared system with Cook Nuclear Plant-Unit l.COOK NUCLEAR PLANT-UNIT 2 3/4 9-7 AMENDMENT NO.gg gg fE'4 REFUELING OPERATIONS CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.9 The Containment Purge and Exhaust isolation system shall be OPERABLE.APPLICABILITY:
Withfuelassemblies inthestoragepool.ACTION:Withtherequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.
During Core Alterations or movement of irradiated fuel within the containment.
Theprovisions ofSpecification 3.0.3arenotapplicable.
ACTION: With the Containment Purge and Exhaust isolation system inoperable, close each of the Purge and Exhaust penetrations providing direct access from the containment atmosphere to the outside atmosphere.
SURVEILLANCE REUIREMENTS 4.9.7.1Craneinterlocks whichpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.
The provisions of Specification 3.0.3 are not applicable.
4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobelessthanorequalto24,240in.-lbs.priortomovingeachloadoverrackscontaining fuel.*SharedsystemwithCookNuclearPlant-Unitl.COOKNUCLEARPLANT-UNIT23/49-7AMENDMENT NO.gggg fE'4 REFUELING OPERATIONS CONTAINMENT PURGEANDEXHAUSTISOLATION SYSTEMLIMITINGCONDITION FOROPERATION 3.9.9TheContainment PurgeandExhaustisolation systemshallbeOPERABLE.
SURVEILLANCE RE UIREMENTS 4.9.9 The Containment Purge and Exhaust isolation system shall be demonstrated OPERABLE within 100 hours prior to the start of and at least once per 7 days during CORE ALTERATIONS by verifying that containment Purge and Exhaust isolation occurs on manual initiation and on a high radiation test signal from each of the containment radiation monitoring instrumentation channels.COOK NUCLEAR PLANT-UNIT 2 3/4 9-9 AMENDMENT NO.lN 4 I'4, 5.0 DESIGN FEATURES 5.1 SITE Exclusion Area 5.1.1 The exclus'ion area shall be as shown in Figure 5.1-1.Low Po ulation Zone 5.1.2 The low population zone shall be as shown in.Figure 5.1-2.Site Boundar For Gaseous and Li uid Effluents 5.1~'3 The SITE BOUNDARY for gaseous and liquid effluents shall be as shown in Figure 5.1-3.5.2 CONTAINMENT CONFIGURATION 5.2.1 The reactor containment building is a steel lined, reinforced concrete building of cylindrical shape, with a dome roof and having the following design features: a.Nominal inside diameter 115 feet.b, Nominal inside height 160 feet.c.Minimum thickness of concrete walls 3'6".d.Minimum thickness of concrete roof 2'6".e.Minimum thickness of concrete floor pad 10 feet.f, Nominal thickness of steel liner'3/8 inches.g.Net free volume 1.24 x 10 cubic feet.6 DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained in accordance with the original design provisions contained in Section 5.2.2 of the FSAR.COOK NUCLEAR PLANT-UNIT 2 5-1 AMENDMENT NO~Pl ATTACHMENT 3 TO AEP:NRC:1137 EXISTING T/S PAGES MARKED TO REFLECT PROPOSED CHANGES Of~f rave p mvmps'g The combination of a pOQER, pressurizer pressure ance rbe hXghesc opera@'ng loop coolanc emperature (T)shall noc exceecL che ave 1&its shovn in Pipce 2.1-1 for 4 loop operas'5n.
APPLICABILITY:
Q~OV: "henevcr rhe po'.'n" ref'.".ed bv rhe combinacion o j-he highesc ooe ac'..g average cempera"'e and.:":"=R~AL PO4KR has exceeCecf"he appropr''a"e pressuri er pressu e 1'ne."e in HOT STANDBY~ichin 1 hour.OT lpga 5 l5 5'0 c 5'.+2.'.2...e Beaccor Coo'.an" 5'rscem"ressure sha'noc exceed 2735"s''>.COLS r., 2.'"8 5 JP>vv'"cene:er-he 2.eac=o in';.O S.A'iD3v~~~~oL 4c a..5 vs rem p essu":".e?.eaccor Coolan=Sys-.h.as excee~ed.i%-s'-r.AQgssu a~~'ene"er='.".e?eacror oo an=Sysrem"ressure.-.-s ex" ceca" red ce=';.e B.eaccor Coolan" Syscem pressure..u~es.L~D.C.COOK-WIT 1 2-1~mme SO.120  
DuringCoreAlterations ormovementofirradiated fuelwithinthecontainment.
~4~O Ps l g UHACCE?TABLE OPERAi'IOH SO Ps/~lOo Ps)oooo Ps 1g P 4 ala 4O Ps p'~see ACCEPTABLE OP c RAT I GH 578 ,PRESSURE (PS IA),5.4.5.6.7.8,.l l.l.l I.Q POUTER lf'rcgtlOh 0(hO+>>Ill BREAKPO IHTS (FRACTION RATED THERMAL POMER, T-.'VG IH DEGREES F)1840 2000 2100 2250 2400 (0.0, 622.1), (1.13, 587.3).(1.20, 577.5)(0.0, 633.8), (1.08, 601.4).(1.20, 586.0)(0.0, 640.8), (1.06, 609.8).(1.20, 591.3)(0.0, 650.7), (1.02, 621.9), (1.20, 598.9)(0.0, 660.1), (0.98, 633.7), (1.20, 606')=REHLTHERMAL-POMER-~.=34QPAR=
ACTION:WiththeContainment PurgeandExhaustisolation systeminoperable, closeeachofthePurgeandExhaustpenetrations providing directaccessfromthecontainment atmosphere totheoutsideatmosphere.
FIGURE 2.1-1 REACTOR CORE SAFETY LIMITS COOK R:CL~c PLAVZ-UNIT 1 2-2 az~vDs~vr yo.7g,,fgp 152 FUHCT IAHAL UNIT IIIIII<2.~2-I~Cunt Inured HEAC1DR TRIP SYSTEH INSTRtNENTAT IOH TRIP SETPOIIITS TRIP SETPOltlT Al LOMABLE VALUES l3.Stcaa Generator Hater level-Lo~-Lo~14.Steam/Feed~atcr Floe Hlseatch and to~Steaa Generator Mater Level l5.Undcrvoltage
Theprovisions ofSpecification 3.0.3arenotapplicable.
-Reactor Coolant Pumps 16.Underfrequency
SURVEILLANCE REUIREMENTS 4.9.9TheContainment PurgeandExhaustisolation systemshallbedemonstrated OPERABLEwithin100hourspriortothestartofandatleastonceper7daysduringCOREALTERATIONS byverifying thatcontainment PurgeandExhaustisolation occursonmanualinitiation andonahighradiation testsignalfromeachofthecontainment radiation monitoring instrumentation channels.
-Reactor Coolant Puaps>-llX of narra rapgc Instr~nt span-each stcam generator~0.71 x lO lb/hr of stean fin>f b at.RAIL.O TIIEfNAL f'OMEH coincident arith steafw generator water level>251 of narc m range l<<stru-eent span-eacli steam generator 2750 volts-each bus>57.5 Ill-each bus>16'l of narrott ringo Inttrt&4nt', span-each steae generator&<0.73 x lO lbs/hr of steae firn at RATED TIIERHAL POHER coincident with steaa generator sratcr level>24K of narra range lnstru-ient span-each stela gcncrator>2725 volts-each bus>57.4 Ilz-each bus l7.Turbine 1rip aoo pslg memmr lu~F/oid01
COOKNUCLEARPLANT-UNIT23/49-9AMENDMENT NO.lN 4I'4, 5.0DESIGNFEATURES5.1SITEExclusion Area5.1.1Theexclus'ion areashallbeasshowninFigure5.1-1.LowPoulationZone5.1.2Thelowpopulation zoneshallbeasshownin.Figure5.1-2.SiteBoundarForGaseousandLiuidEffluents 5.1~'3TheSITEBOUNDARYforgaseousandliquideffluents shallbeasshowninFigure5.1-3.5.2CONTAINMENT CONFIGURATION 5.2.1Thereactorcontainment buildingisasteellined,reinforced concretebuildingofcylindrical shape,withadomeroofandhavingthefollowing designfeatures:
~<~0~$.Turbine Stop Valve)X OPtft Closure>750 pslg>11 open 18.Safety injection Inliut froa ESf lg.Reactor Coolant Puwp Sreaker Pos I t lon Tr lp llot hppl lcablc Hot hppl lcablc Ifot hppl lcablc Hot Appl icablc p Q~~'i'm Q<~atd WP~
a.Nominalinsidediameter115feet.b,Nominalinsideheight160feet.c.Minimumthickness ofconcretewalls3'6".d.Minimumthickness ofconcreteroof2'6".e.Minimumthickness ofconcretefloorpad10feet.f,Nominalthickness ofsteelliner'3/8inches.g.Netfreevolume1.24x10cubicfeet.6DESIGNPRESSUREANDTEMPERATURE 5.2.2Thereactorcontainment buildingisdesignedandshallbemaintained inaccordance withtheoriginaldesignprovisions contained inSection5.2.2oftheFSAR.COOKNUCLEARPLANT-UNIT25-1AMENDMENT NO~Pl ATTACHMENT 3TOAEP:NRC:1137 EXISTINGT/SPAGESMARKEDTOREFLECTPROPOSEDCHANGES Of~f ravepmvmps'gThecombination ofapOQER,pressurizer pressureancerbehXghescopera@'ng loopcoolancemperature (T)shallnocexceecLcheave1&itsshovninPipce2.1-1for4loopoperas'5n.
C~f~'4 f Jcj TABLE 3.3-5 Continued ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 6.Steam Flov in Tvo Steam Lines'-Hi h Coincident Vith Stcam Linc Pressure-Lov a.b.C~d.c~f.g~Safety Injection (ECCS)Reactor Trip (from SI)Feedvater Isolation Containment Isolation-Phase"h" Containment Purge and Exhaust Isolation Auxiliary Fecdvater Pumps Essential Service Vater System Steam Line Isolation<13.08/23.0~
Q~OV:"henevcrrhepo'.'n"ref'.".ed bvrhecombinacion oj-hehighescooeac'..gaveragecempera"'e and.:":"=R~AL PO4KRhasexceeCecf "heappropr''a"e pressurierpressue1'ne."einHOTSTANDBY~ichin1hour.OTlpga5l55'0c5'.+2.'.2...eBeaccorCoo'.an"5'rscem"ressuresha'nocexceed2735"s''>.COLSr.,2.'"85JP>vv'"cene:er
-he2.eac=oin';.OS.A'iD3v~~~~oL4ca..5vsrempessu":".e?.eaccorCoolan=Sys-.h.asexcee~ed.i%-s'-r.AQgssua~~'ene"er='.".e?eacrorooan=Sysrem"ressure.-.-sex"ceca"redce=';.eB.eaccorCoolan"Syscempressure..u~es.L~D.C.COOK-WIT12-1~mmeSO.120  
~4~OPslgUHACCE?TABLE OPERAi'IOH SOPs/~lOoPs)ooooPs1gP4ala4OPsp'~seeACCEPTABLE OPcRATIGH578,PRESSURE (PSIA),5.4.5.6.7.8,.ll.l.lI.QPOUTERlf'rcgtlOh 0(hO+>>IllBREAKPOIHTS(FRACTION RATEDTHERMALPOMER,T-.'VGIHDEGREESF)18402000210022502400(0.0,622.1),(1.13,587.3).(1.20,577.5)(0.0,633.8),(1.08,601.4).(1.20,586.0)(0.0,640.8),(1.06,609.8).(1.20,591.3)(0.0,650.7),(1.02,621.9),(1.20,598.9)(0.0,660.1),(0.98,633.7),(1.20,606')=REHLTHERMAL-POMER-~.=34QPAR=
FIGURE2.1-1REACTORCORESAFETYLIMITSCOOKR:CL~cPLAVZ-UNIT12-2az~vDs~vr yo.7g,,fgp152 FUHCTIAHALUNITIIIIII<2.~2-I~CuntInuredHEAC1DRTRIPSYSTEHINSTRtNENTAT IOHTRIPSETPOIIITS TRIPSETPOltlT AlLOMABLEVALUESl3.StcaaGenerator Haterlevel-Lo~-Lo~14.Steam/Feed~atcr FloeHlseatchandto~SteaaGenerator MaterLevell5.Undcrvoltage
-ReactorCoolantPumps16.Underfrequency
-ReactorCoolantPuaps>-llXofnarrarapgcInstr~ntspan-eachstcamgenerator
~0.71xlOlb/hrofsteanfin>fbat.RAIL.OTIIEfNALf'OMEHcoincident arithsteafwgenerator waterlevel>251ofnarcmrangel<<stru-eentspan-eaclisteamgenerator 2750volts-eachbus>57.5Ill-eachbus>16'lofnarrottringoInttrt&4nt',
span-eachsteaegenerator
&<0.73xlOlbs/hrofsteaefirnatRATEDTIIERHALPOHERcoincident withsteaagenerator sratcrlevel>24Kofnarrarangelnstru-ientspan-eachstelagcncrator
>2725volts-eachbus>57.4Ilz-eachbusl7.Turbine1ripaoopslgmemmrlu~F/oid01
~<~0~$.TurbineStopValve)XOPtftClosure>750pslg>11open18.Safetyinjection InliutfroaESflg.ReactorCoolantPuwpSreakerPosItlonTrlpllothppllcablcHothppllcablcIfothppllcablcHotApplicablcpQ~~'i'mQ<~atdWP~
C~f~'4 fJcjTABLE3.3-5Continued ENGINEERED SAFETYFEATURESRESPONSETIMESINITIATING SIGNALANDFUNCTIONRESPONSETIMEINSECONDS6.SteamFlovinTvoSteamLines'-Hi hCoincident VithStcamLincPressure-Lov a.b.C~d.c~f.g~SafetyInjection (ECCS)ReactorTrip(fromSI)Feedvater Isolation Containment Isolation-Phase "h"Containment PurgeandExhaustIsolation Auxiliary Fecdvater PumpsEssential ServiceVaterSystemSteamLineIsolation
<13.08/23.0~
<3.0<8.0<18.08/28.0~
<3.0<8.0<18.08/28.0~
Nothpplicable NotApplicable
Not hpplicable Not Applicable
<14.0e/48.0e>>
<14.0e/48.0e>>
<11.07.Containment Pressure--Hi h-Hiha.b.C~d.Containment SprayContainment Isolation-Phase "B"SteamLincIsolation Containment hirRecirculation Fan<45.0NotApplicable
<11.0 7.Containment Pressure--Hi h-Hi h a.b.C~d.Containment Spray Containment Isolation-Phase"B" Steam Linc Isolation Containment hir Recirculation Fan<45.0 Not Applicable
<10.0<see~b~8.SteamGenerator WaterLevel--Hi h-Hiha.TurbineTripb.Fecdvater Isolation
<10.0<see~b~8.Steam Generator Water Level--Hi h-Hi h a.Turbine Trip b.Fecdvater Isolation<2.5<11.0 9.Steam Generator Vater Level--Lov-Lov a.Motor Driven Auxiliary Feedvater Pumps b.Turbine Driven Auxiliary Fcedvatcr Pumps'60.0<60.0 10.4160 volt Emer enc Bus Loss of Volta e a.Motor Driven Auxiliary Feedvater Pumps<60.0 11.Loss of Main Feedvater Pum s a.Motor Driven Auxiliary Feedvater Pumps<60.0 12.Reactor Coolant Pum Bus Undervolta e a.Turbine Driven Auxiliary Feedvater Pumps<60.0 COOK NUCLEAR PLANT-UNIT 1 3/4 3-29 AMENDMENT NO.gg'ag  
<2.5<11.09.SteamGenerator VaterLevel--Lov-Lov a.MotorDrivenAuxiliary Feedvater Pumpsb.TurbineDrivenAuxiliary Fcedvatcr Pumps'60.0<60.010.4160voltEmerencBusLossofVoltaea.MotorDrivenAuxiliary Feedvater Pumps<60.011.LossofMainFeedvater Pumsa.MotorDrivenAuxiliary Feedvater Pumps<60.012.ReactorCoolantPumBusUndervolta ea.TurbineDrivenAuxiliary Feedvater Pumps<60.0COOKNUCLEARPLANT-UNIT13/43-29AMENDMENT NO.gg'ag  
'n TABLE 4.3-2 Continued ENGINEERED SAFETY FEATURED ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE UIREMENTS I FUNCTIONAL UNIT" 4.STEAM LINE ISOLATION CHANNEL MODE IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE CHECK CALIBRATION TEST a.Manual b.Automatic Actuation Logic c.Containment Press-ure--High-High d.Steam Flow in'wo Steam Lines--High Coincident with Tavg--Low-Low N.A.N.A.S N.A.N.A.M(1)M(2)M(3)1,2,3 1,2,3 1,2,3 1,2,3~~~Lqn~sure-Lum S TURBINE TRIP&FEEDWATER ISOLATION a.Steam Generator Water Level--High-High 6.MOTOR DRIVEN AUXILIARY FEEDWATER PUMPS a.Steam Generator Water Level--Low-Low 1,2,3 1,2,3 b.4 kv Bus Loss of Voltage c.Safety Injection d.Loss of Main Feed Pumps N.A.N.A.N.A.N.A.M(2)1,2,3 1,2,3 1,2COOK NUCLEAR PLANT-UNIT 1'I 3/4 3-33 AHENDMEvT No.f f], 129, 121, ft~I'I rt I
'n TABLE4.3-2Continued ENGINEERED SAFETYFEATUREDACTUATION SYSTEMINSTRUMENTATION SURVEILLANCE REUIREMENTS IFUNCTIONAL UNIT"4.STEAMLINEISOLATION CHANNELMODEINWHICHCHANNELCHANNELFUNCTIONAL SURVEILLANCE CHECKCALIBRATION TESTa.Manualb.Automatic Actuation Logicc.Containment Press-ure--High-High d.SteamFlowin'woSteamLines--HighCoincident withTavg--Low-Low N.A.N.A.SN.A.N.A.M(1)M(2)M(3)1,2,31,2,31,2,31,2,3~~~Lqn~sure-LumSTURBINETRIP&FEEDWATER ISOLATION a.SteamGenerator WaterLevel--High-High6.MOTORDRIVENAUXILIARY FEEDWATER PUMPSa.SteamGenerator WaterLevel--Low-Low1,2,31,2,3b.4kvBusLossofVoltagec.SafetyInjection d.LossofMainFeedPumpsN.A.N.A.N.A.N.A.M(2)1,2,31,2,31,2COOKNUCLEARPLANT-UNIT1'I3/43-33AHENDMEvT No.ff],129,121, ft~I'IrtI
~gv<<3 3+(Cow<<i aeied)V~CQTQwj 1Q'i"h"he-u."be of char&#x17d;eis OP"=HML"-less chan requ'red oy"he~'n'mr z Charne's Operable re~uiremerc.
~gv<<33+(Cow<<iaeied)V~CQTQwj1Q'i"h"he-u."beofchar&#x17d;eisOP"=HML"-
comp y with"he AC.O.rec" remencs of Specificac'on 3.4.5.1.ACT:ON 21.<<ich che n..ber of charnels OPKPJBL="less cnan required by che minimum Channe's Operable requi emenc, perform area su obeys or che monitored area with porcab1e mon'cor..g instr zencacion at'east once per dav.AC i.ON 22'ich"he number minimum Channe 1-ecu"o'ne" s o-requ''red dur''ng ace test.of channe's OP"=ML"=less chan requ'red bv che s Operable equ'remen=s, comply with che AC;ON Spec'='cat'on 3.9.9.;h's AC.TON is not che pe.=or.-.,ance of concainmenc
lesschanrequ'redoy"he~'n'mrzCharne'sOperablere~uiremerc.
'ncegraced eak AC, 2'i=h che"..mber of O?""RABL"-
compywith"heAC.O.rec"remencsofSpecificac'on 3.4.5.1.ACT:ON21.<<ichchen..berofcharnelsOPKPJBL="lesscnanrequiredbycheminimumChanne'sOperablerequiemenc,performareasuobeysorchemonitored areawithporcab1emon'cor..ginstrzencacion at'eastonceperdav.ACi.ON22'ich"henumberminimumChanne1-ecu"o'ne"so-requ''reddur''ngacetest.ofchanne'sOP"=ML"=lesschanrequ'redbvchesOperableequ'remen=s, complywithcheAC;ONSpec'='cat'on 3.9.9.;h'sAC.TONisnotchepe.=or.-.,ance ofconcainmenc
Channels less chan required by che'Ainimum Channels 0?".RA3L".
'ncegraced eakAC,2'i=hche"..mberofO?""RABL"-
Channelslesschanrequiredbyche'AinimumChannels0?".RA3L".
requiremencs:
requiremencs:
eitherrestorecheinooerab'e Channel(s) coOPKRABListacuswithin7davsofcheevenc,orprepareandsubmitaSpeciapursuanccoSoec'ficacion
either restore che inooerab'e Channel(s) co OPKRABLi stacus within 7 davs of che evenc, or prepare and submit a Specia pursuanc co Soec'ficacion
'o..eever.cou'.'..zcheacinoper'abii'='nd;he plarss'stem=oO.:-BAB'=
'o..e ever.c ou'.'..z che ac inoper'abii'='nd;he plars s'stem=o O.:-BAB'=scat s.3..echnica''
scats.3..echnica''
Spec'='cac'on Sec Noc Aoolicabie.
Spec'='cac'on SecNocAoolicabie.
1'epo r""o che Commis s ion.9.2 w;chin'4 days Eo1.lowing
1'epor""ocheCommission.9.2w;chin'4daysEo1.lowing
;on=='::en, che cause of che and--hedule fo.rescor ng che~p,h.='crs 3.0.3~3.0.4 2"3<<ich t'h e number of OP="~~BL:-
;on=='::en,checauseofcheand--hedulefo.rescorngche~p,h.='crs3.0.3~3.0.42"3<<icht'henumberofOP="~~BL:-
Chanre1.s'ess chan rea ired b" che.".'n'mum Channels OPKRA3L:-requi emencs.i.either restore the inoperable Channel(s) co OPKRABLZ status within 7 days of che evenc, or 2.prepare and submi" a Special Report co che Commission pursuanc co Specif'cac'on 6.9.2 with'n 14 days fo''o~ing che event outl'ning the action taken.che cause of che inoperability and che plans and schedule for restoring che sy'stem co OP"-BABE status.ln che evenc of an acciden" irvoiv rg radioiog cal releases inic ace che preplanned alternate method of monitoring c..e appropriate paramecer(s) wichin 72 hours.No c App 1.i cable.D.C.COOK-L".lid 1 3/4 3-37 Amendment No.94.134 k r, P f'I N sw l~
Chanre1.s
TABLE 3.3-10 Unit 1 and Common Area Fire Detection S stems Detector S stem Locatio'n Total Number of Detectors Auxiliary Building a)Elevation 38%c~~K b)Elevation 587 c)Elevation 609 d)Elevation 633 e)Elevation 650 f)Nev Fuel STGE Area g)RP Access Control&Chem Labs Ul East Main Steam Valve Enclosure Ul Main Steam Line Area El.612 (Around Containment)
'esschanreairedb"che.".'n'mum ChannelsOPKRA3L:-
Ul NESTS Valve Area El.612 Haae Plans Saa'ka (x/7>*(x/7>"<*/7>*23/OC 55/OC 41/OC 41/OC 34/OC 4/OC 25/0 28/0~],3/0~2/0 Ul 4KV Svitchgear (AB)Ul 4KV Svitchgear (CD)Ul Engr.Safety System Svitchgeaz
requiemencs.i.eitherrestoretheinoperable Channel(s) coOPKRABLZstatuswithin7daysofcheevenc,or2.prepareandsubmi"aSpecialReportcocheCommission pursuanccoSpecif'cac'on 6.9.2with'n14daysfo''o~ing cheeventoutl'ning theactiontaken.checauseofcheinoperability andcheplansandscheduleforrestoring chesy'stemcoOP"-BABEstatus.lncheevencofanacciden"irvoivrgradioiogcalreleasesinicacechepreplanned alternate methodofmonitoring c..eappropriate paramecer(s) wichin72hours.NocApp1.icable.D.C.COOK-L".lid13/43-37Amendment No.94.134 kr,Pf'INswl~
&XFMR.Rm.Ul CRD, XFMR.&Svitchgear Rm.Invartar&Bttry'.Rms.Ul Pressure.ter Heater XFMR.Rm.Ul Diesel Fuel Oil Transfer Pump Rm.Ul Diesel Generator Rm.1AB Ul Diesel Generator Rm.1CD Ul Diesel Generator Ramp Corr.U162 hEVP Vestibule 0/1 0/2 0/2 0/3 0/3 0/5 0/5 0/2 0/2 0/9 0/8 12/0 4/0 2/OC Ul Control Room Ul Svitchgear Cable Vault Ul Control Room Cable Vault Ul hux.Cable Vault 45/0 0/10~0/13 0/6 5~0/6 Ul&2 ESV Basement hzea Ul ESV Pump&MCC Rms.4/OC 9/0 C System protects area common to both Units 1 and 2*(x/y)x is number of Functi.on h (early varning fi.re detecti.on and notif ication only)instruments.
TABLE3.3-10Unit1andCommonAreaFireDetection SstemsDetectorSstemLocatio'n TotalNumberofDetectors Auxiliary Buildinga)Elevation 38%c~~Kb)Elevation 587c)Elevation 609d)Elevation 633e)Elevation 650f)NevFuelSTGEAreag)RPAccessControl&ChemLabsUlEastMainSteamValveEnclosure UlMainSteamLineAreaEl.612(AroundContainment)
y is number of Function B (actuation of fire suppression systems and early varning and notification) instruments.
UlNESTSValveAreaEl.612HaaePlansSaa'ka(x/7>*(x/7>"<*/7>*23/OC55/OC41/OC41/OC34/OC4/OC25/028/0~],3/0~2/0Ul4KVSvitchgear (AB)Ul4KVSvitchgear (CD)UlEngr.SafetySystemSvitchgeaz
circuit contains both smoke and flame detectors (~tvo circuits of five detectors each tvo circuits of 32 and 33 detectors each COOK NUCLEAR PLANT-UNIT 1 3/4 3-53 AMENDMENT NO.79,>3o  
&XFMR.Rm.UlCRD,XFMR.&Svitchgear Rm.Invartar&Bttry'.Rms.UlPressure.ter HeaterXFMR.Rm.UlDieselFuelOilTransferPumpRm.UlDieselGenerator Rm.1ABUlDieselGenerator Rm.1CDUlDieselGenerator RampCorr.U162hEVPVestibule 0/10/20/20/30/30/50/50/20/20/90/812/04/02/OCUlControlRoomUlSvitchgear CableVaultUlControlRoomCableVaultUlhux.CableVault45/00/10~0/130/65~0/6Ul&2ESVBasementhzeaUlESVPump&MCCRms.4/OC9/0CSystemprotectsareacommontobothUnits1and2*(x/y)xisnumberofFuncti.on h(earlyvarningfi.redetecti.on andnotificationonly)instruments.
.I 4 1 l-i ThBL.3-11 POST-ACCIDENT HONITORIHC INSTRUHENThTION n INSTBUHEIIY n 1.Contalnacnt Pressure R actor Coo l nt O tlat T peraturo-T T (Mlde Rang 3.Rosctox'oolant Inlet Teaperature
yisnumberofFunctionB(actuation offiresuppression systemsandearlyvarningandnotification) instruments.
-TCO~(Mide Range)M~j Reactor Coolant Pressuro-Mide Range 5.Pressurizer Mater Level&.Stoaa Linc Prcssure l.St.cua C<<nuxuxor Muxer Level-Harrow Range 8, kcl>><<11>>g Muti:r Storage Tank Mater Level Bur li: held Tunk Solution Level HIHIHUH CllhHNELS OPERhhIZ 2/Steaa Cencrator 1/Stcaa Cencrator 10.lo huxt1lary Fceduater Flou Rate 1/Steaa Generator*
circuitcontainsbothsmokeandflamedetectors
11.Reactor Coolant Systca Subcoollng Hargin Honitor 12.PORV Position Indicator-Liait Sultches***
(~tvocircuitsoffivedetectors eachtvocircuitsof32and33detectors eachCOOKNUCLEARPLANT-UNIT13/43-53AMENDMENT NO.79,>3o  
13.PORV Block Valve Position Indicator-Llalt Svitches 14.Safety Valve Position Indicator-hcoustic Honitor 15.Incore Theraocouples (Cote Exit Theraocouples) 1&.Reactor Coolant Inventory Tracking Systea (Reactor Vassal Level Indication) 17..Containaent Swap Level 1B.Contatnaent Mater Level 1*a 1/Valve 1/Valve 1/Va lve 2/Core Quadrant One Train (3 channels/Train), 1****2****Stcaa Ccnerator Mater Level Channels can be used as a substitute for the corresponding auxiliary feed+ster flou ate channel lnstruacnt Ak subcoollng aargln readout can be used as a<substitute for the subcoollng aonltor instruacnt.
.I41l-i ThBL.3-11POST-ACCIDENT HONITORIHC INSTRUHENThTION nINSTBUHEIIY n1.Contalnacnt PressureRactorCoolntOtlatTperaturo-TT(MldeRang3.Rosctox'oolant InletTeaperature
*<+hcoustlc aonitox'lng of PORV position (1 channel per throe valvos-headered discharge) can be used as s: substitute for the PORV Indicator-Llalt Sultches instruacnts.
-TCO~(MideRange)M~jReactorCoolantPressuro-MideRange5.Pressurizer MaterLevel&.StoaaLincPrcssurel.St.cuaC<<nuxuxor MuxerLevel-HarrowRange8,kcl>><<11>>g Muti:rStorageTankMaterLevelBurli:heldTunkSolutionLevelHIHIHUHCllhHNELS OPERhhIZ2/SteaaCencrator 1/StcaaCencrator 10.lohuxt1lary Fceduater FlouRate1/SteaaGenerator*
~~**The x'cqulrcaents fox these tnstruacnts will becoae offectivo after the level tx'ansaltters are aodl fled or rcplnccd und becoac operational.
11.ReactorCoolantSystcaSubcoollng HarginHonitor12.PORVPositionIndicator
The schedule for aodlf ication or rcplaceaent of the transalttcrs ls desex lbcd ln xhc Bases.I.1 2-(.&feet-}ve-be fore=s tart-xjp-fxxltoW~mefuetf~xxtxx9~r tf N~4 aH E I qf)I REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION Continued 2.With two or more block valves inoperable, within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions of ACTION a.2 or a.3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriate.
-LiaitSultches***
c.With PORVs and block valves not in the same line inoperable,*
13.PORVBlockValvePositionIndicator
within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve in each line.Apply ,.the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable.
-LlaltSvitches14.SafetyValvePositionIndicator
E d.The provisions of Specification 3.0.4 are not applicable.
-hcousticHonitor15.IncoreTheraocouples (CoteExitTheraocouples) 1&.ReactorCoolantInventory TrackingSystea(ReactorVassalLevelIndication) 17..Containaent SwapLevel1B.Contatnaent MaterLevel1*a1/Valve1/Valve1/Valve2/CoreQuadrantOneTrain(3channels/Train),
SURVEILIANCE RE UIREMENTS4.4.11.1.Each of the three PORVs shall be demonstrated OPERABLE: At least once per 31 days by performance of a CHANNEL FUNCTIONAL TEST, excluding valve operation, and b.At least once per 18 months by performance of a CHANNEL CALIBRATION.
1****2****StcaaCcnerator MaterLevelChannelscanbeusedasasubstitute forthecorresponding auxiliary feed+ster flouatechannellnstruacnt Aksubcoollng aarglnreadoutcanbeusedasa<substitute forthesubcoollng aonltorinstruacnt.
4.4.11.2 Each of the three block valves shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested when ACTION 3.4.11.a or 3.4.11.c is applied.4.4.11.3 The emergency power supply for the PORVs and block valves shall be demonstrated OPERABLE at least once per 18 months by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite.plant batteries.
*<+hcoustlcaonitox'lng ofPORVposition(1channelperthroevalvos-headereddischarge) canbeusedass:substitute forthePORVIndicator
This testing can be performed in con]unction with the requirements of Specifications
-LlaltSultchesinstruacnts.
*PORVS isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.
~~**Thex'cqulrcaents foxthesetnstruacnts willbecoaeoffectivo aftertheleveltx'ansaltters areaodlfledorrcplnccdundbecoacoperational.
COOK NUCLEAR PLANT-UNIT 1 3/4 4-36 AMENDMENT NO.)gg,)PP,144 YC C'A CONTAINMENT SYSTPIS CONTAjNMENT AiR LOCKS LIMITING CONOlTION FGR OPERATiON 3.6.1.3 Each containment air lock shall, be OPERABLE with: a.Both doors closed exc pt when the air lock is being used for normal transit entry and exit through the containment, then a least one air lock door shall be closed, and b.An overall air lock I eakage rate of<0.05 L at P, 12 psig.APPLICABiL'i
Thescheduleforaodlficationorrcplaceaent ofthetransalttcrs lsdesexlbcdlnxhcBases.I.12-(.&feet-}
(: MODES I, 2, 3 and 4.ACTION: With an air lock inooerable, restore the afr lock to OPERABLE s.atus within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SAUTOGWN within the fol lowing 30 hours.SURVE'LLANCE QEGUIR~>ENTS 4.6.1.3 b.Each containment air lock shall be denonstrated OPERABLE: 9y visual inspection af.r each ooening to verify that the seal has not been damaged.g j II wl bout a simulated pressure for=e on the door by pressurizing t.".e gap betwe n the seals to IZ psig and verifying a seal leakage o7 no great r-han 0.: L."~emp;cn co poendix"~" o=10 C.=.O.C.COOK-UNIT I 3/4 6-4 u'
ve-before=start-xjp-fxxltoW~mefuetf~xxtxx9~r tfN~4aHEIqf)I REACTORCOOLANTSYSTEMLIMITINGCONDITION FOROPERATION Continued 2.Withtwoormoreblockvalvesinoperable, within1houreither(1)restoreatotalofatleasttwoblockvalvestoOPERABLEstatus,or(2)closetheblockvalvesandremovepowerfromtheblockvalves,or(3)closetheassociated PORVsandremovepowerfromtheirassociated solenoidvalves;andapplytheportionsofACTIONa.2ora.3aboveforinoperable PORVs,relatingtoOPERATIONAL MODE,asappropriate.
CONTAINMENT SYS~S SVRVEILLAHCE REQUIRB1ENTS (Continued)
c.WithPORVsandblockvalvesnotinthesamelineinoperable,*
C.d.e.At least once per 6 months, perform an air leakage test wi hout a simulated oressure force on-.he door oer 4.6.1.3.b., then perform an air leakage tes with a simulated oressure force on the door, by pressurizing the between the seals to 12 psig and verifying a seal leakage of no greater than 0.0005 L.a'1<~~At leas once oer 6 months by conducting an overall air lock leakage test at P (12 osiq)and by verifying that the overall air lock 1 eakage kate is within i ts 1 imi t.A leas.once,per 6 months by verifying that only one door in each air lock can be opened at a time.0.C.COOK-VNIT 1 3/4 6-i k 1" f,i q II" li 4p' CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS Continued va its associated actuator, control or power circuit by-'erformance o e-cycJ.i st, above, and verification of isolation 4.6.3.1.2 Each isolation valve specified in Table 3.6-1 shall be demon-strated OPERABLE during the COLD SHUTDOWN or REHJELING MODE at least once per 18 months by: a.Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.b.Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.c.Verifying that on a Containment Purge and Exhaust isolation signal, each Purge and Exhaust valve actuates to its isolation position.4.6.3.1.3 The isolation time of each power operated or automatic valve of Table~~~~~~3.6-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.I COOK NUCLEAR PLANT-, UNIT 1 3/4 6-15 AMENDMENT NO.)gj,],gg O n n 0 0 I cr VALVE NUHBER FUNCTION C.CONTAINHENT PURGE EXllAUST Continued**TABLE 3.6-1 Conti nu<<~d ISOl&TION TIHE 1N SFCONDS 12.VCR-205 13.VCR-206 14.VCR-207*Upper Comp.Purge Air Inlet Upper Comp.Purge Air Outlet Cont.Press Relief Fan Isolation HANUAL ISOIATION VALVES ICH-ill ICH-129 ICH-250 ICH-251 1CH-260 ICH-265 ICH-305 ICH-306 ICH-311 10.ICH-321 ll.NPX 151 VI 12.PA-343 13.SF-151 14.SF-I 53 15.SF-159 16.SF-160 1/.SI-1/1 18.S I-172 RIIR to RC Cold Legs RIIR Inlet to Pumps Boron Injection~C7~/H Boron I nj ec t ion In+vs Safety Injection In+m Safet Injection I~uc on from w.v c 8HR uction from Sump RllR to RC)lot l.egs RllR to RC llot Legs Dead Weiglit Tester Containment Service Air Refueling Water Supply Refueling Water Supply Refueling Cavity Drain to Purification System Refueling Cavity Drain to Puri.fication System Safety Injection Test Line Accumulator Test Line NA NA n NA NA NA Q NA NA NA NA uI k(~l WIE PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps I and associated fl,ow paths shall be OPERABLE with:<<gc-5mven 1.Two~feedwater pumps, each capable of being powered from separate f emergency busses, and+~+wc-bin~2.Onep,feedwater pump capable of being powered from an OPERABLE steam supply system.b.At least one auxiliary feedwater flowpath in support of Unit 2 shutdown functions shall be available.
within1houreither(1)restorethevalvestoOPERABLEstatusor(2)closeandde-energize theothervalveineachline.Apply,.theportionsofACTIONa.2ora.3above,relatingtoOPERATIONAL MODE,asappropriate fortwoorthreelinesunavailable.
Ed.Theprovisions ofSpecification 3.0.4arenotapplicable.
SURVEILIANCE REUIREMENTS 4.4.11.1.
EachofthethreePORVsshallbedemonstrated OPERABLE:
Atleastonceper31daysbyperformance ofaCHANNELFUNCTIONAL TEST,excluding valveoperation, andb.Atleastonceper18monthsbyperformance ofaCHANNELCALIBRATION.
4.4.11.2Eachofthethreeblockvalvesshallbedemonstrated OPERABLEatleastonceper92daysbyoperating thevalvethroughonecompletecycleoffulltravel.Theblockvalve(s)donothavetobetestedwhenACTION3.4.11.aor3.4.11.cisapplied.4.4.11.3Theemergency powersupplyforthePORVsandblockvalvesshallbedemonstrated OPERABLEatleastonceper18monthsbyoperating thevalvesthroughacompletecycleoffulltravelwhiletheemergency busesareenergized bytheonsitedieselgenerators andonsite.plantbatteries.
Thistestingcanbeperformed incon]unction withtherequirements ofSpecifications
*PORVSisolatedtolimitRCSleakagethroughtheirseatsandtheblockvalvesshuttoisolatethisleakagearenotconsidered inoperable.
COOKNUCLEARPLANT-UNIT13/44-36AMENDMENT NO.)gg,)PP,144 YCC'A CONTAINMENT SYSTPISCONTAjNMENT AiRLOCKSLIMITINGCONOlTION FGROPERATiON 3.6.1.3Eachcontainment airlockshall,beOPERABLEwith:a.Bothdoorsclosedexcptwhentheairlockisbeingusedfornormaltransitentryandexitthroughthecontainment, thenaleastoneairlockdoorshallbeclosed,andb.AnoverallairlockIeakagerateof<0.05LatP,12psig.APPLICABiL'i
(:MODESI,2,3and4.ACTION:Withanairlockinooerable, restoretheafrlocktoOPERABLEs.atuswithin24hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSAUTOGWNwithinthefollowing30hours.SURVE'LLANCE QEGUIR~>ENTS 4.6.1.3b.Eachcontainment airlockshallbedenonstrated OPERABLE:
9yvisualinspection af.reachooeningtoverifythatthesealhasnotbeendamaged.gjIIwlboutasimulated pressurefor=eonthedoorbypressurizing t.".egapbetwenthesealstoIZpsigandverifying asealleakageo7nogreatr-han0.:L."~emp;cncopoendix"~"o=10C.=.O.C.COOK-UNIT I3/46-4 u'
CONTAINMENT SYS~SSVRVEILLAHCE REQUIRB1ENTS (Continued)
C.d.e.Atleastonceper6months,performanairleakagetestwihoutasimulated oressureforceon-.hedooroer4.6.1.3.b.,
thenperformanairleakageteswithasimulated oressureforceonthedoor,bypressurizing thebetweenthesealsto12psigandverifying asealleakageofnogreaterthan0.0005L.a'1<~~Atleasonceoer6monthsbyconducting anoverallairlockleakagetestatP(12osiq)andbyverifying thattheoverallairlock1eakagekateiswithinits1imit.Aleas.once,per6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.0.C.COOK-VNIT 13/46-i k1"f,iqII"li4p' CONTAINMENT SYSTEMSSURVEILLANCE REQUIREMENTS Continued vaitsassociated
: actuator, controlorpowercircuitby-'erformance oe-cycJ.ist,above,andverification ofisolation 4.6.3.1.2 Eachisolation valvespecified inTable3.6-1shallbedemon-stratedOPERABLEduringtheCOLDSHUTDOWNorREHJELING MODEatleastonceper18monthsby:a.Verifying thatonaPhaseAcontainment isolation testsignal,eachPhaseAisolation valveactuatestoitsisolation position.
b.Verifying thatonaPhaseBcontainment isolation testsignal,eachPhaseBisolation valveactuatestoitsisolation position.
c.Verifying thatonaContainment PurgeandExhaustisolation signal,eachPurgeandExhaustvalveactuatestoitsisolation position.
4.6.3.1.3 Theisolation timeofeachpoweroperatedorautomatic valveofTable~~~~~~3.6-1shallbedetermined tobewithinitslimitwhentestedpursuanttoSpecification 4.0.5.ICOOKNUCLEARPLANT-,UNIT13/46-15AMENDMENT NO.)gj,],gg Onn00IcrVALVENUHBERFUNCTIONC.CONTAINHENT PURGEEXllAUSTContinued
**TABLE3.6-1Continu<<~dISOl&TION TIHE1NSFCONDS12.VCR-20513.VCR-20614.VCR-207*UpperComp.PurgeAirInletUpperComp.PurgeAirOutletCont.PressReliefFanIsolation HANUALISOIATION VALVESICH-illICH-129ICH-250ICH-2511CH-260ICH-265ICH-305ICH-306ICH-31110.ICH-321ll.NPX151VI12.PA-34313.SF-15114.SF-I5315.SF-15916.SF-1601/.SI-1/118.SI-172RIIRtoRCColdLegsRIIRInlettoPumpsBoronInjection
~C7~/HBoronInjectionIn+vsSafetyInjection In+mSafetInjection I~uconfromw.vc8HRuctionfromSumpRllRtoRC)lotl.egsRllRtoRCllotLegsDeadWeiglitTesterContainment ServiceAirRefueling WaterSupplyRefueling WaterSupplyRefueling CavityDraintoPurification SystemRefueling CavityDraintoPuri.fication SystemSafetyInjection TestLineAccumulator TestLineNANAnNANANAQNANANANAuI k(~lWIE PLANTSYSTEMSAUXILIARY FEEDWATER SYSTEMLIMITINGCONDITION FOROPERATION 3.7.1.2Atleastthreeindependent steamgenerator auxiliary feedwater pumpsIandassociated fl,owpathsshallbeOPERABLEwith:<<gc-5mven1.Two~feedwater pumps,eachcapableofbeingpoweredfromseparatefemergency busses,and+~+wc-bin~2.Onep,feedwater pumpcapableofbeingpoweredfromanOPERABLEsteamsupplysystem.b.Atleastoneauxiliary feedwater flowpathinsupportofUnit2shutdownfunctions shallbeavailable.
APPLICABILITY:
APPLICABILITY:
Specification 3.7.1.2.a
Specification 3.7.1.2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 2 is in MODES 1, 2, or 3.ACTIONS: When Specification 3.7.1.2.a is applicable:
-MODES1,2,3.Specification 3.7.1.2.b
With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in'OT SHUTDOWN within the following 6 hours.b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours.C.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.When Specification 3.7.1.2.b is applicable:
-AtalltimeswhenUnit2isinMODES1,2,or3.ACTIONS:WhenSpecification 3.7.1.2.a isapplicable:
With no flow path to Unit 2 available, return at least one flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return at least one flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specification 3.0.4 are not applica'ole.
Withoneauxiliary feedwater pumpinoperable, restoretherequiredauxiliary feedwater pumpstoOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandin'OTSHUTDOWNwithinthefollowing 6hours.b.Withtwoauxiliary feedwater pumpsinoperable, beinatleastHOTSTANDBYwithin6hoursandinHOTSHUTDOWNwithinthefollowing 6hours.C.Withthreeauxiliary feedwater pumpsinoperable, immediately initiatecorrective actiontorestoreatleastoneauxiliary feedwater pumptoOPERABLEstatusassoonaspossible.
D.C.COOK-U.'i:: 1 3/4 7-5 Amendment."o.92,ic9.:.:
WhenSpecification 3.7.1.2.b isapplicable:
131 1 g j'g'H"pl 4y~A 0 I l I I REFUEL".IG OPEI~T.QNS CRANE TRAVEL-SPENT FUEL S,ORAGE POOL BUILDING LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,SCO oounds shall be prohibi ed from travel~'ver fuel assemolies in the stor ace oool.Loads carried over the soent fuel pool and the heights at wnich they may be carr..'ed over racks c"ntaining fuel shall be limited in such a way as to oreclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABiLITY:
WithnoflowpathtoUnit2available, returnatleastoneflowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit2andreturnatleastoneflowpathtoavailable statuswithinthenext60days,orhaveUnit2inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.Therequirements ofSpecification 3.0.4arenotapplica'ole.
With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.
D.C.COOK-U.'i::13/47-5Amendment
The provisions of Specification 3.0~3 are not applicable.
."o.92,ic9.:.:
SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks whicn prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.
131 1gj'g'H"pl4y~A0 IlIIREFUEL".IG OPEI~T.QNS CRANETRAVEL-SPENTFUELS,ORAGEPOOLBUILDINGLIMITINGCONDITION FOROPERATION 3.9.7Loadsinexcessof2,SCOooundsshallbeprohibiedfromtravel~'verfuelassemolies inthestoraceoool.Loadscarriedoverthesoentfuelpoolandtheheightsatwnichtheymaybecarr..'ed overracksc"ntaining fuelshallbelimitedinsuchawayastoorecludeimpactenergiesover24,240in.-lbs.,
4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be (24,240 in.'-lbs.prior to moving each load over racks containing fuel."Shared system with D.C.COOK-UNIT 2 D.C.COOK-UNIT 1~~3/4 9-8 Amendment No.jgg,ll3 l~I I Afz I II 5.0 OESIGN FEATURES 5.1 SITE EXCLUSION AREA 5.1.1 The exclusion area shall.be as shcwn fn Ffgure 5.1-1.LQM POPULATION ZONE 5.1.2 The lcw population zone shall be as shown in Figure 5.1-2.Site Soundarv Fcr Gaseous and Liquid Ef'uents S.L.3 Qe s1aa bau~ndarnd,far gaseaus and IIqusd erfluena sha11 be shown fn F f gure S-.-i=3.-;T-
iftheloadsaredroppedfromthecrane.APPLICABiLITY:
 
Withfuelassemblies inthestoragepool.ACTION:Withtherequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.
===5.2 CONTAINMENT===
Theprovisions ofSpecification 3.0~3arenotapplicable.
CONFIGURATION 5.2.1 The reacto~containment building fs a steel lined, reinforced concrete building of cylindrical shape, with a deme roof and having the following design features: a.Nominal fnside diameter*115 feet.b.Nominal fnside height~160 feet.>>c.Minimum thickness of concrete walls 3'6".d.Minimum thickness of concrete roof*2'6".e.Minimum thickness of concrete floor pad~10 feet.f.Nominal thickness of steel liner, side and dome 3/8 fnches.g.Nominal thickness h.Net free volume~of steel liner, bottom~1/4 inch.1.24 x 10 cubic feet.'crom graae c ev.a to inside of dome.0.C.COOK-UNIT 1 5-1 Amendment No.69 0 0 ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable position, except for (1)the Radiation Protection Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and (2)the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.
SURVEILLANCE REUIREMENTS 4.9.7.1Craneinterlocks whicnpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.
6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Coordinator and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N181-1971 and ggpandkx"A" of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COMMITTEE PNSRC FUNCTION 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to nuclear safety.D.C.COOK-UNIT 1 6-5 Amendment No.49~~33 4'f~1 tj!r!5 pk 0 ADMINISTRATIVE CONTROLS PZSPONSZBILZTZES 6.5.1.6 a.The PNSRC shall be responsible or: Revi.ew of 1)all proc es reau'ed by Soeci'ation 6.8 and cnanges thereto, 2)any other proposed procedures or changes thereto as determined by the P'ant Manager to affect nuclear safety.b.Review of all proposed tests and experiments that affect nuclear safety.C~Review of all proposed charges to Append'x"A" Technical Specifications.
4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobe(24,240in.'-lbs.
Review of all proposed changes or modifications to plant systems or ecuipment that affect nuc'ear safetv.e.Invest'gat'on of all violat'ors of the Technical Specifications including the preparation and forwarding of reports covering evaluat'on and recommendat'ons to prevent recurrence to the Chairman of the NSDRC.Review of all REPORTABLE EVENTS.Rev'ew of fac'lity operations to detect potent'al safety hazards.Performance o special reviews, inves.'cations of analyses and reports thereon as recuested by the Chairman of the NSDRC.Review of the Plant Security Plan" and implement'ng procedures and shall ubmit recommended changes to the Chairman of 0he NSDRC.J~Review o the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.k.Rev'ew of every unplanned crsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation and recomme..dat'ons to prevent recurrence to the NSDRC.Review of changes t'he PROCESS CON ROL PROGB~l, OFESZ=E DOSE CALCULATZCN:ANNUAL, and radwaste treatment s"stem.D.C.COOK-UNIT 1 6-7 Amendment No.87 Docks t No.316 Page 5 of 11 (1)Deleted by Amendment 63.(m)Deleted by Amendment 19.(n)Deleted by Amendment 28.(o)Fire Protection Amendment No.12 Tha li.censee may proceed rt.th and is required to complete the modifications identified in Table 1 of tha Fi.re Protection Safety Evaluation Report for the Donald C.Cook Nuclear Plant dated June 4, 1979.These modifi.cati.ons shill be completed in accordance rith the dates contained in Table 1 of that SER or Supplements thereto, Administrative controls for fire protection as described in the licensee's submittils dated January 31, 1977 and October 27, 1977 shall be implemented ind maintained.
priortomovingeachloadoverrackscontaining fuel."SharedsystemwithD.C.COOK-UNIT2D.C.COOK-UNIT1~~3/49-8Amendment No.jgg,ll3 l~IIAfzIII 5.0OESIGNFEATURES5.1SITEEXCLUSION AREA5.1.1Theexclusion areashall.beasshcwnfnFfgure5.1-1.LQMPOPULATION ZONE5.1.2Thelcwpopulation zoneshallbeasshowninFigure5.1-2.SiteSoundarvFcrGaseousandLiquidEf'uentsS.L.3Qes1aabau~ndarnd,far gaseausandIIqusderfluenasha11beshownfnFfgureS-.-i=3.-;T-5.2CONTAINMENT CONFIGURATION 5.2.1Thereacto~containment buildingfsasteellined,reinforced concretebuildingofcylindrical shape,withademeroofandhavingthefollowing designfeatures:
Amendment No'4, 121 (p)Deleted by Amandmant/g l 0 A,j1 li a"<<J I 0 JQ~I P c U DE."INITIONS SOLIDIFICATION
a.Nominalfnsidediameter*115feet.b.Nominalfnsideheight~160feet.>>c.Minimumthickness ofconcretewalls3'6".d.Minimumthickness ofconcreteroof*2'6".e.Minimumthickness ofconcretefloorpad~10feet.f.Nominalthickness ofsteelliner,sideanddome3/8fnches.g.Nominalthickness h.Netfreevolume~ofsteelliner,bottom~1/4inch.1.24x10cubicfeet.'cromgraaecev.atoinsideofdome.0.C.COOK-UNIT 15-1Amendment No.69 00 ADMINISTRATIVE CONTROLS6.3FACILITYSTAFFUALIFICATIONS 6.3.1Eachmemberofthefacilitystaffshallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 forcomparable
]..29 SOLTDIFTCATEON shall be the conversion of radioactive liquid, resiny and sludge wastes from liquid syscems into a form that meets shipping and burial site requirements.
: position, exceptfor(1)theRadiation Protection Supervisor whoshallmeetorexceedthequalifications ofRegulatory Guide1.8,September 1975,and(2)theShiftTechnical Advisorwhoshallhaveabachelor's degreeorequivalent inascientific orengineering discipline withspecifictraininginplantdesign,andresponseandanalysisoftheplantfortransients andaccidents.
OFFSITE DOSE CALCULATION HAiVUAL (ODCA)~.30 The OFFSITE DOSE CALCULATION
6.4TRAINING6.4.1Aretraining andreplacement trainingprogramforthefacilitystaffshallbemaintained underthedirection oftheTrainingCoordinator andshallmeetorexceedtherequirements andrecommendations ofSection5.5ofANSIN181-1971 andggpandkx"A"of10CFRPart55.6.5REVIEWANDAUDIT6.5.1PLANTNUCLEARSAFETYREVIEWCOMMITTEE PNSRCFUNCTION6.5.1.1ThePNSRCshallfunctiontoadvisethePlantManageronallmattersrelatedtonuclearsafety.D.C.COOK-UNIT16-5Amendment No.49~~33 4'f~1tj!r!5pk0 ADMINISTRATIVE CONTROLSPZSPONSZBILZTZES 6.5.1.6a.ThePNSRCshallberesponsible or:Revi.ewof1)allprocesreau'edbySoeci'ation6.8andcnangesthereto,2)anyotherproposedprocedures orchangestheretoasdetermined bytheP'antManagertoaffectnuclearsafety.b.Reviewofallproposedtestsandexperiments thataffectnuclearsafety.C~ReviewofallproposedchargestoAppend'x"A"Technical Specifications.
<<VUAL shall contain the methodology and parameters used in the calculation of offsite doses due to radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm/trip secpoints and the conduct of environmental radiological monitoring program.GASEOUS RADVASTE TREATMENT SYSTEM'.31 A GASEOUS RADVASTE TREAT~fENT SYSTE.'i is any system designed and installed to reduce radioactive gaseous effluents by.collecting primary coolanc system off-gases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment.
Reviewofallproposedchangesormodifications toplantsystemsorecuipment thataffectnuc'earsafetv.e.Invest'gat'on ofallviolat'ors oftheTechnical Specifications including thepreparation andforwarding ofreportscoveringevaluat'on andrecommendat'ons topreventrecurrence totheChairmanoftheNSDRC.ReviewofallREPORTABLE EVENTS.Rev'ewoffac'lityoperations todetectpotent'al safetyhazards.Performance ospecialreviews,inves.'cations ofanalysesandreportsthereonasrecuested bytheChairmanoftheNSDRC.ReviewofthePlantSecurityPlan"andimplement'ng procedures andshallubmitrecommended changestotheChairmanof0heNSDRC.J~ReviewotheEmergency Planandimplementing procedures andshallsubmitrecommended changestotheChairmanoftheNSDRC.k.Rev'ewofeveryunplanned crsitereleaseofradioactive materialtotheenvironsincluding thepreparation andforwarding ofreportscoveringevaluation andrecomme..dat'ons topreventrecurrence totheNSDRC.Reviewofchangest'hePROCESSCONROLPROGB~l,OFESZ=EDOSECALCULATZCN:ANNUAL, andradwastetreatment s"stem.D.C.COOK-UNIT16-7Amendment No.87 DockstNo.316Page5of11(1)DeletedbyAmendment 63.(m)DeletedbyAmendment 19.(n)DeletedbyAmendment 28.(o)FireProtection Amendment No.12Thali.censee mayproceedrt.thandisrequiredtocompletethemodifications identified inTable1ofthaFi.reProtection SafetyEvaluation ReportfortheDonaldC.CookNuclearPlantdatedJune4,1979.Thesemodifi.cati.ons shillbecompleted inaccordance riththedatescontained inTable1ofthatSERorSupplements thereto,Administrative controlsforfireprotection asdescribed inthelicensee's submittils datedJanuary31,1977andOctober27,1977shallbeimplemented indmaintained.
VEVTELATION EAST TREATMENT SYSTci 1.32 A VENTELATEON EXHAUST TREATAEiVT SYSTEN is any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate form in effluents by pa'ssing ventilat on or vent exhaust gases through charcoal absorbers and/or HEPA filters fo" the purpose of removing iodines or particulategrom the gaseous exhaust scream prior to the release to the environment.
Amendment No'4,121(p)DeletedbyAmandmant
Such a system is not considered to have any effect on noble gas effluents.
/gl 0A,j1lia"<<JI0JQ~IPcU DE."INITIONS SOLIDIFICATION
Engineered Safety Feature (ESF)atmospher'c cleanup systems are not considered to be VENTILATION EXHAUST TREAT'fENT SYSTEM components.
]..29SOLTDIFTCATEON shallbetheconversion ofradioactive liquid,resinyandsludgewastesfromliquidsyscemsintoaformthatmeetsshippingandburialsiterequirements.
PURGE-PURGING 1.33 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain tempez'ature, pressuze, humidity, concentration or ocher operating condicion, in such a manner that replacement air or gas is required to purify the confinement.
OFFSITEDOSECALCULATION HAiVUAL(ODCA)~.30TheOFFSITEDOSECALCULATION
VEHTLVC 1.34 VENTiNG is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidicv, concentration or ocher operating condition, in such a manner that replacement air or gas is not provided or required during VENTTVG.Vent, used in system names, does not imply a VENTING process.D.C.COOK-UNIT 2 1-7 AMENDMENT itO.51 f}\" 4 2.1.1 Tne coabination of~4" PO4:-R, pzessuri"er pressu=e, and the highest operating loop coolant eaperatuze (T)shall not exceed the Limits avg sholem in Figure 2.1-1 for 4 loop operat'on.
<<VUALshallcontainthemethodology andparameters usedinthecalculation ofoffsitedosesduetoradioactive gaseousandliquideffluents, inthecalculation ofgaseousandliquideffluentmonitoring alarm/trip secpoints andtheconductofenvironmental radiological monitoring program.GASEOUSRADVASTETREATMENT SYSTEM'.31 AGASEOUSRADVASTETREAT~fENT SYSTE.'iisanysystemdesignedandinstalled toreduceradioactive gaseouseffluents by.collecting primarycoolancsystemoff-gases fromtheprimarysystemandproviding fordelayorholdupforthepurposeofreducingthetotalradioactivity priortoreleasetotheenvironment.
BAHTS: t"henevez the point defined by the coabfnation of the hiehest operating loop average tecrperature and Td"=KM.PO4=%has exceeded the appropriate pressurizer pressure line, be in HOT STANDBY vithin L hour.2.1.2 The Reactor CooLan" Systen pressu"e shall not exceed 2735 psig.MODES 1 and 2~whenevez the Reactor Coolant System pressuze has exceede'd 2735 ps', be in HOT Sd%)BY vith the Reactor Coolant System pressu-e vithin its L&t within 1 hou".MODES 3, 4 a..d 5 whenever the Reactor Coolant System pressure has exceeded 2735 psig, reduce the Reactor Coolant System pressu"e to vf,thin'ts Limit vithin 5 adnutes.D.C.COOK-POT 2 2-1 NO.82 1 0 11 TABI"-2.2-1 Continuad)
VEVTELATION EASTTREATMENT SYSTci1.32AVENTELATEON EXHAUSTTREATAEiVT SYSTENisanysystemdesignedandinstalled toreducegaseousradioiodine orradioactive materialinparticulate formineffluents bypa'ssingventilatonorventexhaustgasesthroughcharcoalabsorbers and/orHEPAfiltersfo"thepurposeofremovingiodinesorparticulategrom thegaseousexhaustscreampriortothereleasetotheenvironment.
, ACTOR TRIP SYSTEM INSTRU.iATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 13.Stcam Generator Water Level-Lov-Lov 14.Steam/Feedvater Flov Mismatch and Lov Stean Cenerator Water Level 15.Unde rvo1 tage Reactor Coolant Pumps 16.Underfrequency-Reactor Coolant Pumps Greater than or equal to 21i of narrov range instrument span-each steam generator Less6than or equal to 1.47 x 10 lbs/hr of stean ilov at RATED THERMAL POWER coincident vith stean generator vater level greater than or equal to 254 of narrov range instrument span-each acean generator Greater than or equal to 2905 volts-each bus Creacer chan or equal to 57.5 Hr,-each bus Creater than or equal to 19.2%of narrov range instrument span-each stean generator Less6than or equal to 1.56 I x 10 lbs/hr of steam flov ac RATED THERKhL POWER coincident vith stean generator vater level greacer than or equal to 24%of narrov range instrument span-each-stean generator Creater than or equal to t 2870 volts-each bus Greater than or equal co I 57.4 Hx-each bus 17.Turbine Trip Pl<"~.~/h.Lov 2z4p Syagae Pressure B.Turbine Stop Valve Closure Creater than or equal to 58 psig Creacer than or equal to 1%open Creacer than or equal to 57 psig Creacer than or equal co lt open 1&.Safety Infection Not Applicable Inpuc from ESF 19.Reactor Coolant Pump Not Applicable Breaker Position Trip Noc hpplicable Not hpplicable COOK NUC~~PLA&#xc3;E-UNIT 2 2-6 AMENDNBPZ NO.82~134 4~4~
Suchasystemisnotconsidered tohaveanyeffectonnoblegaseffluents.
3.4.2 PO~DISTRISUTION LI.-ITS AXIAL FLUX DIFF>~rWCE LIMNI INC CONDITION FOR OPERA ION 3.2.1 The indicated A)(IAL FLLX DIFFER-""'tCE (AFO)shall.be maintained vithin che target band about a cargec f'ux d'fference.
Engineered SafetyFeature(ESF)atmospher'c cleanupsystemsarenotconsidered tobeVENTILATION EXHAUSTTREAT'fENT SYSTEMcomponents.
The target~is specifi~d'n he COLR.APPLICASILITY:
PURGE-PURGING 1.33PURGEorPURGINGisthecontrolled processofdischarging airorgasfromaconfinement tomaintaintempez'ature,
RODE 1 above 50%RATED THHviAL POt'ER*AC.:Pl: 'ich the indicated AXIAL F'G(DIFFER~ICE oucside of che target band about the cargec Lux dif erence and vich THH~AL POt'ER: Above 90%or 0.9 x APL (vh'chever is Less)of RATH)THD<~L PO'ER, vichin 15 minutes: a)E'ther restore the indicated AFD to within the target band Limits, or b)Reduce THER."aL PO"ER to less chan 90%or 0.9 x APL (vh'chever is Less)of RATED TH~R~iAL POVER.Bet-een 504 and 904 or 0.9 x AP'whichever is Less)af RATED i~~R<<La PO~C,R;a)": 'ER C?E.KTION may conti.": e provided:.ne'.'ndi cared AFO has.".ot been outside of the target band for mare"'.".an 1 hour penalcy deviation c..u1ac've d'."""Le zrevious 24 hours, and 2)The indicated AFO is-"=.".n che Lim'cs speci" ed in the COLS.Othe.ise, red ce THEB."iAL?O'NER to less chan 50%of RATED THER."AL?Ql'ER with&#x17d;30 minutes and reduce the Pove.Range Neutron FLux-High Tr'.'p Setpoints"o Less than or equaL co 553 of RATED THERMAL PC'ER vith'n the next 4 hours.Su-.:eilLance test'ng of the Paver Range'ieucron Flux Channels mav be per"or ed"rsuant to Spec&#x17d;'cation 4.3.L.L.L provided the'ind'ca"ed AFO is ma'ncained the Lim't specif'ed'n:he COL%.A cacal o=La hours operat'on may be acc-ulated vich:he AFO outside o==he target band during ch's testing vithouc penalty dev'c'n.~See Specia;.est Except'on 3.'0.2 C OK.'."~C.D9.P~~iT-'IT 2 3/4 2-L AvENO~ENT NO.44,107,';
: pressuze, humidity, concentration orocheroperating condicion, insuchamannerthatreplacement airorgasisrequiredtopurifytheconfinement.
VEHTLVC1.34VENTiNGisthecontrolled processofdischarging airorgasfromaconfinement tomaintaintemperature,
: pressure, humidicv, concentration orocheroperating condition, insuchamannerthatreplacement airorgasisnotprovidedorrequiredduringVENTTVG.Vent,usedinsystemnames,doesnotimplyaVENTINGprocess.D.C.COOK-UNIT21-7AMENDMENT itO.51 f}\"4 2.1.1Tnecoabination of~4"PO4:-R,pzessuri"er pressu=e, andthehighestoperating loopcoolanteaperatuze (T)shallnotexceedtheLimitsavgsholeminFigure2.1-1for4loopoperat'on.
BAHTS:t"henevez thepointdefinedbythecoabfnation ofthehiehestoperating loopaveragetecrperature andTd"=KM.PO4=%hasexceededtheappropriate pressurizer pressureline,beinHOTSTANDBYvithinLhour.2.1.2TheReactorCooLan"Systenpressu"eshallnotexceed2735psig.MODES1and2~wheneveztheReactorCoolantSystempressuzehasexceede'd 2735ps',beinHOTSd%)BYviththeReactorCoolantSystempressu-evithinitsL&twithin1hou".MODES3,4a..d5whenevertheReactorCoolantSystempressurehasexceeded2735psig,reducetheReactorCoolantSystempressu"etovf,thin'tsLimitvithin5adnutes.D.C.COOK-POT22-1NO.82 1011 TABI"-2.2-1Continuad)
,ACTORTRIPSYSTEMINSTRU.iATIONTRIPSETPOINTS FUNCTIONAL UNITTRIPSETPOINTALLOWABLE VALUES13.StcamGenerator WaterLevel-Lov-Lov 14.Steam/Feedvater FlovMismatchandLovSteanCenerator WaterLevel15.Undervo1tageReactorCoolantPumps16.Underfrequency-ReactorCoolantPumpsGreaterthanorequalto21iofnarrovrangeinstrument span-eachsteamgenerator Less6than orequalto1.47x10lbs/hrofsteanilovatRATEDTHERMALPOWERcoincident vithsteangenerator vaterlevelgreaterthanorequalto254ofnarrovrangeinstrument span-eachaceangenerator Greaterthanorequalto2905volts-eachbusCreacerchanorequalto57.5Hr,-eachbusCreaterthanorequalto19.2%ofnarrovrangeinstrument span-eachsteangenerator Less6than orequalto1.56Ix10lbs/hrofsteamflovacRATEDTHERKhLPOWERcoincident vithsteangenerator vaterlevelgreacerthanorequalto24%ofnarrovrangeinstrument span-each-steangenerator Createrthanorequaltot2870volts-eachbusGreaterthanorequalcoI57.4Hx-eachbus17.Turbine TripPl<"~.~/h.Lov2z4pSyagaePressureB.TurbineStopValveClosureCreaterthanorequalto58psigCreacerthanorequalto1%openCreacerthanorequalto57psigCreacerthanorequalcoltopen1&.Safety Infection NotApplicable InpucfromESF19.Reactor CoolantPumpNotApplicable BreakerPositionTripNochpplicable Nothpplicable COOKNUC~~PLA&#xc3;E-UNIT22-6AMENDNBPZ NO.82~134 4~4~
3.4.2PO~DISTRISUTION LI.-ITSAXIALFLUXDIFF>~rWCE LIMNIINCCONDITION FOROPERAION3.2.1Theindicated A)(IALFLLXDIFFER-""'tCE (AFO)shall.bemaintained vithinchetargetbandaboutacargecf'uxd'fference.
Thetarget~isspecifi~d
'nheCOLR.APPLICASILITY:
RODE1above50%RATEDTHHviALPOt'ER*AC.:Pl:'ichtheindicated AXIALF'G(DIFFER~ICE oucsideofchetargetbandaboutthecargecLuxdiferenceandvichTHH~ALPOt'ER:Above90%or0.9xAPL(vh'chever isLess)ofRATH)THD<~LPO'ER,vichin15minutes:a)E'therrestoretheindicated AFDtowithinthetargetbandLimits,orb)ReduceTHER."aLPO"ERtolesschan90%or0.9xAPL(vh'chever isLess)ofRATEDTH~R~iALPOVER.Bet-een504and904or0.9xAP'whichever isLess)afRATEDi~~R<<LaPO~C,R;a)":'ERC?E.KTIONmayconti.":eprovided:
.ne'.'ndicaredAFOhas.".otbeenoutsideofthetargetbandformare"'.".an1hourpenalcydeviation c..u1ac'ved'."""Lezrevious24hours,and2)Theindicated AFOis-"=.".ncheLim'csspeci"edintheCOLS.Othe.ise,redceTHEB."iAL
?O'NERtolesschan50%ofRATEDTHER."AL?Ql'ERwith&#x17d;30minutesandreducethePove.RangeNeutronFLux-High Tr'.'pSetpoints "oLessthanorequaLco553ofRATEDTHERMALPC'ERvith'nthenext4hours.Su-.:eilLance test'ngofthePaverRange'ieucronFluxChannelsmavbeper"ored"rsuanttoSpec&#x17d;'cation 4.3.L.L.L providedthe'ind'ca"ed AFOisma'ncained theLim'tspecif'ed
'n:heCOL%.Acacalo=Lahoursoperat'on maybeacc-ulatedvich:heAFOoutsideo==hetargetbandduringch'stestingvithoucpenaltydev'c'n.~SeeSpecia;.estExcept'on 3.'0.2COK.'."~C.D9.P~~iT-'IT23/42-LAvENO~ENT NO.44,107,';
"
"
0yI pnOa~lRTfVO]'lJ}f~C" Og)Qjt)(~l.)fanualReactorTripTOTALNO.2.PoserRange,NeutronFlux43.PouarRange,NeutronFlux4)llghPoaitivoRate4.,PowerRange)NeutronFlux,4))igh)fegativa Rata5.Intermediate Range,}loutronFluxC))ANHELS X9'HG3'2MINIMUMC))ANNELS WORMS~APPLlCABLE
0 y I p n O a~l RTf VO]'lJ}f~C" Og)Qj t)(~l.)fanual Reactor Trip TOTAL NO.2.Poser Range, Neutron Flux 4 3.Pouar Range, NeutronFlux 4)llgh Poaitivo Rate 4.,Power Range)Neutron Flux, 4))igh)fegativa Rata 5.Intermediate Range,}loutron Flux C))ANHELS X9'HG3'2 MINIMUM C))ANNELS WORMS~APPLlCABLE
~OQP.S1,2and*1,2and~1,21121,2and,~CAld6.SourceRange,NeutronFluxA.StartupB.S}nftdoun 7.Ovortomporature ATFourLoopOperation a.Ovorpouar hTFourLoopOperation 2&#xb9;and*3,4and51)21,2 TABLE3.3-1Continued
~OQP.S 1, 2 and*1, 2 and~1, 2 11 2 1, 2 and,~CA ld 6.Source Range, Neutron Flux A.Startup B.S}nftdoun 7.Ovortomporature AT Four Loop Operation a.Ovorpouar hT Four Loop Operation 2&#xb9;and*3, 4 and 5 1)2 1, 2 TABLE 3.3-1 Continued (-REACTOR TRIP SYSTEM INSTRUMENTATION n n o O Iq I Q UNCTIONAL UN T 9.Pressurizer Pressure-Low 10.Pressurizer Pressure--High ll.Pressurizer Water Level-High TOTAL NO-OF CHANNELS MINIMUM CHANNELS CHANNELS TO TRIP OPERABLE 2 2 APPLICABLE MODES 1, 2 1, 2 1, 2 ACTION 12.Loss of Flow-Single Loop (Above P-8)13.Loss of Flow-Two Loops (Above P-7 and below P-8)3/loop 3/loop 2/loop in 2/loop in any opera-each opera-ting loop ting loop 2/loop in 2/loop in 1 two opera-each opera-ting loops ting loop 14.Steam Generator Water Level-Low-Low 15.Steam/Feedwater Flow Mismatch and Low Steam Generator Water Level 3/loop 2/loop-level and 2/loop-flow mismatch in same loop 2/loop in any opera-ting loop 1/loop-level coincident with 1/loop-flow mismatch in same loop 2/loop in.1, 2 each opera-ting loop 1/loop-level 1, 2 and 2/loop-flow mismatch or 2/loop-level and 1/loop-flow mismatch 0 l 0 O 0 n FUNCTIOHAL UHIT P4 M 16.Undervoltage-Reactor Coolant Pumps TAliLE 3~3-1 Concinu<I)TOTAL NO.OF CllAHHELS Cl lANNE LS TO TRIP MIHIMUM CltANNELS OP ERA BI.E 4-1/bus REACTOR TRIP SYSTEM INSTRUMENTATION APPLICABLE MODES ACTION 11.Underfrequency-Reactor Coolant Pumps 4-1/bus lr>.Tuel>i>>u Trip A.Lou Fluid Oil Pressure B.Turbine Stop Valve Closure 19.Safety Injection Input from ESF 1, 2 20.Reactor Coolant Pump B reake r Position Trip Above P-/21.Reactor Trip Breakers I/1>reak<<r 1/breaker per operat-ing loop 1, 2, 3*4*5*1, 13.14 22.Automatic Trip Logic 0
(-REACTORTRIPSYSTEMINSTRUMENTATION nnoOIqIQUNCTIONAL UNT9.Pressurizer Pressure-Low 10.Pressurizer Pressure--High ll.Pressurizer WaterLevel-HighTOTALNO-OFCHANNELSMINIMUMCHANNELSCHANNELSTOTRIPOPERABLE22APPLICABLE MODES1,21,21,2ACTION12.LossofFlow-SingleLoop(AboveP-8)13.LossofFlow-TwoLoops(AboveP-7andbelowP-8)3/loop3/loop2/loopin2/loopinanyopera-eachopera-tinglooptingloop2/loopin2/loopin1twoopera-eachopera-tingloopstingloop14.SteamGenerator WaterLevel-Low-Low15.Steam/Feedwater FlowMismatchandLowSteamGenerator WaterLevel3/loop2/loop-level and2/loop-flow mismatchinsameloop2/loopinanyopera-tingloop1/loop-level coincident with1/loop-flow mismatchinsameloop2/loopin.1,2eachopera-tingloop1/loop-level 1,2and2/loop-flow mismatchor2/loop-level and1/loop-flow mismatch0 l0 O0nFUNCTIOHAL UHITP4M16.Undervoltage-Reactor CoolantPumpsTAliLE3~3-1Concinu<I)TOTALNO.OFCllAHHELS CllANNELSTOTRIPMIHIMUMCltANNELS OPERABI.E4-1/busREACTORTRIPSYSTEMINSTRUMENTATION APPLICABLE MODESACTION11.Underfrequency-Reactor CoolantPumps4-1/buslr>.Tuel>i>>uTripA.LouFluidOilPressureB.TurbineStopValveClosure19.SafetyInjection InputfromESF1,220.ReactorCoolantPumpBreakerPositionTripAboveP-/21.ReactorTripBreakersI/1>reak<<r1/breaker peroperat-ingloop1,2,3*4*5*1,13.1422.Automatic TripLogic 0
TABLE 3.3-6 (Cont nued)TABLE VOTgTION CTION 20-Vi.th the number of channels OPERABLE less than required by the Ainimum Channels Operable requirement,, comply with the ACTION requirements of Spec''f ication 3.4.6.1.ACTION 21 Pith the number of channels OPERABLE less than required by the Ainimum Channels Operable requirement, perform area surveys of the monitored area with portable monitoring instrwentation at least once per day.ACTION 22 Pith the number of channels OPERABLE less than required by the Ainimum Channels Operable requirements, comply with the ACTION requirements of Spec''f'cation 3.9.9.This ACTION is not requ'red during the performance of containment integrated leak rate test.ACTION 22A-Pith the number oi OPERABLE Channels less than required by the Ainimum Channels OPERABLE requirements:
TABLE3.3-6(Contnued)TABLEVOTgTIONCTION20-Vi.ththenumberofchannelsOPERABLElessthanrequiredbytheAinimumChannelsOperablerequirement,,
e'ther restore the inoperable Channel(s) to OP qABLE status within 7 days of the event, or 2.prepare and submit a Special Repor" to the Commission pursuan" to Specification 6.9.2"ithin 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedu'e for rqstoring the system to OPERABLE status.g-[~5 3.Technical Specificat'on Sect'ons 3.0.3, 3.0.4 Not Applicable.
complywiththeACTIONrequirements ofSpec''fication3.4.6.1.ACTION21PiththenumberofchannelsOPERABLElessthanrequiredbytheAinimumChannelsOperablerequirement, performareasurveysofthemonitored areawithportablemonitoring instrwentation atleastonceperday.ACTION22PiththenumberofchannelsOPERABLElessthanrequiredbytheAinimumChannelsOperablerequirements, complywiththeACTIONrequirements ofSpec''f'cation 3.9.9.ThisACTIONisnotrequ'redduringtheperformance ofcontainment integrated leakratetest.ACTION22A-PiththenumberoiOPERABLEChannelslessthanrequiredbytheAinimumChannelsOPERABLErequirements:
ACTION 22B-'ith the number of OPERABLE Channels less than required by the Ainimum Channels OPERABLE requ'rements.
e'therrestoretheinoperable Channel(s) toOPqABLEstatuswithin7daysoftheevent,or2.prepareandsubmitaSpecialRepor"totheCommission pursuan"toSpecification 6.9.2"ithin14daysfollowing theeventoutlining theactiontaken,thecauseoftheinoperability andtheplansandschedu'eforrqstoring thesystemtoOPERABLEstatus.g-[~53.Technical Specificat'on Sect'ons3.0.3,3.0.4NotApplicable.
l.either restore the inoperable Channel(s) to OPERABLE status within 7 days of the even", or 2.prepare and submit a Special Repor" to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.In the event of an accident involving radiological releases initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours.Not Applicable.
ACTION22B-'iththenumberofOPERABLEChannelslessthanrequiredbytheAinimumChannelsOPERABLErequ'rements.
D.C.COOK-UNIT 2 3/4 3-36 Amendment No.80,119 t IA gJ i~'P l 4''I E TABLE 3.3-11 Unit 2 and Common Area Fire Detection S stems Detection S stem Location Total Number of Detectors Auxiliary Building a),",Elevation 587 b)(Elewatfon 609 c},"Elevation 633 d)evat on.e Elevation 650 f)Nev Fuel STGE brea Heat (x/y)%'lsae
l.eitherrestoretheinoperable Channel(s) toOPERABLEstatuswithin7daysoftheeven",or2.prepareandsubmitaSpecialRepor"totheCommission pursuanttoSpecification 6.9.2within14daysfollowing theeventoutlining theactiontaken,thecauseoftheinoperability andtheplansandscheduleforrestoring thesystemtoOPERABLEstatus.3.Intheeventofanaccidentinvolving radiological releasesinitiatethepreplanned alternate methodofmonitoring theappropriate parameter(s) within72hours.NotApplicable.
(>/7)*Smoke (x/y)*55/OC 41/OC 41/OC 23/OC~34/OC 4/OC U2 East Main Steam Valve Enclosure U2 Main Steam Line brea El.612 (Around Containment)
D.C.COOK-UNIT23/43-36Amendment No.80,119 tIAgJi~'Pl4''IE TABLE3.3-11Unit2andCommonAreaFireDetection SstemsDetection SstemLocationTotalNumberofDetectors Auxiliary Buildinga),",Elevation 587b)(Elewatfon 609c},"Elevation 633d)evaton.eElevation 650f)NevFuelSTGEbreaHeat(x/y)%'lsae
U2 NESTS Valve Area El.612 28/0~]3/Pk+2/0 U2 4KV Svitchgear (AB)U2 4KV Svitchgear (CD)U2 Engr.Safety System Svi.tchgear 6 XFMR.Rm.U2 CRD, XFMR 6 Svt.tchgear Rm.Inverter&AB Bttry.Rms.0/3 0/3 0/5 0/5 0/2 0/2 0/14 0/17 U2 Pressurixer Heater XFMR.Rm.U2 Diesel Fuel Oil XFMR.Rm.U2 Diesel Generator Rm.2AB U2 Di,esel Generator Rm.2CD U2 Di.esel Generator Ramp Corr.Ul&2 AFVP Vestibule 0/1 0/2 0/2 12/0 4/0 2/OC U2 Control Room U2 Svitchgear Cable Vault U2 Control Rm.Cable Vault U2 Aux.Cable Vault 42/0 0/10~0/13 P/76~0/6 Ul&2 ESV Basement Area U2 ESV Pump&MCC Rms.4/OC 9/0 C System protects area common to both Units 1 and 2*(x/y)x is number of Functi.on h (early varning fire detecti.on and notification only)instruments.
(>/7)*Smoke(x/y)*55/OC41/OC41/OC23/OC~34/OC4/OCU2EastMainSteamValveEnclosure U2MainSteamLinebreaEl.612(AroundContainment)
y is number of Function B (actuation of fire suppression systems and early varning and notifi.cation) instruments.
U2NESTSValveAreaEl.61228/0~]3/Pk+2/0U24KVSvitchgear (AB)U24KVSvitchgear (CD)U2Engr.SafetySystemSvi.tchgear 6XFMR.Rm.U2CRD,XFMR6Svt.tchgear Rm.Inverter&ABBttry.Rms.0/30/30/50/50/20/20/140/17U2Pressurixer HeaterXFMR.Rm.U2DieselFuelOilXFMR.Rm.U2DieselGenerator Rm.2ABU2Di,eselGenerator Rm.2CDU2Di.eselGenerator RampCorr.Ul&2AFVPVestibule 0/10/20/212/04/02/OCU2ControlRoomU2Svitchgear CableVaultU2ControlRm.CableVaultU2Aux.CableVault42/00/10~0/13P/76~0/6Ul&2ESVBasementAreaU2ESVPump&MCCRms.4/OC9/0CSystemprotectsareacommontobothUnits1and2*(x/y)xisnumberofFuncti.on h(earlyvarningfiredetecti.on andnotification only)instruments.
circuit contains both smoke and flame detectors*~tvo circui.ts of five detectors each tvo circuits of 38 detectors each COOK NUCLEAR PLANT-UNIT 2 3/4 3-52 AMENDMENT N0.61, 115 T 3.3-10 POST-ACCIDENT RING INSTRUHENTATION
yisnumberofFunctionB(actuation offiresuppression systemsandearlyvarningandnotifi.cation) instruments.
~INSTRUHENT n n 1.Containment Pressure g 2~R e a c t o r C o o 1 a n t 0 u t 1 e t T e m p e r a t u r e-T I l 0 T (I l I d e R a n g e)g 3.Reactor Coolant Inlet Temperature
circuitcontainsbothsmokeandflamedetectors
-T (Wide Range)H 4.Reactor Coolant Pressure-Wide Range 5.Pressurizer Mater Level 6.Steam Line Pressure 7.Steam Generator Mater Level-Narrow Range S.Refueling Mater Storage Tank Mater Level 9.Boric Acid Tank Solution Level 10.Auxiliary Feedwater Flow Rate Ds ll.Reactor Coolant System Subcooling Hargin Honitor I 12.PORV Position Indicator-Limit Switches***
*~tvocircui.ts offivedetectors eachtvocircuitsof38detectors eachCOOKNUCLEARPLANT-UNIT23/43-52AMENDMENT N0.61,115 T3.3-10POST-ACCIDENT RINGINSTRUHENTATION
13.PORV Block Valve Position Indicator-Limit Switches 14.Safety Valve Position Indicator-Acoustic Honitor 15.Incore Thermocouples (Core Exit Thermocouples) 16.Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication) 17.Containment Sump Level 18.Containment Mater Level HINIHUH CllANNELS OPERABLE 2 2/Steam Generator 1/Steam Generator 1/Steam Generator*
~INSTRUHENT nn1.Containment Pressureg2~ReactorCoo1ant0ut1etTemperature-TIl0T(IlIdeRange)g3.ReactorCoolantInletTemperature
1/Valve 1/Valve l/Valve 2/Core Quadrant One Train (3 channels/Train) 1****2**4**Steam Cenerator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument
-T(WideRange)H4.ReactorCoolantPressure-WideRange5.Pressurizer MaterLevel6.SteamLinePressure7.SteamGenerator MaterLevel-NarrowRangeS.Refueling MaterStorageTankMaterLevel9.BoricAcidTankSolutionLevel10.Auxiliary Feedwater FlowRateDsll.ReactorCoolantSystemSubcooling HarginHonitorI12.PORVPositionIndicator
**&~i'ubcooling margin readout can be used as a substitute for the subcooling monitor instrument.
-LimitSwitches***
***Acoustic monitoring of PORV position (1 channel per three valves-headered discharge) can be used as a i t-'..'substitute for the PORV Indicator-Limit Switches instruments.
13.PORVBlockValvePositionIndicator
0***The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational.
-LimitSwitches14.SafetyValvePositionIndicator
The schedule for modification or replacement of the transmf.tters is describe" in the Bases.-Amendment-No-.-gg-;
-AcousticHonitor15.IncoreThermocouples (CoreExitThermocouples) 16.ReactorCoolantInventory TrackingSystem(ReactorVesselLevelIndication) 17.Containment SumpLevel18.Containment MaterLevelHINIHUHCllANNELS OPERABLE22/SteamGenerator 1/SteamGenerator 1/SteamGenerator*
1/Valve1/Valvel/Valve2/CoreQuadrantOneTrain(3channels/Train) 1****2**4**SteamCenerator WaterLevelChannelscanbeusedasasubstitute forthecorresponding auxiliary feedwater flowratechannelinstrument
**&~i'ubcooling marginreadoutcanbeusedasasubstitute forthesubcooling monitorinstrument.
***Acousticmonitoring ofPORVposition(1channelperthreevalves-headereddischarge) canbeusedasait-'..'substitute forthePORVIndicator
-LimitSwitchesinstruments.
0***Therequirements fortheseinstruments willbecomeeffective aftertheleveltransmitters aremodifiedorreplacedandbecomeoperational.
Thescheduleformodification orreplacement ofthetransmf.tters isdescribe" intheBases.-Amendment-No-.-gg-;
95-{Effect)ve-before"start-up fN'tON7ttgt'~ur
95-{Effect)ve-before"start-up fN'tON7ttgt'~ur
~~scheduled s~iIgt'ylgP'!If0li4~l EACTORCOOLANTSYSTEMLIMITINGCONDITION FOROPERATION Continued 2.Withtwoormoreblockvalvesinoperable, Within1houreither(1)restoreatotalofatleasttwoblockvalvestoOPERABLEstatus,or(2)closetheblockvalvesandremovepowerfromtheblockvalves,or(3)closetheassociated PORVsandremovepowerfromtheirassociated solenoidvalves;andapplytheportionsofACTIONa.2ora.3aboveforinoperable PORVs,relatingtoOPERATIONAL MODE,asappropriate.
~~scheduled s~i I g t'y lg P'!I f 0 l i4~l EACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION Continued 2.With two or more block valves inoperable, Within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions of ACTION a.2 or a.3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriate.
c.WithPORVsandblockvalvesnotinthesamelineinoperable,*
c.With PORVs and block valves not in the same line inoperable,*
within1houreither(1)restorethevalvestoOPERABLEstatusor(2)closeandde-energize theothervalveineachline.ApplytheportionsofACTIONa.2ora.3above,relatingtoOPERATIONAL MODE,asappropriate fortwoorthreelinesunavailable.
within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve in each line.Apply the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable.
d.Theprovisions ofSpecification 3.0.4arenotapplicable.
d.The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE REUIREMENTS
SURVEILLANCE RE UIREMENTS.4.11.1 Each of the three PORVs shall be demonstrated OPERABLE: a.At least once per 31 days by performance of a CHANNEL FUNCTIONAL TEST, excluding valve operation, and b.At least once per 18 months by performance of a CHANNEL CALIBRATION.
.4.11.1EachofthethreePORVsshallbedemonstrated OPERABLE:
4.4.11.2 Each of the.three block valves shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested when ACTION 3.4.1l.a or 3.4.11.c is applied.4.4.11.3 The emergency power supply for the PORVs and block valves shall be demonstrated OPERABLE at least once per 18 months by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite plant batteries.
a.Atleastonceper31daysbyperformance ofaCHANNELFUNCTIONAL TEST,excluding valveoperation, andb.Atleastonceper18monthsbyperformance ofaCHANNELCALIBRATION.
This testing can be 4.8.2.3.2.d.
4.4.11.2Eachofthe.threeblockvalvesshallbedemonstrated OPERABLEatleastonceper92daysbyoperating thevalvethroughonecompletecycleoffulltravel.Theblockvalve(s)donothavetobetestedwhenACTION3.4.1l.aor3.4.11.cisapplied.4.4.11.3Theemergency powersupplyforthePORVsandblockvalvesshallbedemonstrated OPERABLEatleastonceper18monthsbyoperating thevalvesthroughacompletecycleoffulltravelwhiletheemergency busesareenergized bytheonsitedieselgenerators andonsiteplantbatteries.
*PORVs isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.
Thistestingcanbe4.8.2.3.2.d.
COOK NUCLEAR PLANT-UNIT 2 3/4 4-33 AMENDMENT NO.g, gj,]31  
*PORVsisolatedtolimitRCSleakagethroughtheirseatsandtheblockvalvesshuttoisolatethisleakagearenotconsidered inoperable.
~(k~I EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE: a.At 1'east once per 12 hours by verifying that the following valves are Valve Number Valve Function Valve Position a.IMO-390 b.IMO-315 c.IMO-325 d.IMP-262*e.IMO-263*f.IMO-261*g.ICM-305*h.ICM-306*a.RWST to RHR b.Low head SI to Hot Leg c.Low head SI to Hot Leg d.Mini flow line e.Mini flow line f.SI Suction g.Sump Line h.Sump Line a.Open b.Closed c.Closed d.Open e.Open f.Open g.Closed h.Closed b.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherswise secured in position, is in its correct position.c~By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.)is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions.
COOKNUCLEARPLANT-UNIT23/44-33AMENDMENT NO.g,gj,]31  
This visual inspection shall be performed:
~(k~I EMERGENCY CORECOOLINGSYSTEMSSURVEILLANCE REUIREMENTS 4.5.2EachECCSsubsystem shallbedemonstrated OPERABLE:
1.For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and 2.Of the areas affected within containment at the completion of each containment entry when CONTAINMENT INTEGRITY is established.
a.At1'eastonceper12hoursbyverifying thatthefollowing valvesareValveNumberValveFunctionValvePositiona.IMO-390b.IMO-315c.IMO-325d.IMP-262*e.IMO-263*f.IMO-261*g.ICM-305*h.ICM-306*a.RWSTtoRHRb.LowheadSItoHotLegc.LowheadSItoHotLegd.Miniflowlinee.Miniflowlinef.SISuctiong.SumpLineh.SumpLinea.Openb.Closedc.Closedd.Opene.Openf.Openg.Closedh.Closedb.Atleastonceper31daysbyverifying thateachvalve(manual,poweroperatedorautomatic) intheflowpaththatisnotlocked,sealed,orotherswise securedinposition, isinitscorrectposition.
*These valves must change position during the switchover from injection to recirculation flow following LOCA.COOK NUCLEAR PLANT-UNIT 2 3/4 5-4, AMENDMENT N0.7$,131 lg 1d, e gi 5~
c~Byavisualinspection whichverifiesthatnoloosedebris(rags,trash,clothing, etc.)ispresentinthecontainment whichcouldbetransported tothecontainment sumpandcauserestriction ofthepumpsuctionsduringLOCAconditions.
CONTAINMENT SYSTEMS CONTAINHENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containmen air lock shall be OPERABLE with: a.Both doors closed exce'pt when the air lock is being used for normal transit entry and exit through he containment, then at least one air lock d"or shall be closed, and b.An overall air lock leakage rate of<<0.05 L at: P 12 sg ps i g.APPLICABILITY:
Thisvisualinspection shallbeperformed:
MQQES I, 2, 3 and 4.ACTIQM: With an air lock inoperable, maintain at least one door closed;restore the air lock to OPERABLE status within 24 hours or be in at least HGT STAIVGBY within the next 6 hours and in COLD SHUTOOWN within the ol1owinc 30 hours.SUR EILLANC REOrJIREN N 4.6.1.3 Each containment air lock shall be denonstrated OPERABLE: a.*After each opening, except when the air lock is beina used for multiple entries, then at least once per 72 hours, by performing an air leakage test without a simulated pres-sure force on the door by pressurizing the volume between the door seals to 12 psig and verifying a seal leakage rate of no greater han 0.5 L.b A a er.aoaIng an air leakage~test withou a simulated pressure force on the door per Specification 4.6.1.3.a; then by performing an air leakage with a simulated pressure force on the do~r by pressurizing the volume betwe n the door seals to 12 psig and verifying seal leakage rate of no areater than 0.0005 L,"Exemption to Appendix"J" of 10 CFR 50.0.C, COOK UNIT-2'3/4"-4 I Pj!p a~.~f I g4 k 0 CONTAINMENT 5;YSTEHS I T SURVEILLANCE REQUIREMENTS (Continued) c.At least once per 6 months Py conducting an overall air lock leakage test at P+12 psig)and by verifying that the overall air lock leakage kate is within its limit.-'d.At least once per 6 months by verifying that only one door in each air lock can be opened at a time.0.C.COOK,-UNIT 2 3/4 6-5 1 klc tft I t' TABLE 3.6-1 (Continued)
1.Forallaccessible areasofthecontainment priortoestablishing CONTAINMENT INTEGRITY, and2.Oftheareasaffectedwithincontainment atthecompletion ofeachcontainment entrywhenCONTAINMENT INTEGRITY isestablished.
CONTAINHFNT ISOLATION VALVES CD CD PZ VALVE NUtlBER FUNCTION ISOLATION TIME Itl SECONDS D.HANUAL ISOLATION VALVES (Continued)
*Thesevalvesmustchangepositionduringtheswitchover frominjection torecirculation flowfollowing LOCA.COOKNUCLEARPLANT-UNIT23/45-4,AMENDMENT N0.7$,131 lg1d,egi5~
(1)3.1CH-250 4.1CH-251 5.1CH-260 6.1Cti-265 7.1CH-305 8.1CH-3C6 9.1CH-311jt 10.ICH-321II E.OTIIER 1.CS-442-1 2.CS-442-2 3.CS-442-3 4.CS-442-4 Safety Injection Safety Injection~c.7 IIIIR/Suction From RIIR,'uction From I nlwt I+1~Sump Sump RIIR to RC Ilo t Legs RIIR to RC llot Legs Seal Wtr.to RCP Nl Seal Wtr.to RCP 82 Seal Wtr.to RCP N3 Seal Wtr.to RCP N4 Boron Injection 4aLat.Boron Injection In+et NA NA NA NA NA NA
CONTAINMENT SYSTEMSCONTAINHENT AIRLOCKSLIMITINGCONDITION FOROPERATION 3.6.1.3Eachcontainmen airlockshallbeOPERABLEwith:a.Bothdoorsclosedexce'ptwhentheairlockisbeingusedfornormaltransitentryandexitthroughhecontainment, thenatleastoneairlockd"orshallbeclosed,andb.Anoverallairlockleakagerateof<<0.05Lat:P12sgpsig.APPLICABILITY:
%tj qT SYSTEMS LIARY FEEDWATER SYSTEM 1"~u>" LIMITING CONDITION FOR OPERATION AE 3.7.1.2 a.At least t ee independent steam generator auxiliary feedwater pumps and associate flow paths shall be OPERABLE with: Two eedwater pumps'ach capable of being powered from separate emergency busses, and Oneee/eedwater pump capable of being powered from an OPERABLE steam supply system.2.b.At least one auxiliary feedwater flow path in support of Unit 1 shutdown functions shall be available., APPLICABILITY:
MQQESI,2,3and4.ACTIQM:Withanairlockinoperable, maintainatleastonedoorclosed;restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHGTSTAIVGBYwithinthenext6hoursandinCOLDSHUTOOWNwithintheol1owinc30hours.SUREILLANCREOrJIREN N4.6.1.3Eachcontainment airlockshallbedenonstrated OPERABLE:
Specification 3.7.1.2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 1 is in MODES 1, 2, or 3.ACTIONS: With one auxiliary feedwater pumps to STANDBY within the hours.S pecification 3.7.1.2.a a.is applicable:
a.*Aftereachopening,exceptwhentheairlockisbeinausedformultipleentries,thenatleastonceper72hours,byperforming anairleakagetestwithoutasimulated pres-sureforceonthedoorbypressurizing thevolumebetweenthedoorsealsto12psigandverifying asealleakagerateofnogreaterhan0.5L.bAaer.aoaIng anairleakage~testwithouasimulated pressureforceonthedoorperSpecification 4.6.1.3.a; thenbyperforming anairleakagewithasimulated pressureforceonthedo~rbypressurizing thevolumebetwenthedoorsealsto12psigandverifying sealleakagerateofnoareaterthan0.0005L,"Exemption toAppendix"J"of10CFR50.0.C,COOKUNIT-2'3/4"-4 IPj!pa~.~fIg4k0 CONTAINMENT 5;YSTEHSITSURVEILLANCE REQUIREMENTS (Continued) c.Atleastonceper6monthsPyconducting anoverallairlockleakagetestatP+12psig)andbyverifying thattheoverallairlockleakagekateiswithinitslimit.-'d.Atleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.0.C.COOK,-UNIT23/46-5 1klctftIt' TABLE3.6-1(Continued)
feedwater pump inoperable, restore the required auxiliary OPERABLE status within 72 hours or be in at least HOT next 6 hours and in HOT SHUTDO'".f within the-following 6 b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliarf feedwater pump to OPER%LE status as soon as possible.When Specification 3.7."1.2.b is applicable:
CONTAINHFNT ISOLATION VALVESCDCDPZVALVENUtlBERFUNCTIONISOLATION TIMEItlSECONDSD.HANUALISOLATION VALVES(Continued)
With no flow path to Unit 1 available, return at least one flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 1 and return at least one flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specif cation 3.0.4 are not applicable.
(1)3.1CH-2504.1CH-2515.1CH-2606.1Cti-2657.1CH-3058.1CH-3C69.1CH-311jt 10.ICH-321II E.OTIIER1.CS-442-12.CS-442-23.CS-442-34.CS-442-4SafetyInjection SafetyInjection
COOK-UNIT 2 3/4 7-5 Amendment No.82 s>~6  
~c.7IIIIR/SuctionFromRIIR,'uction FromInlwtI+1~SumpSumpRIIRtoRCIlotLegsRIIRtoRCllotLegsSealWtr.toRCPNlSealWtr.toRCP82SealWtr.toRCPN3SealWtr.toRCPN4BoronInjection 4aLat.BoronInjection In+etNANANANANANA
~~~~ELECTRICAL POWER SYSTEMS 3/4.8.3 Alternative A.C.Power Sources LIMITING CONDITION FOR OPERATION 3.8.3.1 The steady state bus voltage for the manual alternate reserve source" shall be greater than or equal to 9OX of the nominal bus voltage.APPLICABILITY:
%tj qTSYSTEMSLIARYFEEDWATER SYSTEM1"~u>"LIMITINGCONDITION FOROPERATION AE3.7.1.2a.Atleastteeindependent steamgenerator auxiliary feedwater pumpsandassociate flowpathsshallbeOPERABLEwith:Twoeedwaterpumps'ach capableofbeingpoweredfromseparateemergency busses,andOneee/eedwater pumpcapableofbeingpoweredfromanOPERABLEsteamsupplysystem.2.b.Atleastoneauxiliary feedwater flowpathinsupportofUnit1shutdownfunctions shallbeavailable.,
Whenever the manual alternate reserve source (69 kV)is connected to more than two buses.ACTION: With bus voltage less than 90K nominal, adjust load on the remaining buses to maintain steady state bus voltage greater than or equal to 90K limit.SURVEILLANCE RE UIREMENTS s 4.8.3.1 No additional surveillance requirements other than those requiraed by Specifications 4.8.1.1.1 and 4.8.1.2,*Shared with D.C..Cook Unit g.D.C.COOK-UNIT 2 3/4 8-20 AMENDMENT NO,~2 g 0 REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONOITION FOR QPERATiON 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spen fuel pool and the heights at which they may be carried over racks con air i..fuel sha'll be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:
APPLICABILITY:
Mith fuel assemblies in the storage pool.ACTION: With the requirements of the abo~pecification not satisfied, place the crane load in a safe condition.
Specification 3.7.1.2.a
The provisions of Specification 3.0.3 are not applicable.
-MODES1,2,3.Specification 3.7.1.2.b
SURVEILLANCE R EQUI REMEN TS 4.9.7.t i I k loads in excess, of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at leas: once per 7 days thereafter during crane operation.
-AtalltimeswhenUnit1isinMODES1,2,or3.ACTIONS:Withoneauxiliary feedwater pumpstoSTANDBYwithinthehours.Specification 3.7.1.2.a a.isapplicable:
4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be<24,240 in.-lbs.prior to moving each load over racks contain~ng fuel.~Shared system with 0.C.COOK-UNIT i 0.C.COOK-UNIT2~~3/4 9-7 Amendment Ho.8786 41 4 tg 1 v L 3~9~9 sSLc Qc ca~p-ge@cd'ollusc solac 4 5'75cM sha~~OPDQL=-.Dur"g Care ALceracioo5 or aave=cac of f.wadiaccd fuel vi-him cue coute'azc.srzaM: Mi 5 cbc C"acai;=e" c Pur~e ed bhau5='salacious sysceP'=-opcrabgc, c ose cac j di'c c Bur c a d Mau5c pe c a o.os p 0<i~.o$dircc~accc55 f~Che COG a'=-C"-a=aspee e CQ Co.e du 5'EC a~SChere~&#x17d;stowe prov.'5="5 of Spec'"cacio" 3.0.3'a=a coc a-ylicablc.
feedwater pumpinoperable, restoretherequiredauxiliary OPERABLEstatuswithin72hoursorbeinatleastHOTnext6hoursandinHOTSHUTDO'".f withinthe-following 6b.Withtwoauxiliary feedwater pumpsinoperable, beinatleastHOTSTANDBYwithin6hoursandinHOTSHUTDOWNwithinthefollowing 6hours.Withthreeauxiliary feedwater pumpsinoperable, immediately initiatecorrective actiontorestoreatleastoneauxiliarf feedwater pumptoOPER%LEstatusassoonaspossible.
4.9.9~se Ca="a'--""~"-g a"H""chouse malat'ca sys-stroll>c 5-=aced OP~EL:--=;" 0'-ours pr='ot co=he sar=o" and a-Least dace pcr 7 days duri"g C"~"-0:~~'0!iS oy'er'-,=g="ac coc 5'"-e"c?urge and ause 5OLac , occu 5 oQ~ual 5 a oc a d ozL a h gh a~c cu c5 sigma'-~ca~o" chc coaca'~e" c radiaciau"oaicar'"g
WhenSpecification 3.7."1.2.b isapplicable:
WithnoflowpathtoUnit1available, returnatleastoneflowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit1andreturnatleastoneflowpathtoavailable statuswithinthenext60days,orhaveUnit1inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.Therequirements ofSpecifcation3.0.4arenotapplicable.
COOK-UNIT23/47-5Amendment No.82s>~6  
~~~~ELECTRICAL POWERSYSTEMS3/4.8.3Alternative A.C.PowerSourcesLIMITINGCONDITION FOROPERATION 3.8.3.1Thesteadystatebusvoltageforthemanualalternate reservesource"shallbegreaterthanorequalto9OXofthenominalbusvoltage.APPLICABILITY:
Wheneverthemanualalternate reservesource(69kV)isconnected tomorethantwobuses.ACTION:Withbusvoltagelessthan90Knominal,adjustloadontheremaining busestomaintainsteadystatebusvoltagegreaterthanorequalto90Klimit.SURVEILLANCE REUIREMENTS s4.8.3.1Noadditional surveillance requirements otherthanthoserequiraed bySpecifications 4.8.1.1.1 and4.8.1.2,*SharedwithD.C..CookUnitg.D.C.COOK-UNIT23/48-20AMENDMENT NO,~2 g0 REFUELING OPERATIONS CRANETRAVEL-SPENTFUELSTORAGEPOOLBUILDING*
LIMITINGCONOITION FORQPERATiON 3.9.7Loadsinexcessof2,500poundsshallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespenfuelpoolandtheheightsatwhichtheymaybecarriedoverracksconairi..fuelsha'llbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,
iftheloadsaredroppedfromthecrane.APPLICABILITY:
Mithfuelassemblies inthestoragepool.ACTION:Withtherequirements oftheabo~pecification notsatisfied, placethecraneloadinasafecondition.
Theprovisions ofSpecification 3.0.3arenotapplicable.
SURVEILLANCE REQUIREMENTS4.9.7.tiIkloadsinexcess,of2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleas:onceper7daysthereafter duringcraneoperation.
4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobe<24,240in.-lbs.priortomovingeachloadoverrackscontain~ng fuel.~Sharedsystemwith0.C.COOK-UNITi0.C.COOK-UNIT2~~3/49-7Amendment Ho.8786 414tg1v L3~9~9sSLcQcca~p-ge@cd'ollusc solac45'75cMsha~~OPDQL=-.Dur"gCareALceracioo5 oraave=cacoff.wadiaccd fuelvi-himcuecoute'azc.srzaM:Mi5cbcC"acai;=e" cPur~eedbhau5='salacious sysceP'=-opcrabgc, cosecacjdi'ccBurcadMau5cpecao.osp0<i~.o$dircc~accc55f~CheCOGa'=-C"-a=aspeeeCQCo.edu5'ECa~SChere~&#x17d;stoweprov.'5="5ofSpec'"cacio" 3.0.3'a=acoca-ylicablc.
4.9.9~seCa="a'--""
~"-ga"H""chousemalat'casys-stroll>c5-=acedOP~EL:--=;"0'-ourspr='otco=hesar=o"anda-Leastdacepcr7daysduri"gC"~"-0:~~'0!iS oy'er'-,=g="accoc5'"-e"c?urgeandause5OLac,occu5oQ~ual5aocadozLahgha~ccuc5sigma'-~ca~o"chccoaca'~e" cradiaciau "oaicar'"g
~c=~ccLcac'ocL channels.
~c=~ccLcac'ocL channels.
0  
0  
<<<<>><<CTTv~<<~<<Tne~xcT.I:5'an ere~s'1z11"es,'1c~n'nFc~r=.'-T.Lcw".-".Cu',a
<<<<>><<C T T v~<<~<<Tne~xcT.I:5'an ere~s'1z11"e s,'1c~n'n F c~r=.'-T.Lcw".-".Cu',a
~'aIT7.=r.ev~r~2Iniebs'".c~n:ie"=CunCarv
~'aIT 7.=r.e v~r~2 I nie b s'".c~n:i e"=CunCarv'~5ra<<<<a a i~'3 Ine si c'wn Tn FT~Q si-~':cure ry-.-r-smus i<<J a>><<~~4 g~vae>>I I<<ieI I 4 I~I<<C>>la 4 s.'1=-I1'=e Se 2 I<<e>>IaI>>p<<~~~Ie<<aap Qae!\I F I Pe a<<,\<<Q a)~2~<<v<<ae~v<<<<<<<<C~~a vI I e<<A I<<~Ir.e r==-C-."r C" 1-=-<<e~<<ge~lip, Q>>s i>><<el a v<<>>a 5~r C=~C>>~vl ec'v>>I ra I'eel>>'>>~e>>~<<v a~<<<<~>>4 e<<'a r~I~~~<<e>>>>~'J~tic aa.n&.I~i I"as~i Ce,ie:.-.a'a C."'f'T'"<<ZTC<ae55 Ca CC.".C.e".-e',1 IS~v r<<<<g 2 i+II Q>><<<<<<Ca e.-e a ICQT e2 4<<~~0 I~aicaia I..P.I a'.<.".e5 5 1 Ii."er vtl 4 I ITC>>ee5~.'le-;=re~vci"-.e~a~2Q<<<<<<<<a]~<<<<~<<<<.~<<>>~aa<<J~>>~<<Ine r=-==r c"n=~~~<<v<<i vna r~vo e<<av~<<a>><<~>>v I~~>>v I'a~~Q i I e~a aag TC I S"~5 C=S>>Can r<<<<I~<<I I~<<<<<<~4>>4l~S l ee~4 e~\=~aa oe>>V~v~'vvv'i'a<<~Sa>>>>I\>>~v a v aev~  
'~5ra<<<<aai~'3Inesic'wnTnFT~Qsi-~':curery-.-r-smusi<<Ja>><<~~4g~vae>>II<<ieII4I~I<<C>>la4s.'1=-I1'=eSe2I<<e>>IaI>>p
<<~~~Ie<<aapQae!\IFIPea<<,\<<Qa)~2~<<v<<ae~v<<<<<<<<C~~avIIe<<AI<<~Ir.er==-C-."r C"1-=-<<e~<<ge~lip,Q>>si>><<elav<<>>a5~rC=~C>>~vlec'v>>IraI'eel>>'>>~e>>~<<va~<<<<~>>4e<<'ar~I~~~<<e>>>>~'J~ticaa.n&.I~iI"as~iCe,ie:.-.a'aC."'f'T'"<<ZTC<ae55CaCC.".C.e".-e',1IS~vr<<<<g2i+IIQ>><<<<<<Cae.-eaICQTe24<<~~0I~aicaiaI..P.Ia'.<.".e551Ii."ervtl4IITC>>ee5~.'le-;=re~vci"-.e~a~2Q<<<<<<<<a]~<<<<~<<<<.~<<>>~aa<<J~>>~<<Iner=-==rc"n=~~~<<v<<ivnar~voe<<av~<<a>><<~>>vI~~>>vI'a~~QiIe~aaagTCIS"~5C=S>>Canr<<<<I~<<II~<<<<<<~4>>4l~Slee~4e~\=~aaoe>>V~v~'vvv'i'a<<~Sa>>>>I\>>~vavaev~  
"~I  
"~I  


==6.0 ADMINISTRATIVE==
==6.0 ADMINISTRATIVE==
CONTROLS6.3FACILITYSTAFFUALIFICATIONS 6.3.1Eachmemberofthefacilitystaffshallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 forcomparable positions, exceptfor(1)theRadiation Protection Supervisor whoshallmeetorexceedthequalifications ofRegulatory Guide1.8,September 1975,and(2)theShiftTechnical Advisorwhoshallhaveabachelor's degreeorequivalent inascientific orengineering discipline withspecifictraininginplantdesign,andresponseandanalysisoftheplantfortransient andaccidents.
CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1)the Radiation Protection Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and (2)the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transient and accidents.
6.4TRAINING6.4.1Aretraining andreplacemenc trainingprogramforthefacilitystaffshallbemaintained underthedirection oftheTrainingCoordinator andshallmeetorexceedtherequirements andrecommendations ofSection5.5ofANSIN18.1-1971 andAppeacL4e-"A" of10CFRPart55.6.5REVIEWANDAUDIT6.5.1PLANTNUCLEARSAFETYREVIEWCOLMITTEE PNSRC6.5.1.1ThePNSRCshallfunctiontoadvisethePlantManageronallmattersrelatedtonuclearsafety.COMPOSITION 6.5.1.2ThePNSRCshallbecomposedofthe:Chairman:
6.4 TRAINING 6.4.1 A retraining and replacemenc training program for the facility staff shall be maintained under the direction of the Training Coordinator and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and AppeacL4e-"A" of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COLMITTEE PNSRC 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to nuclear safety.COMPOSITION 6.5.1.2 The PNSRC shall be composed of the: Chairman: Member: Member: Member: Member: Member: Member: Member: Member: Plant Manager or Designee Assistant Plant Manager-Maintenance Assistant Plant Manager-Operations Operations Superintendent Technical Superintendent
Member:Member:Member:Member:Member:Member:Member:Member:PlantManagerorDesigneeAssistant PlantManager-Maintenance Assistant PlantManager-Operations Operations Superintendent Technical Superintendent
-Engineering Technical Superintendent
-Engineering Technical Superintendent
-PhysicalSciencesMaintenance Superintendent PlantRadiation Protection Supervisor QcSuperintendent D.C.COOK-UNIT26-5Amendment No.73,118 l}}
-Physical Sciences Maintenance Superintendent Plant Radiation Protection Supervisor Qc Superintendent D.C.COOK-UNIT 2 6-5 Amendment No.73,118 l}}

Revision as of 07:49, 6 July 2018

Proposed Tech Specs Reflecting Adminstrative Changes
ML17328A923
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/15/1991
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17328A924 List:
References
NUDOCS 9102220144
Download: ML17328A923 (140)


Text

{{#Wiki_filter:ATTACHMENT 2 to AEP:NRC:1137 PROPOSED, REVISED TECHNICAL SPECIFICATIONS PAGES FOR DONALD C.COOK NUCLEAR PLANT UNITS 1 AND 2~0~220ggy-p 05000~1<OR ADOC<~1021'QR 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS REACTOR CORE 2.1.1 The combination of THERMAL POWER, pressurizer pressure, and the highest operating loop coolant average temperature (T)shall not exceed avg the limits shown in Figure 2.1-1 for 4 loop operation. APPLICABILITY: MODES 1 and 2.ACTION: Whenever the point defined by the combination of the highest operating loop average temperature and THERMAL POWER has exceeded the appropriate pressurizer pressure line, be in HOT STANDBY within 1 hour.REACTOR COOLANT SYSTEM PRESSURE 2.1.2 The Reactor Coolant System pressure shall not exceed 2735 psig.APPLICABILITY: MODES 1, 2, 3, 4 and 5.ACTION: MODES 1 and 2 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, be in HOT STANDBY with the Reactor Coolant System pressure within its limit within 1 hour.MODES 3, 4 and 5 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, reduce the Reactor Coolant System pressure to within its limit within 5 minutes.COOK NUCLEAR PLANT-UNIT 1 2-1 AMENDMENT NO.jUP I*I<<p' 658 ZOO Ps)'a UNACCEPTABLE OP ERAT ION 648~100 Ps fa~000 Ps 1'a~618 le~0 Ps)'a ACCEPTABLE OPERATION 578.2.4.5.6.7.8.1 l.1.1 1.2 POSER t frect,ian of noe<cldl)PRESSURE (PS IA)8REAKPOINTS (FRACTION RATED THERMAL POWER, T-AVG IN DEGREES F)1840 2000 2100 2250 2400 (0.0, 622.1), (0.0, 633.8), (0.0, 640.8), (0.0, 650.7), (0.0, 660".1), (1.13, 587.3), (1.20, (1.08, 601.4), (1 2o, (1.06, 609.8), (1.20, (1.02, 621.9), (1.20, (0.98, 633.7), (1.20, 577.5)586.0).591.3)598.9)606.2)FIGURE 2.1-1 REACTOR CORE SAFETY LIMITS COOK i%'CLEAR PLANT-UNIT I 2-2 AH~HDilENT NO.7g.7N rsz If'>>' TABLE 2.2-1 Continued REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 13.Steam Generator Water Level-Low-Low Greater than or equal to 17'%f narrow range instrument span-each steam generator Greater than or equal to 16%of narrow range instrument span-each steam generator 14.Steam/Feedwater Flow Mismatch and Low Steam Generator Water Level Less than6or equal to 0.71 x 10 lb/hr of steam flow at RATED THERMAL POWER coincident with steam generator water level greater than or equal to 25'%f narrow range instrument span-each steam generator Less than or equal to 0.73 x 10 lbs/hr of steam flow at RATED THERMAL POWER coincident with steam generator water level greater than or equal to 24%of narrow range instrument span-each steam generator 15.Undervoltage Reactor Coolant Pumps Greater than or equal to 2750 volts-each bus Greater than or equal to 2725 volts-each bus 16.Underfrequency-Reactor Coolant Pumps Greater than or equal to 57.5-Hz-each bus Greater than or equal to 57.4 Hz-each bus 17.Turbine Trip A.Low Fluid Oil Pressure B.Turbine Stop Valve Closure Greater than or equal to 800 psig Greater than or equal to 1%open Greater than or equal to 750 psig Greater than or equal to 1%.open 18.Safety Infection Input from ESF Not Applicable Not Applicable 19.Reactor Coolant Pump Breaker Position Trip Not Applicable Not Applicable COOK NUCLEAR PLANT-UNIT 1 2-6 AMENDMENT NO. I 5'I.I'Va jf I]vi~ TABLE 3.3-5 Continued ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 6.Steam Flow in Two Steam Lines-Hi h Coincident With Steam Line Pressure-Low a.Safety In]ection (ECCS)b.Reactor Trip (from SI)c.Feedwater Isolation d.Containment Isolation-Phase"A" e.Containment Purge and Exhaust Isolation f.Auxiliary Feedwater Pumps g.Essential Service Water System h.Steam Line Isolation 7.Containment Pressure--Hi h-Hi h Less than or equal 13.0¹/23.0¹¹ Less than or equal Less than or equal Less than or equal 18.0¹/28.0¹¹ Not Applicable Not Applicable Less than or equal 14.0¹/48.0¹¹ Less than or equal to to 3.0 to 8'to to a.b.Ce Containment Spray Containment Isolation-Phase"B" Steam Line Isolation Containment Air Recirculation Fan r Less than or equal to 45.0 Not Applicable Less than or equal to 10.0 Less than or equal to 600.0 8.Steam Generator Water Level--Hi h-Hi h a.Turbine Trip b.Feedwater Isolation Less than or equal to 2.5 Less than or equal to 11.0 9.Steam Generator Water Level--Low-Low a.Motor Driven Auxiliary Feedwater Pumps b.Turbine Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 Less than or equal to 60.0 10.4160 volt Emer enc Bus Loss of Volta e a.Motor Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 11.Loss of Main Feedwater Pum s a.Motor Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 12: Reactor Coolant Pum Bus Undervolta e a.Turbine Driven Auxiliary Feedwater Pumps Less than or equal to 60.0 COOK NUCLEAR PLANT-UNIT 1 3/4 3-29 AMENDMENT NO.APi l/Hi le

TABLE 4.3-2 Continued ENGINEERED SAFETY FEATURED ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE UIREMENTS FUNCTIONAL UNIT CHANNEL CHANNEL CHANNEL FUNCTIONAL CHECK CALIBRATION TEST MODE IN WHICH SURVEILLANCE 4.STEAM LINE ISOLATION a.Manual b.Automatic Actuation Logic c.Containment Press-ure--High-High d.Steam Flow in Two Steam Lines--High Coincident with Tavg--Low-Low N.A.N.A.N.A." N.A.M(1)M(2)M(3)1,2,3 1,2,3 1,2,3 1,2,3 e.Steam Line Pressure--Low S 1,2,3 5.TURBINE TRIP AND FEEDWATER ISOLATION a.Steam Generator Water Level--High-High 6.MOTOR DRIVEN AUXILIARY FEEDWATER PUMPS 1,2,3 a.Steam Generator Water Level--Low-Low 1,2,3 b.4 kv Bus Loss of Voltage c.Safety Injection d.Loss of Main Feed Pumps N.A.N.A.N.AD N.A.M(2)1,2,3 1,2,3 1,2 COOK NUCLEAR PLANT-UNIT 1 3/4 3-33 AMENDMENT NO.APE, Z/P N2 TABLE 3.3-6 (Continued) TABLE NOTATION ACTION 20-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, comply with the ACTION requirements of Specification 3.4.6.1.ACTION 21-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per day.ACTION 22-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirements, comply with the ACTION requirements of Specification 3.9.9.This ACTION is not required during the performance of containment integrated leak rate test.ACTION 22A-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements: 1.either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable. ACTION 22B-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements'. either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9'within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.In the event of an accident involving radiological releases initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours.4.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable. W COOK NUCLEAR PLANT-UNIT 1 3/4 3-37 AMENDMENT NO.W TABLE 3.3-10 Unit 1 and Common Area Fire Detection S stems Detector S stem Location Total Number of Detectors Auxiliary Building')Elevation 573 b)Elevation'87 c)Elevation 609 d)Elevation 633 e)Elevation 650 f)New Fuel STGE Area g)RP Access Control&Chem Labs Ul East Main Steam Valve Enclosure Ul Main Steam Line Area El.612 (Around Containment) Ul NESW Valve Area El.612 Heat (x/y)+Flame (x/y)" Smoke (x/y)" 23/OC'5/OC 41/OC 41/OC 34/OC 4/OC 25/0 28/Om 13/Oi'm 2/0 Ul 4KV Switchgear (AB)Ul 4KV Switchgear (CD)Ul Engr.Safety System Switchgear &XFMR.Rm.Ul CRD, XFMR.&Switchgear Rm, Inverter&Bttry.Rms.Ul Pressurizer Heater XFMR.Rm.Ul Diesel Fuel Oil Transfer Pump Rm.Ul Diesel Generator Rm.1AB Ul Diesel Generator Rm.1CD Ul Diesel Generator Ramp Corr.Ul&2 AFWP Vestibule 0/1 0/2 0/2 0/3 0/3 0/5 0/5 0/2 0/2 0/9 0/8 12/0 4/0 2/OC Ul Control Room Ul Switchgear Cable Vault Ul Control Room Cable Vault Ul Aux.Cable Vault U162 ESW Basement Area Ul ESW Pump&MCC Rms.45/0 0/10~0/13 0/6 5nw'ov 0/6 4/OC 9/0 C System protects area common to both Units 1 and 2>'<(x/y)x is number of Function A (early warning fire detection and notification only)instruments. y is number of Function B (actuation of fire suppression systems and early warning and notification) instruments'ircuit contains both smoke and flame detectors two circuits of five detectors each two circuits of 32 and 33 detectors each COOK NUCLEAR PLANT-UNIT 1 3/4 3-53 AMENDMENT NO.79'8P )h'4 4crq i1~4%4 TABLE 3.3-11 POST-ACCIDENT MONITORING INTRUMENTATION INSTRUMENT MINIMUM CHANNELS OPERABLE 1~Containment Pressure 2.Reactor Coolant Outlet Temperature-(ide Range)3.Reactor Coolant Inlet Temperature-T (Wide Range)4.Reactor Coolant Pressure-Vide Range 5.Pressurizer Water Level 6.Steam Line Pressure 7.Steam Generator Water Level-Narrow Range 8~Refueling Water Storage Tank Water Level 9.Boric Acid Tank Solution Level 10.Auxiliary Feedwater Flow Rate 11.Reactor Coolant System Subcooling Margin Monitor 12.PORV Position Indicator--Limit Switches~13.PORV Block Valve Position Indicator--Limit Switches 14.Safety Valve Position Indicator--Acoustic Monitor 15~Incore Thermocouples (Core Exit Thermocouples) 16.Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication) 17.Containment Sump Le~el 18.Containment Water Level 2 2 2 2/steam generator 1/steam generator 2 1 1/steam generator~ ].%%1/Valve 1/Valve 1/Valve 2/Core Quadrant One Train (~annels/Train) 2>'<Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument. >'<~'<PPC subcooling margin readout can be used as a substitute for the subcooling monitor instrument. <~'~'<Acoustic monitoring of PORV position (1 channel per three valves-headered discharge) can be used as a substitute for the PORV Position Indicator-Limit Switches instruments. ~'~~The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational. The schedule for modification or replacement of the transmitters is described in the Bases.COOK NUCLEAR PLANT-UNIT 1 3/4 3-55 AMENDMENT NO.ggg I E tl, V)1~rlII ITt REACTOR COOLANT SYSTEM LIMITING CONDITION. FOR OPERATION (Continued) 2.With two or more block valves inoperable, within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions of ACTION a.2 or a.3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriately c.With PORVs and block valves not in the same line inoperable,~ within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve-in each line.Apply the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable. d.The provisions of Specification 3.0.4 are not applicable. SURVEILLANCE RE UIREMENTS 4.4.11.1 Each of the three PORVs shall be demonstrated OPERABLE: At least once per 31 days by performance of CHANNEL FUNCTIONAL TEST, excluding valve operation, and At least once per 18 months by performance of a CHANNEL CALIBRATION. 4.4.11.2 Each of the three block valves shall be demonstrated OPERABLE at least once per 92 days'y operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested when ACTION 3.4.11.a or 3.4.11'is applied.4.4.11.3 The emergency power supply for the PORVs and block valves shall be demonstrated OPERABLE at least once per 18 months.by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite plant batteries. This testing can be performed in conjunction with the requirements of Specifications 4.8.2.3.2.d and 4.8.1.1.2.e. PORVs isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable. COOK NUCLEAR PLANT-UNIT 1 3/4 4-36 AMENDMENT NO.NH, X2'8, CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment ai'r lock shall be OPERABLE with: a.Both doors.closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.An overall air lock leakage rate of less than or equal to 0.05 L a at P , 12 psig~a'PPLICABILITY: MODES 1, 2, 3 and 4.ACTION: With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.6.1~3 Each containment air lock shall be demonstrated OPERABLE: a~By visual inspection after each opening to verify that the seal has not been damaged.*Within 72 hours following each closing, perform an air leakage test without a simulated pressure force on the door by pressurizing the gap between the seals to 12 psig and verifying a seal leakage of no greater than 0.5 L~'<Exemption to Appendix"J" of,10 CFR 50, COOK NUCLEAR PLANT-UNIT 1 3/4 6-4 CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS Continued C.d.At least once per 6 months, perform an air leakage test without a simulated pressure force on the door per 4.6'.3.b., then perform an air leakage test with a simulated pressure force on the door, by pressurizing the volume between the seals to 12 psig and verifying a seal leakage of no greater than 0.0005 L.a't least once per 6 months by conducting an overall air lock leakage test at P (12 psig)and by verifying that the overall air lock leakage rate is within its limits a e.At least once per 6 months by verifying that only one door in each air lock can be opened at a time.COOK NUCLEAR PLANT-UNIT 1 3/4 6-5 AMENDMENT NO. <m.*4 f">4'$t CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued) 4.6.3.1.2 Each isolation valve specified in Table 3.6-1 shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by: a~Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.L b.Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.c.Verifying that on'a Containment Purge and Exhaust isolation signal, each Purge and Exhaust valve actuates to its isolation position.4.6.3.1.3 The isolation time of each power operated or automatic valve of Table 3.6-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 1 3/4 6-15 AMENDMENT NO.gP7, C' TABLE 3.6-1 Continued VALVE NUMBER FUNCTION ISOLATION TIME IN SECONDS CONTAINMENT PURGE EXHAUST~Continued 12.VCR-205 13.VCR-206 14.VCR-207%'PPER COMP.PURGE AIR INLET UPPER COMP.PURGE AIR OUTLET CONT.PRESS RELIEF FAN ISOLATION MANUAL ISOLATION VALVES 1.ICM-111 2.ICM-129 3.ICM-250 4.ICM-251 5.ICM-260 6.ICM-265 7.ICM-305 8.ICM-306 9.ICM-311 10.ICM-321 11.NPX 151 VI 12.PA 343 13.SF-151 14.SF-153 15.SF-159 16.SF-160 17.SI-171 18.SI-172 RHR TO RC COLD LEGS RHR INLET TO PUMPS BORON INJECTION OUTLET BORON INJECTION OUTLET SAFETY INJECTION OUTLET SAFETY INJECTION OUTLET RHR/CTS SUCTION FROM SUMP RHR/CTS SUCTION FROM SUMP RHR TO RC HOT LEGS RHR TO RC HOT LEGS DEAD WEIGHT TESTER CONTAINMENT SERVICE AIR REFUELING WATER SUPPLY REFUELING WATER SUPPLY REFUELING CAVITY DRAIN TO PURIFICATION SYSTEM REFUELING CAVITY DRAIN TO PURIFICATION SYSTEM SAFETY INJECTION TEST LINE ACCUMULATOR TEST LINE NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA COOK NUCLEAR PLANT UNIT 1 3/4 6-21 AMENDMENT NO. 1?*>t (7" 3>1q,!I'\Ih PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 a.At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with: 1.Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency busses, and 2.One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.b.At least one auxiliary feedwater flowpath in support of Unit 2 shutdown functions shall be available. APPLICABILITY: Specification 3.7'.2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 2 is in MODES 1, 2, or 3.ACTIONS'hen Specification 3.7.1.2.a is applicable: a~With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours'.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.When Specification 3.7.1.2.b is applicable: With no flow path to Unit 2 available, return at least one flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return at least one flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specification 3.0.4 are not applicable. COOK NUCLEAR PLANT-UNIT 1 3/4 7-5 AMENDMENT NO.g7, NP, 'L 1'L fl ta REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING+LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY: Vith fuel assemblies in the storage pool.ACTION: Llith the requirements of the above specification not satisfied, place the crane load in a safe condition. The provisions of Specification 3.0.3 are not applicable. SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation. 4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be less than or equal to 24,240 in.-lbs.prior to moving each load over racks containing fuel.~'i Shared system with Cook Nuclear Plant-Unit 2."COOK NUCLEAR PLANT-UNIT 1 3/4 9-8 AMENDMENT NO.NX, ZAP 5.0 DESIGN FEATURES 5.1 SITE EXCLUSION AREA 5.1.1 The exclusion area shall be as shown in Figure 5.1-1.LOW POPULATION ZONE 5.1.2 The low population zone shall be as shown in Figure 5.1-2.Site Boundar For Gaseous and Li uid Effluents 5.1.3 The SITE BOUNDARY for gaseous and liquid effluents shall be as shown in Figure 5.1-3.5.2 CONTAINMENT CONFIGURATION 5.2.1 The reactor containment building is a steel lined, reinforced concrete building of cylindrical shape, with a dome roof and having the following design features: a.Nominal inside diameter 115 feet.b.Nominal inside height 160 feet.+c.Minimum thickness of concrete walls 3'6".d.Minimum thickness of concrete roof 2'6".e.Minimum thickness of concrete floor pad 10 feet.Nominal thickness of steel liner, side and dome 3/8 inches.g.Nominal thickness of steel liner, bottom 1/4 inch.h.Net free volume 1.24 x 10 cubic feet.6 From grade (Elev.608')to inside of dome.COOK NUCLEAR PLANT-UNIT 1 5-1 AMENDMENT NO, H9 1~'ri$'f Docket No.316 Page 5 of 11 (1)Deleted by Amendment 63.(m)Deleted by Amendment 19'n)Deleted by Amendment 28.(o)Fire Protection Amendment No.12 The licensee may proceed with and is required to complete the modifications identified in Table 1 of the Fire Protection Safety Evaluation Report for the Donald C.Cook Nuclear Plant dated June 4, 1979'hese modifications shall be completed in accordance with the dates contained in Table 1 of that SER or Supplements thereto.Administrative controls for fire protection as described in the licensee's submittals dated January 31, 1977 and October 27, 1977 shall be implemented and maintained. Amendment No.64, 121~~(p)Deleted by Amendment 121 DEFINITIONS SOLIDIFICATION 1.29 SOLIDIFICATION shall be the conversion of radioactive liquid, resin and sludge wastes from liquid systems into a form that meets shipping and burial site requirements. OFFSITE DOSE CALCULATION MANUAL ODCM 1.30 The OFFSITE DOSE CALCULATION MANUAL shall contain the methodology and parameters used in the calculation of offsite doses due to radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm/trip setpoints and the conduct of environmental radiological monitoring program.GASEOUS RADWASTE TREATMENT SYSTEM 1.31 A GASEOUS RADWASTE TREATMENT SYSTEM is any system designed and installed to reduce radioactive gaseous effluents by collecting primary coolant system off-gases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment. VENTILATION EXHAUST TREATMENT SYSTEM , 1~32 A VENTILATION EXHAUST TREATMENT SYSTEM is any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate. form in effluents by passing ventilation or vent exhaust gases through charcoal absorbers and/or HEPA filters for the purpose of removing iodines or particulates from the gaseous exhaust stream prior to the release to the environment. Such a system is not considered to have any effect on noble gas effluents. Engineered Safety Feature (ESF)atmospheric cleanup systems are not considered to be VENTILATION EXHAUST TREATMENT SYSTEM components'URGE-PURGING 1.33 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidi.ty, concentration or other operating condition, in such a manner that replacement air or gas is required to purify the confinement. VENTING 1.34 VENTING is the controlled process of discharging air or gas from,a confinement to maintain temperature, pressure, humidity, concentration or other operating condition, in such a manner that replacement air or gas is not provided or required during VENTING.Vent, used in system names, does not imply a VENTING process.COOK NUCLEAR PLANT-UNIT 2 1-7 AMENDMENT NO. 0 Pl r, t'.f 4 P. 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS REACTOR CORE 2.1.1 The combination of THERMAL POWER, pressurizer pressure, and the highest operating loop coolant average temperature (T)shall not exceed avg the limits shown in Figure 2.1-1 for 4 loop operation. APPLICABILITY: MODES 1 and 2.ACTION: Whenever the point defined by the combination of the highest operating loop average temperature and THERMAL POWER has exceeded the appropriate pressurizer pressure line, be in HOT STANDBY within 1 hour.REACTOR COOLANT SYSTEM PRESSURE 2'~2 The Reactor Coolant System pressure shall not exceed 2735 psig.APPLICABILITY: MODES 1, 2, 3, 4 and 5.ACTION: MODES 1 and 2 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, be in HOT STANDBY with the Reactor Coolant System pressure within its limit within 1 hour.MODES 3, 4 and 5 Whenever the Reactor Coolant System pressure has exceeded 2735 psig, reduce the Reactor Coolant System pressure to within its limit within 5 minutes.COOK NUCLEAR PLANT-UNIT 2 2-1 AMENDMENT NO.N 1 fj 0 Ji~t/ 3.4.2 POWER DISTRIBUTION LIMITS AXIAL FLUX DIFFERENCE AFD LIMITING CONDITION FOR OPERATION 3.2.1 The indicated AXIAL FLUX DIFFERENCE (AFD)shall be maintained within the target'band about a targe flux difference. The target band is specified in the COLR.APPLICABILITY: MODE 1 above 50%RATED THERMAL POWER+ACTION: a.With the indicated AXIAL FLUX DIFFERENCE outside of the target band about the target flux difference and with THERMAL POWER: l.Above 90%or 0.9 x APL (whichever is less)of RATED THERMAL POWER, within 15 minutes: a)Either restore the indicated AFD to within the target band limits, or b)Reduce THERMAL POWER to less than 90'%r 0.9 x APL (whichever is less)of RATED THERMAL POWER.2.Between 50%and 90%or 0.9 x APL (whichever is less)of RATED THERMAL POWER;a)POWER OPERATION may continue provided: 1)The indicated AFD has not been outside of the target band for more than 1 hour penalty deviation cumulative during the previous 24 hours, and 2)The indicated AFD is within the limits specified in the COLE.Otherwise, reduce THERMAL POWER to less than 50%of RATED THERMAL POWER within 30 minutes and reduce the Power Range Neutron Flux-High Trip Setpoints to less than or equal to 55%of RATED THERMAL POWER within the next 4 hours.b)Surveillance testing of the Power Range'eutron Flux Channels may be performed pursuant to Specification 4.3.1.1.1 provided the indicated AFD is maintained within the limit specified in the COLR.A total of 16 hours operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation. >'<See Special Test Exception 3'0.2 COOK NUCLEAR PLANT-UNIT 2 3/4 2-1 AMENDMENT NO.Ag, gg7, Xg/ II'I P P t P TABLE 3.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION FUNCTIONAL UNIT TOTAL NO.OF CHAN-NELS CHANNELS TO TRIP MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 1.Manual Reactor Trip 2.Power Range, Neutron Flux 1,2 and+12 1, 2 and*2¹3.Power Range, Neutron Flux, High Positive Rate 1 2 2¹4.Power Range, Neutron Flux, High Negative Rate 1, 2 2¹5.Intermediate Range, Neutron Flux 1, 2 and+3 6.Source Range, Neutron Flux A.Startup B.Shutdown 2¹¹and+4 3, 4 and 5 5 7.Overtemperature Delta T Four Loop Operation 8.Overpower Delta T Four.Loop Operation 1, 2 1, 2 6¹6¹COOK NUCLEAR PLANT-UNIT 2 3/4 3-2 AMENDMENT NO.N ~I)r3 0 C~~".Iy C TABLE 3.3-1 Continued REACTOR TRIP SYSTEM INSTRUMENTATION FUNCTIONAL UNIT TOTAL NO.OF CHAN-CHANNELS NELS TO TRI MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 9.Pressurizer Pressure Low 1, 2 6¹'10.Pressurizer Pressure-High 11.Pressurizer Water Level--High 1, 2 1, 2 6¹7¹12.Loss of Flow-Single Loop (Above P-8)3/loop 2/loop in any opera-ting loop 2/loop in 1 each operating loop 13.Loss of Flow-Two Loops (Above P-7 and below P-8)14.Steam Generator Water Level-Low-Low 3/loop 3/loop 2/loop in two opera-ting loops 2/loop in any opera-ting loop 2/loop in each opera-ting loop 2/loop 1, 2 each operating loop 7¹7¹15.Steam/Feedwater Flow Mismatch and Low Steam Generator Water 2/loop level and 2/loop-flow mismatch in same loop 1/loop level coincident with 1/loop-flow mis-match in same loop 1/loop-level and 2/loop-flow mismatch or 2/loop-level and 1/loop-flow mismatch 1, 2 7¹COOK NUCLEAR PLANT-UNIT 2 3/4 3-3 AMENDMENT NO.Ni lP7 t>>E TABLE 3.3-1 Continued REACTOR TRIP SYSTEM INSTRUMENTATION FUNCTIONAL UNIT 16.Undervoltage-Reactor Coolant Pumps 17.Underfrequency-Reactor Coolant Pumps 18.Turbine Trip;A.Low Fluid Oil Pressure B.Turbine Stop Valve Closure TOTAL NO.OF CHAN-CHANNELS NELS TO TRI 4-1/bus 2 4-1/bus MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 6¹6¹7¹6¹19.Safety Injection Input from ESF 2 1, 2 20.Reactor Coolant Pump Breaker Position Trip Above P-7 21.Reactor Trip Breakers 1/breaker 1/breaker per operating loop 1,2, 3%,4%,5i'r 1,13, 14 22.Automatic Trip Logic 1,2, 3>'r, 4>'c, 5~'<1 14 COOK NUCLEAR PLANT-UNIT 2 3/4 3-4 AMENDMENT NO.PP, gPj, ggj 4 fi gt TABLE 3.3-6 (Continued) TABLE NOTATION'CTION 20-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, comply with the ACTION requirements of Specification 3.4.6'.ACTION 21-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per day.ACTION 22-With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, comply with the ACTION requirements of Specification 3.9.9." This ACTION is not required during the performance of containment integrated leak rate test.ACTION 22A-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements: 1~either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable. ACTION 22B-With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements. l.either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or 2.prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and'he plans and schedule for restoring the system to OPERABLE status.3.In the event of an accident involving radiological releases initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours.4.Technical Specification Sections 3.0.3 and 3.0.4 Not Applicable. COOK NUCLEAR PLANT-UNIT 2 3/4 3-36 AMENDMENT NO W, v J C INSTRUMENT TABLE 3.3-10 POST-ACCIDENT MONITORING INSTRUMENTATION MINIMUM CHANNELS OPERABLE 1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18'ontainment Pressure Reactor Coolant Outlet Temperature -T (Wide Range)Reactor Coolant Inlet Temperature -T (Wide Range)Reactor Coolant Pressure-Wide Range Pressurizer Water Level Steam Line Pressure Steam Generator Water Level-Narrow Range Refueling Water Storage Tank Water Level Boric Acid Tank Solution Level Auxiliary Feedwater Flow Rate Reactor Coolant System Subcooling Margin Monitor PORV Position Indicator-Limit Switches~PORV Block Valve Position Indicator-Limit Switches Safety Valve Position Indicator-Acoustic Monitor Incore Thermocouples (Core Exit Thermocouples) Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication) Containment Sump Level Containment Water Level 2 2 2 2 2 2/steam generator 1/steam generator 2 1 1/steam generator* ]%%'1/valve 1/valve 1/valve 2/core quadrant one-train(3 channels/train) ]~2%9hlPk Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument. PPC subcooling margin readout can be used as a substitute for the subcooling monitor instrument. Acoustic monitoring of PORV position (1 channel per three valves-headered discharge) can be used as a substitute for the PORV Position Indicator-Limit Switches instruments'he requirements for these instruments will.become effective after the level transmitters are modified or replaced and become operational. The schedule for modification or replacement of the transmitters is described in the Bases.COOK NUCLEAR PLANT-UNIT 2 3/4 3-46 AMENDMENT NO.Pg, gt )fan t I,"~l'% TABLE 3.3-11 Unit 2 and Common Area Fire Detection S stems Detection S stem Location Total Number of Detectors Auxiliary Building a)Elevation 573 b)Elevation 587 c)Elevation 609 d)Elevation 633 e)Elevation 650 f)New Fuel STGE Area Heat (x/y)*Flame (x/y)*Smoke (x/y)%23/OC 55/OC 41/OC 41/OC 34/OC 4/OC U2 East Main Steam Valve Enclosure U2 Main Steam Line Area El.612 (Around Containment) U2 NESW Valve Area El.612 28/P~]3/OMY 2/0 U2 4KV Switchgear (AB)U2 4KV Switchgear (CD)U2 Engr.Safety System Switchgear &XFMR.Rm.U2 CRD, XFMR&Switchgear Rm.Inverter&AB Bttry.Rms.0/3 0/3 0/2 0/2 0/5 0/14 0/5 0/17 U2 Pressurizer Heater XFMR~Rm.U2 Diesel Fuel Oil XFMR.Rm.U2 Diesel Generator Rm.2AB U2 Diesel Generator Rm.2CD U2 Diesel Generator Ramp Corr.U1&2 AFWP Vestibule 0/1 0/2 0/2 12/0 4/0 2/OC U2 Control Room U2 Switchgear Cable Vault U2 Control Rm.Cable Vault U2 Aux.Cable Vault 42/0 0/]PM'<O'/13 0/76~'nw 0/6 Ul&2 ESW Basement Area U2 ESW Pump&MCC Rms.4/OC 9/0 C System protects area common to both Units 1 and 2+(x/y)x is number of Function A (early warning fire detection and notification only)instruments. y is, number of Function B (actuation of fire suppression systems and early warning and notifi.cation) instruments. circuit contains both smoke and flame detectors two circuits of five detectors each two circuits of 38 detectors each COOK NUCLEAR PLANT-UNIT 2 3/4 3-52 AMENDMENT NO.N, X2$ <<ji 0 ir 0 VF REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION Continued 2.With two or more block~alves inoperable, C.Within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions'f ACTION a.2 or a~3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriate. k'ith PORVs'and block valves not in the same line inoperable,* within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve in each line.Apply the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable. d.The provisions of Specification 3.0.4 are not applicable. SURVEILLANCE RE UIREMENTS 4.4.11.1 Each of the three PORVs shall be demonstrated OPERABLE: a.At least once per 31 days by performance of a CHANNEL FUNCTIONAL TEST, excluding valve operation, and b.At least once per 18 months by performance of'a CHANNEL CALIBRATION. 4~4~11.2 Each of the three block valves shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested'hen ACTION 3.4'l.a or 3.4.11.c is applied.4.F 11.3 The emergency power supply for the PORVs and block valves.shall be demonstrated OPERABLE at least once per 18 months by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite plant batteries. This testing can be performed in conjunction with the requirements of Specifications 4.8.1.1.2.e and 4.8.2.3.2.d.

  • PORVs isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.

COOK NUCLEAR PLANT-UNIT 2 3/4 4-33 AMENDMENT NO.Ni 97(Z8Z 1~~I>h 1 P EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE: a~At least once per 12 hours by verifying that the following valves are in the indicated positions with the control power locked out: Valve Number Valve Function Valve Position a.IMO-390 b.IMO-315 c.IMO-325 d.IMP-262+e.IMO-263*f.IMO-261*g.ICM-305+h.ICM-306+a.RVST to RHR b.Low head SI to Hot Leg c.Low head SI to Hot Leg d, Mini flow line e.Mini flow line f.SI Suction g.Sump Line h.Sump Line a.Open b.Closed c.Closed d.Open e.Open f.Open g.Closed h.Closed b.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.ce By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.)is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed: 1.For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and 2.Of the areas affected within containment at the completion of each containment entry when CONTAINMENT INTEGRITY is established.

  • These valves must change position during the switchover from injection to recirculation flow following LOCA.COOK NUCLEAR PLANT-UNIT 2 3/4 5-4 AMENDMENT NO.7H, fÃ)<t (,~

CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: a.Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.An overall air lock leakage at P , 12 psig.a'PPLICABILITY: MODES 1, 2, 3 and 4~rate of less than or equal to 0.05 L a ACTION'ith an air lock inoperable, maintain at least one door closed;restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.6'.3 Each containment air lock shall be demonstrated OPERABLE: a.+After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours, by performing an air leakage test without a simulated pressure force on the door by pressurizing the volume between the door seals to 12 psig and verifying a seal leakage rate of no greater than 0.5 L b.+Within 72 hours following each closing,,perform an air leakage test without a simulated pressure force on the door per Specification 4.6'.3.a.;then by performing an air leakage with a simulated pressure force on the door by pressurizing the volume between the door seals to 12 psig and verifying a seal leakage rate of no greater than 0.0005 L~a+Exemption to Appendix"J" of 10 CFR 50.COOK NUCLEAR PLANT-UNIT 2 3/4 6-4 AMENDMENT NO. CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS Continued ce d.At least once per 6 months by conducting an overall air lock leakage test at P (12 psig)and by verifying that the'" overall air lock leakage rate is within its limit.a At least once per 6 months by verifying that only one door in each air lock can be opened at a time.COOK NUCLEAR PLANT-UNIT 2 3/4 6-5 AMENDMENT NO. Cl t I TABLE 3.6-1 (Cont'd)CONTAINMENT ISOLATION VALVES VALVE NUMBER D.MANUAL ISOLATION VALVES (Cont'd)(1)FUNCTION ISOLATION TIME IN SECONDS 3.ICM-250 4.ICM-251 5.ICM-260 6.ICM-265 7.ICM-305 8.ICM-306 9.ICM-311¹10.ICM-321¹BORON INJECTION OUTLET BORON INJECTION OUTLET SAFETY INJECTION OUTLET SAFETY INJECTION OUTLET RHR/CTS SUCTION FROM SUMP RHR/CTS SUCTION FROM SUMP RHR TO RC HOT LEGS RHR TO RC HOT LEGS NA NA NA NA NA NA NA NA E.OTHER 1.CS-442-1 2.CS-442-2 3.CS-442-3 4.CS-442-4 SEAL WTR.TO RCP¹1 SEAL WTR.TO RCP¹2 SEAL WTR.TO RCP¹3 SEAL WTR.TO RCP¹4 NA NA NA NA COOK NUCLEAR PLANT-UNIT 2 3/4 6-27 AMENDMENT NO. >,E~4 PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7,1.2 a.At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with: 1.Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency busses, and 2.One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.b.At least one auxiliary feedwater flow path in support of Unit 1 shutdown function shall be available. APPLICABILITY: Specification 3.7.1~2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 1 is in MODES 1, 2, or 3.ACTIONS'hen Specification 3.7.1.2.a is applicable: a.With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE statuswithin 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT STANDBY within the following 6 hours.c.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.When Specification 3.7.1.2.b is applicable: With no flow path to Unit 1 available, return at least one flow path to available status within 7 days,-or provide equivalent shutdown capability in Unit 1 and return at least one flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 bourse'he requirements of Specification 3.0.4 are not applicable, COOK NUCLEAR PLANT-UNIT 2 3/4 7-5 AMENDMENT NO.N 4 T ELECTRICAL POWER SYSTEMS 3 4.8.3 Alternative A.C.Power Sources LIMITING CONDITION FOR OPERATION 3.8.3.1 The steady state bus voltage for the manual alternate reserve source~shall be greater than or equal to 90%of the nominal bus voltage.APPLICABILITY: Whenever the manual alternate reserve source (69 kV)is connected to more than two buses.ACTION: With bus voltage less than 90%nominal, adjust load on the remaining buses to maintain steady state bus voltage greater than or equal to 90'4 limit.SURVEILLANCE RE UIREMENTS 4.8.3.1 No additional surveillance requirements other than those required by Specifications 4.8.1.1.1 and 4.8.1.2.>>Shared with Cook Nuclear Plant Unit 1, COOK NUCLEAR PLANT-UNIT 2 3/4 8-20 AMENDMENT NO.Xfg 0 IA I I~4 4 ig~l, Qb F 4g REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY: With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition. The provisions of Specification 3.0.3 are not applicable. SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation. 4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be less than or equal to 24,240 in.-lbs.prior to moving each load over racks containing fuel.*Shared system with Cook Nuclear Plant-Unit l.COOK NUCLEAR PLANT-UNIT 2 3/4 9-7 AMENDMENT NO.gg gg fE'4 REFUELING OPERATIONS CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.9 The Containment Purge and Exhaust isolation system shall be OPERABLE.APPLICABILITY: During Core Alterations or movement of irradiated fuel within the containment. ACTION: With the Containment Purge and Exhaust isolation system inoperable, close each of the Purge and Exhaust penetrations providing direct access from the containment atmosphere to the outside atmosphere. The provisions of Specification 3.0.3 are not applicable. SURVEILLANCE RE UIREMENTS 4.9.9 The Containment Purge and Exhaust isolation system shall be demonstrated OPERABLE within 100 hours prior to the start of and at least once per 7 days during CORE ALTERATIONS by verifying that containment Purge and Exhaust isolation occurs on manual initiation and on a high radiation test signal from each of the containment radiation monitoring instrumentation channels.COOK NUCLEAR PLANT-UNIT 2 3/4 9-9 AMENDMENT NO.lN 4 I'4, 5.0 DESIGN FEATURES 5.1 SITE Exclusion Area 5.1.1 The exclus'ion area shall be as shown in Figure 5.1-1.Low Po ulation Zone 5.1.2 The low population zone shall be as shown in.Figure 5.1-2.Site Boundar For Gaseous and Li uid Effluents 5.1~'3 The SITE BOUNDARY for gaseous and liquid effluents shall be as shown in Figure 5.1-3.5.2 CONTAINMENT CONFIGURATION 5.2.1 The reactor containment building is a steel lined, reinforced concrete building of cylindrical shape, with a dome roof and having the following design features: a.Nominal inside diameter 115 feet.b, Nominal inside height 160 feet.c.Minimum thickness of concrete walls 3'6".d.Minimum thickness of concrete roof 2'6".e.Minimum thickness of concrete floor pad 10 feet.f, Nominal thickness of steel liner'3/8 inches.g.Net free volume 1.24 x 10 cubic feet.6 DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained in accordance with the original design provisions contained in Section 5.2.2 of the FSAR.COOK NUCLEAR PLANT-UNIT 2 5-1 AMENDMENT NO~Pl ATTACHMENT 3 TO AEP:NRC:1137 EXISTING T/S PAGES MARKED TO REFLECT PROPOSED CHANGES Of~f rave p mvmps'g The combination of a pOQER, pressurizer pressure ance rbe hXghesc opera@'ng loop coolanc emperature (T)shall noc exceecL che ave 1&its shovn in Pipce 2.1-1 for 4 loop operas'5n. Q~OV: "henevcr rhe po'.'n" ref'.".ed bv rhe combinacion o j-he highesc ooe ac'..g average cempera"'e and.:":"=R~AL PO4KR has exceeCecf"he appropra"e pressuri er pressu e 1'ne."e in HOT STANDBY~ichin 1 hour.OT lpga 5 l5 5'0 c 5'.+2.'.2...e Beaccor Coo'.an" 5'rscem"ressure sha'noc exceed 2735"s>.COLS r., 2.'"8 5 JP>vv'"cene:er-he 2.eac=o in';.O S.A'iD3v~~~~oL 4c a..5 vs rem p essu":".e?.eaccor Coolan=Sys-.h.as excee~ed.i%-s'-r.AQgssu a~~'ene"er='.".e?eacror oo an=Sysrem"ressure.-.-s ex" ceca" red ce=';.e B.eaccor Coolan" Syscem pressure..u~es.L~D.C.COOK-WIT 1 2-1~mme SO.120 ~4~O Ps l g UHACCE?TABLE OPERAi'IOH SO Ps/~lOo Ps)oooo Ps 1g P 4 ala 4O Ps p'~see ACCEPTABLE OP c RAT I GH 578 ,PRESSURE (PS IA),5.4.5.6.7.8,.l l.l.l I.Q POUTER lf'rcgtlOh 0(hO+>>Ill BREAKPO IHTS (FRACTION RATED THERMAL POMER, T-.'VG IH DEGREES F)1840 2000 2100 2250 2400 (0.0, 622.1), (1.13, 587.3).(1.20, 577.5)(0.0, 633.8), (1.08, 601.4).(1.20, 586.0)(0.0, 640.8), (1.06, 609.8).(1.20, 591.3)(0.0, 650.7), (1.02, 621.9), (1.20, 598.9)(0.0, 660.1), (0.98, 633.7), (1.20, 606')=REHLTHERMAL-POMER-~.=34QPAR= FIGURE 2.1-1 REACTOR CORE SAFETY LIMITS COOK R:CL~c PLAVZ-UNIT 1 2-2 az~vDs~vr yo.7g,,fgp 152 FUHCT IAHAL UNIT IIIIII<2.~2-I~Cunt Inured HEAC1DR TRIP SYSTEH INSTRtNENTAT IOH TRIP SETPOIIITS TRIP SETPOltlT Al LOMABLE VALUES l3.Stcaa Generator Hater level-Lo~-Lo~14.Steam/Feed~atcr Floe Hlseatch and to~Steaa Generator Mater Level l5.Undcrvoltage -Reactor Coolant Pumps 16.Underfrequency -Reactor Coolant Puaps>-llX of narra rapgc Instr~nt span-each stcam generator~0.71 x lO lb/hr of stean fin>f b at.RAIL.O TIIEfNAL f'OMEH coincident arith steafw generator water level>251 of narc m range l<<stru-eent span-eacli steam generator 2750 volts-each bus>57.5 Ill-each bus>16'l of narrott ringo Inttrt&4nt', span-each steae generator&<0.73 x lO lbs/hr of steae firn at RATED TIIERHAL POHER coincident with steaa generator sratcr level>24K of narra range lnstru-ient span-each stela gcncrator>2725 volts-each bus>57.4 Ilz-each bus l7.Turbine 1rip aoo pslg memmr lu~F/oid01 ~<~0~$.Turbine Stop Valve)X OPtft Closure>750 pslg>11 open 18.Safety injection Inliut froa ESf lg.Reactor Coolant Puwp Sreaker Pos I t lon Tr lp llot hppl lcablc Hot hppl lcablc Ifot hppl lcablc Hot Appl icablc p Q~~'i'm Q<~atd WP~ C~f~'4 f Jcj TABLE 3.3-5 Continued ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 6.Steam Flov in Tvo Steam Lines'-Hi h Coincident Vith Stcam Linc Pressure-Lov a.b.C~d.c~f.g~Safety Injection (ECCS)Reactor Trip (from SI)Feedvater Isolation Containment Isolation-Phase"h" Containment Purge and Exhaust Isolation Auxiliary Fecdvater Pumps Essential Service Vater System Steam Line Isolation<13.08/23.0~ <3.0<8.0<18.08/28.0~ Not hpplicable Not Applicable <14.0e/48.0e>> <11.0 7.Containment Pressure--Hi h-Hi h a.b.C~d.Containment Spray Containment Isolation-Phase"B" Steam Linc Isolation Containment hir Recirculation Fan<45.0 Not Applicable <10.0<see~b~8.Steam Generator Water Level--Hi h-Hi h a.Turbine Trip b.Fecdvater Isolation<2.5<11.0 9.Steam Generator Vater Level--Lov-Lov a.Motor Driven Auxiliary Feedvater Pumps b.Turbine Driven Auxiliary Fcedvatcr Pumps'60.0<60.0 10.4160 volt Emer enc Bus Loss of Volta e a.Motor Driven Auxiliary Feedvater Pumps<60.0 11.Loss of Main Feedvater Pum s a.Motor Driven Auxiliary Feedvater Pumps<60.0 12.Reactor Coolant Pum Bus Undervolta e a.Turbine Driven Auxiliary Feedvater Pumps<60.0 COOK NUCLEAR PLANT-UNIT 1 3/4 3-29 AMENDMENT NO.gg'ag 'n TABLE 4.3-2 Continued ENGINEERED SAFETY FEATURED ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE UIREMENTS I FUNCTIONAL UNIT" 4.STEAM LINE ISOLATION CHANNEL MODE IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE CHECK CALIBRATION TEST a.Manual b.Automatic Actuation Logic c.Containment Press-ure--High-High d.Steam Flow in'wo Steam Lines--High Coincident with Tavg--Low-Low N.A.N.A.S N.A.N.A.M(1)M(2)M(3)1,2,3 1,2,3 1,2,3 1,2,3~~~Lqn~sure-Lum S TURBINE TRIP&FEEDWATER ISOLATION a.Steam Generator Water Level--High-High 6.MOTOR DRIVEN AUXILIARY FEEDWATER PUMPS a.Steam Generator Water Level--Low-Low 1,2,3 1,2,3 b.4 kv Bus Loss of Voltage c.Safety Injection d.Loss of Main Feed Pumps N.A.N.A.N.A.N.A.M(2)1,2,3 1,2,3 1,2COOK NUCLEAR PLANT-UNIT 1'I 3/4 3-33 AHENDMEvT No.f f], 129, 121, ft~I'I rt I ~gv<<3 3+(Cow<<i aeied)V~CQTQwj 1Q'i"h"he-u."be of charŽeis OP"=HML"-less chan requ'red oy"he~'n'mr z Charne's Operable re~uiremerc. comp y with"he AC.O.rec" remencs of Specificac'on 3.4.5.1.ACT:ON 21.<<ich che n..ber of charnels OPKPJBL="less cnan required by che minimum Channe's Operable requi emenc, perform area su obeys or che monitored area with porcab1e mon'cor..g instr zencacion at'east once per dav.AC i.ON 22'ich"he number minimum Channe 1-ecu"o'ne" s o-requred durng ace test.of channe's OP"=ML"=less chan requ'red bv che s Operable equ'remen=s, comply with che AC;ON Spec'='cat'on 3.9.9.;h's AC.TON is not che pe.=or.-.,ance of concainmenc 'ncegraced eak AC, 2'i=h che"..mber of O?""RABL"- Channels less chan required by che'Ainimum Channels 0?".RA3L". requiremencs: either restore che inooerab'e Channel(s) co OPKRABLi stacus within 7 davs of che evenc, or prepare and submit a Specia pursuanc co Soec'ficacion 'o..e ever.c ou'.'..z che ac inoper'abii'='nd;he plars s'stem=o O.:-BAB'=scat s.3..echnica Spec'='cac'on Sec Noc Aoolicabie. 1'epo r""o che Commis s ion.9.2 w;chin'4 days Eo1.lowing

on=='
:en, che cause of che and--hedule fo.rescor ng che~p,h.='crs 3.0.3~3.0.4 2"3<<ich t'h e number of OP="~~BL:-

Chanre1.s'ess chan rea ired b" che.".'n'mum Channels OPKRA3L:-requi emencs.i.either restore the inoperable Channel(s) co OPKRABLZ status within 7 days of che evenc, or 2.prepare and submi" a Special Report co che Commission pursuanc co Specif'cac'on 6.9.2 with'n 14 days foo~ing che event outl'ning the action taken.che cause of che inoperability and che plans and schedule for restoring che sy'stem co OP"-BABE status.ln che evenc of an acciden" irvoiv rg radioiog cal releases inic ace che preplanned alternate method of monitoring c..e appropriate paramecer(s) wichin 72 hours.No c App 1.i cable.D.C.COOK-L".lid 1 3/4 3-37 Amendment No.94.134 k r, P f'I N sw l~ TABLE 3.3-10 Unit 1 and Common Area Fire Detection S stems Detector S stem Locatio'n Total Number of Detectors Auxiliary Building a)Elevation 38%c~~K b)Elevation 587 c)Elevation 609 d)Elevation 633 e)Elevation 650 f)Nev Fuel STGE Area g)RP Access Control&Chem Labs Ul East Main Steam Valve Enclosure Ul Main Steam Line Area El.612 (Around Containment) Ul NESTS Valve Area El.612 Haae Plans Saa'ka (x/7>*(x/7>"<*/7>*23/OC 55/OC 41/OC 41/OC 34/OC 4/OC 25/0 28/0~],3/0~2/0 Ul 4KV Svitchgear (AB)Ul 4KV Svitchgear (CD)Ul Engr.Safety System Svitchgeaz &XFMR.Rm.Ul CRD, XFMR.&Svitchgear Rm.Invartar&Bttry'.Rms.Ul Pressure.ter Heater XFMR.Rm.Ul Diesel Fuel Oil Transfer Pump Rm.Ul Diesel Generator Rm.1AB Ul Diesel Generator Rm.1CD Ul Diesel Generator Ramp Corr.U162 hEVP Vestibule 0/1 0/2 0/2 0/3 0/3 0/5 0/5 0/2 0/2 0/9 0/8 12/0 4/0 2/OC Ul Control Room Ul Svitchgear Cable Vault Ul Control Room Cable Vault Ul hux.Cable Vault 45/0 0/10~0/13 0/6 5~0/6 Ul&2 ESV Basement hzea Ul ESV Pump&MCC Rms.4/OC 9/0 C System protects area common to both Units 1 and 2*(x/y)x is number of Functi.on h (early varning fi.re detecti.on and notif ication only)instruments. y is number of Function B (actuation of fire suppression systems and early varning and notification) instruments. circuit contains both smoke and flame detectors (~tvo circuits of five detectors each tvo circuits of 32 and 33 detectors each COOK NUCLEAR PLANT-UNIT 1 3/4 3-53 AMENDMENT NO.79,>3o .I 4 1 l-i ThBL.3-11 POST-ACCIDENT HONITORIHC INSTRUHENThTION n INSTBUHEIIY n 1.Contalnacnt Pressure R actor Coo l nt O tlat T peraturo-T T (Mlde Rang 3.Rosctox'oolant Inlet Teaperature -TCO~(Mide Range)M~j Reactor Coolant Pressuro-Mide Range 5.Pressurizer Mater Level&.Stoaa Linc Prcssure l.St.cua C<<nuxuxor Muxer Level-Harrow Range 8, kcl>><<11>>g Muti:r Storage Tank Mater Level Bur li: held Tunk Solution Level HIHIHUH CllhHNELS OPERhhIZ 2/Steaa Cencrator 1/Stcaa Cencrator 10.lo huxt1lary Fceduater Flou Rate 1/Steaa Generator* 11.Reactor Coolant Systca Subcoollng Hargin Honitor 12.PORV Position Indicator-Liait Sultches*** 13.PORV Block Valve Position Indicator-Llalt Svitches 14.Safety Valve Position Indicator-hcoustic Honitor 15.Incore Theraocouples (Cote Exit Theraocouples) 1&.Reactor Coolant Inventory Tracking Systea (Reactor Vassal Level Indication) 17..Containaent Swap Level 1B.Contatnaent Mater Level 1*a 1/Valve 1/Valve 1/Va lve 2/Core Quadrant One Train (3 channels/Train), 1****2****Stcaa Ccnerator Mater Level Channels can be used as a substitute for the corresponding auxiliary feed+ster flou ate channel lnstruacnt Ak subcoollng aargln readout can be used as a<substitute for the subcoollng aonltor instruacnt.

  • <+hcoustlc aonitox'lng of PORV position (1 channel per throe valvos-headered discharge) can be used as s: substitute for the PORV Indicator-Llalt Sultches instruacnts.

~~**The x'cqulrcaents fox these tnstruacnts will becoae offectivo after the level tx'ansaltters are aodl fled or rcplnccd und becoac operational. The schedule for aodlf ication or rcplaceaent of the transalttcrs ls desex lbcd ln xhc Bases.I.1 2-(.&feet-}ve-be fore=s tart-xjp-fxxltoW~mefuetf~xxtxx9~r tf N~4 aH E I qf)I REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION Continued 2.With two or more block valves inoperable, within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions of ACTION a.2 or a.3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriate. c.With PORVs and block valves not in the same line inoperable,* within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve in each line.Apply ,.the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable. E d.The provisions of Specification 3.0.4 are not applicable. SURVEILIANCE RE UIREMENTS4.4.11.1.Each of the three PORVs shall be demonstrated OPERABLE: At least once per 31 days by performance of a CHANNEL FUNCTIONAL TEST, excluding valve operation, and b.At least once per 18 months by performance of a CHANNEL CALIBRATION. 4.4.11.2 Each of the three block valves shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested when ACTION 3.4.11.a or 3.4.11.c is applied.4.4.11.3 The emergency power supply for the PORVs and block valves shall be demonstrated OPERABLE at least once per 18 months by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite.plant batteries. This testing can be performed in con]unction with the requirements of Specifications

  • PORVS isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.

COOK NUCLEAR PLANT-UNIT 1 3/4 4-36 AMENDMENT NO.)gg,)PP,144 YC C'A CONTAINMENT SYSTPIS CONTAjNMENT AiR LOCKS LIMITING CONOlTION FGR OPERATiON 3.6.1.3 Each containment air lock shall, be OPERABLE with: a.Both doors closed exc pt when the air lock is being used for normal transit entry and exit through the containment, then a least one air lock door shall be closed, and b.An overall air lock I eakage rate of<0.05 L at P, 12 psig.APPLICABiL'i (: MODES I, 2, 3 and 4.ACTION: With an air lock inooerable, restore the afr lock to OPERABLE s.atus within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SAUTOGWN within the fol lowing 30 hours.SURVE'LLANCE QEGUIR~>ENTS 4.6.1.3 b.Each containment air lock shall be denonstrated OPERABLE: 9y visual inspection af.r each ooening to verify that the seal has not been damaged.g j II wl bout a simulated pressure for=e on the door by pressurizing t.".e gap betwe n the seals to IZ psig and verifying a seal leakage o7 no great r-han 0.: L."~emp;cn co poendix"~" o=10 C.=.O.C.COOK-UNIT I 3/4 6-4 u' CONTAINMENT SYS~S SVRVEILLAHCE REQUIRB1ENTS (Continued) C.d.e.At least once per 6 months, perform an air leakage test wi hout a simulated oressure force on-.he door oer 4.6.1.3.b., then perform an air leakage tes with a simulated oressure force on the door, by pressurizing the between the seals to 12 psig and verifying a seal leakage of no greater than 0.0005 L.a'1<~~At leas once oer 6 months by conducting an overall air lock leakage test at P (12 osiq)and by verifying that the overall air lock 1 eakage kate is within i ts 1 imi t.A leas.once,per 6 months by verifying that only one door in each air lock can be opened at a time.0.C.COOK-VNIT 1 3/4 6-i k 1" f,i q II" li 4p' CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS Continued va its associated actuator, control or power circuit by-'erformance o e-cycJ.i st, above, and verification of isolation 4.6.3.1.2 Each isolation valve specified in Table 3.6-1 shall be demon-strated OPERABLE during the COLD SHUTDOWN or REHJELING MODE at least once per 18 months by: a.Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.b.Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.c.Verifying that on a Containment Purge and Exhaust isolation signal, each Purge and Exhaust valve actuates to its isolation position.4.6.3.1.3 The isolation time of each power operated or automatic valve of Table~~~~~~3.6-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.I COOK NUCLEAR PLANT-, UNIT 1 3/4 6-15 AMENDMENT NO.)gj,],gg O n n 0 0 I cr VALVE NUHBER FUNCTION C.CONTAINHENT PURGE EXllAUST Continued**TABLE 3.6-1 Conti nu<<~d ISOl&TION TIHE 1N SFCONDS 12.VCR-205 13.VCR-206 14.VCR-207*Upper Comp.Purge Air Inlet Upper Comp.Purge Air Outlet Cont.Press Relief Fan Isolation HANUAL ISOIATION VALVES ICH-ill ICH-129 ICH-250 ICH-251 1CH-260 ICH-265 ICH-305 ICH-306 ICH-311 10.ICH-321 ll.NPX 151 VI 12.PA-343 13.SF-151 14.SF-I 53 15.SF-159 16.SF-160 1/.SI-1/1 18.S I-172 RIIR to RC Cold Legs RIIR Inlet to Pumps Boron Injection~C7~/H Boron I nj ec t ion In+vs Safety Injection In+m Safet Injection I~uc on from w.v c 8HR uction from Sump RllR to RC)lot l.egs RllR to RC llot Legs Dead Weiglit Tester Containment Service Air Refueling Water Supply Refueling Water Supply Refueling Cavity Drain to Purification System Refueling Cavity Drain to Puri.fication System Safety Injection Test Line Accumulator Test Line NA NA n NA NA NA Q NA NA NA NA uI k(~l WIE PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps I and associated fl,ow paths shall be OPERABLE with:<<gc-5mven 1.Two~feedwater pumps, each capable of being powered from separate f emergency busses, and+~+wc-bin~2.Onep,feedwater pump capable of being powered from an OPERABLE steam supply system.b.At least one auxiliary feedwater flowpath in support of Unit 2 shutdown functions shall be available. APPLICABILITY: Specification 3.7.1.2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 2 is in MODES 1, 2, or 3.ACTIONS: When Specification 3.7.1.2.a is applicable: With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in'OT SHUTDOWN within the following 6 hours.b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours.C.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.When Specification 3.7.1.2.b is applicable: With no flow path to Unit 2 available, return at least one flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return at least one flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specification 3.0.4 are not applica'ole. D.C.COOK-U.'i:: 1 3/4 7-5 Amendment."o.92,ic9.:.: 131 1 g j'g'H"pl 4y~A 0 I l I I REFUEL".IG OPEI~T.QNS CRANE TRAVEL-SPENT FUEL S,ORAGE POOL BUILDING LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,SCO oounds shall be prohibi ed from travel~'ver fuel assemolies in the stor ace oool.Loads carried over the soent fuel pool and the heights at wnich they may be carr..'ed over racks c"ntaining fuel shall be limited in such a way as to oreclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABiLITY: With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition. The provisions of Specification 3.0~3 are not applicable. SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks whicn prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation. 4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be (24,240 in.'-lbs.prior to moving each load over racks containing fuel."Shared system with D.C.COOK-UNIT 2 D.C.COOK-UNIT 1~~3/4 9-8 Amendment No.jgg,ll3 l~I I Afz I II 5.0 OESIGN FEATURES 5.1 SITE EXCLUSION AREA 5.1.1 The exclusion area shall.be as shcwn fn Ffgure 5.1-1.LQM POPULATION ZONE 5.1.2 The lcw population zone shall be as shown in Figure 5.1-2.Site Soundarv Fcr Gaseous and Liquid Ef'uents S.L.3 Qe s1aa bau~ndarnd,far gaseaus and IIqusd erfluena sha11 be shown fn F f gure S-.-i=3.-;T-

5.2 CONTAINMENT

CONFIGURATION 5.2.1 The reacto~containment building fs a steel lined, reinforced concrete building of cylindrical shape, with a deme roof and having the following design features: a.Nominal fnside diameter*115 feet.b.Nominal fnside height~160 feet.>>c.Minimum thickness of concrete walls 3'6".d.Minimum thickness of concrete roof*2'6".e.Minimum thickness of concrete floor pad~10 feet.f.Nominal thickness of steel liner, side and dome 3/8 fnches.g.Nominal thickness h.Net free volume~of steel liner, bottom~1/4 inch.1.24 x 10 cubic feet.'crom graae c ev.a to inside of dome.0.C.COOK-UNIT 1 5-1 Amendment No.69 0 0 ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable position, except for (1)the Radiation Protection Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and (2)the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents. 6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Coordinator and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N181-1971 and ggpandkx"A" of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COMMITTEE PNSRC FUNCTION 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to nuclear safety.D.C.COOK-UNIT 1 6-5 Amendment No.49~~33 4'f~1 tj!r!5 pk 0 ADMINISTRATIVE CONTROLS PZSPONSZBILZTZES 6.5.1.6 a.The PNSRC shall be responsible or: Revi.ew of 1)all proc es reau'ed by Soeci'ation 6.8 and cnanges thereto, 2)any other proposed procedures or changes thereto as determined by the P'ant Manager to affect nuclear safety.b.Review of all proposed tests and experiments that affect nuclear safety.C~Review of all proposed charges to Append'x"A" Technical Specifications. Review of all proposed changes or modifications to plant systems or ecuipment that affect nuc'ear safetv.e.Invest'gat'on of all violat'ors of the Technical Specifications including the preparation and forwarding of reports covering evaluat'on and recommendat'ons to prevent recurrence to the Chairman of the NSDRC.Review of all REPORTABLE EVENTS.Rev'ew of fac'lity operations to detect potent'al safety hazards.Performance o special reviews, inves.'cations of analyses and reports thereon as recuested by the Chairman of the NSDRC.Review of the Plant Security Plan" and implement'ng procedures and shall ubmit recommended changes to the Chairman of 0he NSDRC.J~Review o the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.k.Rev'ew of every unplanned crsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation and recomme..dat'ons to prevent recurrence to the NSDRC.Review of changes t'he PROCESS CON ROL PROGB~l, OFESZ=E DOSE CALCULATZCN:ANNUAL, and radwaste treatment s"stem.D.C.COOK-UNIT 1 6-7 Amendment No.87 Docks t No.316 Page 5 of 11 (1)Deleted by Amendment 63.(m)Deleted by Amendment 19.(n)Deleted by Amendment 28.(o)Fire Protection Amendment No.12 Tha li.censee may proceed rt.th and is required to complete the modifications identified in Table 1 of tha Fi.re Protection Safety Evaluation Report for the Donald C.Cook Nuclear Plant dated June 4, 1979.These modifi.cati.ons shill be completed in accordance rith the dates contained in Table 1 of that SER or Supplements thereto, Administrative controls for fire protection as described in the licensee's submittils dated January 31, 1977 and October 27, 1977 shall be implemented ind maintained. Amendment No'4, 121 (p)Deleted by Amandmant/g l 0 A,j1 li a"<<J I 0 JQ~I P c U DE."INITIONS SOLIDIFICATION ]..29 SOLTDIFTCATEON shall be the conversion of radioactive liquid, resiny and sludge wastes from liquid syscems into a form that meets shipping and burial site requirements. OFFSITE DOSE CALCULATION HAiVUAL (ODCA)~.30 The OFFSITE DOSE CALCULATION <<VUAL shall contain the methodology and parameters used in the calculation of offsite doses due to radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm/trip secpoints and the conduct of environmental radiological monitoring program.GASEOUS RADVASTE TREATMENT SYSTEM'.31 A GASEOUS RADVASTE TREAT~fENT SYSTE.'i is any system designed and installed to reduce radioactive gaseous effluents by.collecting primary coolanc system off-gases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment. VEVTELATION EAST TREATMENT SYSTci 1.32 A VENTELATEON EXHAUST TREATAEiVT SYSTEN is any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate form in effluents by pa'ssing ventilat on or vent exhaust gases through charcoal absorbers and/or HEPA filters fo" the purpose of removing iodines or particulategrom the gaseous exhaust scream prior to the release to the environment. Such a system is not considered to have any effect on noble gas effluents. Engineered Safety Feature (ESF)atmospher'c cleanup systems are not considered to be VENTILATION EXHAUST TREAT'fENT SYSTEM components. PURGE-PURGING 1.33 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain tempez'ature, pressuze, humidity, concentration or ocher operating condicion, in such a manner that replacement air or gas is required to purify the confinement. VEHTLVC 1.34 VENTiNG is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidicv, concentration or ocher operating condition, in such a manner that replacement air or gas is not provided or required during VENTTVG.Vent, used in system names, does not imply a VENTING process.D.C.COOK-UNIT 2 1-7 AMENDMENT itO.51 f}\" 4 2.1.1 Tne coabination of~4" PO4:-R, pzessuri"er pressu=e, and the highest operating loop coolant eaperatuze (T)shall not exceed the Limits avg sholem in Figure 2.1-1 for 4 loop operat'on. BAHTS: t"henevez the point defined by the coabfnation of the hiehest operating loop average tecrperature and Td"=KM.PO4=%has exceeded the appropriate pressurizer pressure line, be in HOT STANDBY vithin L hour.2.1.2 The Reactor CooLan" Systen pressu"e shall not exceed 2735 psig.MODES 1 and 2~whenevez the Reactor Coolant System pressuze has exceede'd 2735 ps', be in HOT Sd%)BY vith the Reactor Coolant System pressu-e vithin its L&t within 1 hou".MODES 3, 4 a..d 5 whenever the Reactor Coolant System pressure has exceeded 2735 psig, reduce the Reactor Coolant System pressu"e to vf,thin'ts Limit vithin 5 adnutes.D.C.COOK-POT 2 2-1 NO.82 1 0 11 TABI"-2.2-1 Continuad) , ACTOR TRIP SYSTEM INSTRU.iATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 13.Stcam Generator Water Level-Lov-Lov 14.Steam/Feedvater Flov Mismatch and Lov Stean Cenerator Water Level 15.Unde rvo1 tage Reactor Coolant Pumps 16.Underfrequency-Reactor Coolant Pumps Greater than or equal to 21i of narrov range instrument span-each steam generator Less6than or equal to 1.47 x 10 lbs/hr of stean ilov at RATED THERMAL POWER coincident vith stean generator vater level greater than or equal to 254 of narrov range instrument span-each acean generator Greater than or equal to 2905 volts-each bus Creacer chan or equal to 57.5 Hr,-each bus Creater than or equal to 19.2%of narrov range instrument span-each stean generator Less6than or equal to 1.56 I x 10 lbs/hr of steam flov ac RATED THERKhL POWER coincident vith stean generator vater level greacer than or equal to 24%of narrov range instrument span-each-stean generator Creater than or equal to t 2870 volts-each bus Greater than or equal co I 57.4 Hx-each bus 17.Turbine Trip Pl<"~.~/h.Lov 2z4p Syagae Pressure B.Turbine Stop Valve Closure Creater than or equal to 58 psig Creacer than or equal to 1%open Creacer than or equal to 57 psig Creacer than or equal co lt open 1&.Safety Infection Not Applicable Inpuc from ESF 19.Reactor Coolant Pump Not Applicable Breaker Position Trip Noc hpplicable Not hpplicable COOK NUC~~PLAÃE-UNIT 2 2-6 AMENDNBPZ NO.82~134 4~4~ 3.4.2 PO~DISTRISUTION LI.-ITS AXIAL FLUX DIFF>~rWCE LIMNI INC CONDITION FOR OPERA ION 3.2.1 The indicated A)(IAL FLLX DIFFER-""'tCE (AFO)shall.be maintained vithin che target band about a cargec f'ux d'fference. The target~is specifi~d'n he COLR.APPLICASILITY: RODE 1 above 50%RATED THHviAL POt'ER*AC.:Pl: 'ich the indicated AXIAL F'G(DIFFER~ICE oucside of che target band about the cargec Lux dif erence and vich THH~AL POt'ER: Above 90%or 0.9 x APL (vh'chever is Less)of RATH)THD<~L PO'ER, vichin 15 minutes: a)E'ther restore the indicated AFD to within the target band Limits, or b)Reduce THER."aL PO"ER to less chan 90%or 0.9 x APL (vh'chever is Less)of RATED TH~R~iAL POVER.Bet-een 504 and 904 or 0.9 x AP'whichever is Less)af RATED i~~R<<La PO~C,R;a)": 'ER C?E.KTION may conti.": e provided:.ne'.'ndi cared AFO has.".ot been outside of the target band for mare"'.".an 1 hour penalcy deviation c..u1ac've d'."""Le zrevious 24 hours, and 2)The indicated AFO is-"=.".n che Lim'cs speci" ed in the COLS.Othe.ise, red ce THEB."iAL?O'NER to less chan 50%of RATED THER."AL?Ql'ER withŽ30 minutes and reduce the Pove.Range Neutron FLux-High Tr'.'p Setpoints"o Less than or equaL co 553 of RATED THERMAL PC'ER vith'n the next 4 hours.Su-.:eilLance test'ng of the Paver Range'ieucron Flux Channels mav be per"or ed"rsuant to SpecŽ'cation 4.3.L.L.L provided the'ind'ca"ed AFO is ma'ncained the Lim't specif'ed'n:he COL%.A cacal o=La hours operat'on may be acc-ulated vich:he AFO outside o==he target band during ch's testing vithouc penalty dev'c'n.~See Specia;.est Except'on 3.'0.2 C OK.'."~C.D9.P~~iT-'IT 2 3/4 2-L AvENO~ENT NO.44,107,'; " 0 y I p n O a~l RTf VO]'lJ}f~C" Og)Qj t)(~l.)fanual Reactor Trip TOTAL NO.2.Poser Range, Neutron Flux 4 3.Pouar Range, NeutronFlux 4)llgh Poaitivo Rate 4.,Power Range)Neutron Flux, 4))igh)fegativa Rata 5.Intermediate Range,}loutron Flux C))ANHELS X9'HG3'2 MINIMUM C))ANNELS WORMS~APPLlCABLE ~OQP.S 1, 2 and*1, 2 and~1, 2 11 2 1, 2 and,~CA ld 6.Source Range, Neutron Flux A.Startup B.S}nftdoun 7.Ovortomporature AT Four Loop Operation a.Ovorpouar hT Four Loop Operation 2¹and*3, 4 and 5 1)2 1, 2 TABLE 3.3-1 Continued (-REACTOR TRIP SYSTEM INSTRUMENTATION n n o O Iq I Q UNCTIONAL UN T 9.Pressurizer Pressure-Low 10.Pressurizer Pressure--High ll.Pressurizer Water Level-High TOTAL NO-OF CHANNELS MINIMUM CHANNELS CHANNELS TO TRIP OPERABLE 2 2 APPLICABLE MODES 1, 2 1, 2 1, 2 ACTION 12.Loss of Flow-Single Loop (Above P-8)13.Loss of Flow-Two Loops (Above P-7 and below P-8)3/loop 3/loop 2/loop in 2/loop in any opera-each opera-ting loop ting loop 2/loop in 2/loop in 1 two opera-each opera-ting loops ting loop 14.Steam Generator Water Level-Low-Low 15.Steam/Feedwater Flow Mismatch and Low Steam Generator Water Level 3/loop 2/loop-level and 2/loop-flow mismatch in same loop 2/loop in any opera-ting loop 1/loop-level coincident with 1/loop-flow mismatch in same loop 2/loop in.1, 2 each opera-ting loop 1/loop-level 1, 2 and 2/loop-flow mismatch or 2/loop-level and 1/loop-flow mismatch 0 l 0 O 0 n FUNCTIOHAL UHIT P4 M 16.Undervoltage-Reactor Coolant Pumps TAliLE 3~3-1 Concinu<I)TOTAL NO.OF CllAHHELS Cl lANNE LS TO TRIP MIHIMUM CltANNELS OP ERA BI.E 4-1/bus REACTOR TRIP SYSTEM INSTRUMENTATION APPLICABLE MODES ACTION 11.Underfrequency-Reactor Coolant Pumps 4-1/bus lr>.Tuel>i>>u Trip A.Lou Fluid Oil Pressure B.Turbine Stop Valve Closure 19.Safety Injection Input from ESF 1, 2 20.Reactor Coolant Pump B reake r Position Trip Above P-/21.Reactor Trip Breakers I/1>reak<<r 1/breaker per operat-ing loop 1, 2, 3*4*5*1, 13.14 22.Automatic Trip Logic 0 TABLE 3.3-6 (Cont nued)TABLE VOTgTION CTION 20-Vi.th the number of channels OPERABLE less than required by the Ainimum Channels Operable requirement,, comply with the ACTION requirements of Specf ication 3.4.6.1.ACTION 21 Pith the number of channels OPERABLE less than required by the Ainimum Channels Operable requirement, perform area surveys of the monitored area with portable monitoring instrwentation at least once per day.ACTION 22 Pith the number of channels OPERABLE less than required by the Ainimum Channels Operable requirements, comply with the ACTION requirements of Specf'cation 3.9.9.This ACTION is not requ'red during the performance of containment integrated leak rate test.ACTION 22A-Pith the number oi OPERABLE Channels less than required by the Ainimum Channels OPERABLE requirements: e'ther restore the inoperable Channel(s) to OP qABLE status within 7 days of the event, or 2.prepare and submit a Special Repor" to the Commission pursuan" to Specification 6.9.2"ithin 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedu'e for rqstoring the system to OPERABLE status.g-[~5 3.Technical Specificat'on Sect'ons 3.0.3, 3.0.4 Not Applicable. ACTION 22B-'ith the number of OPERABLE Channels less than required by the Ainimum Channels OPERABLE requ'rements. l.either restore the inoperable Channel(s) to OPERABLE status within 7 days of the even", or 2.prepare and submit a Special Repor" to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.3.In the event of an accident involving radiological releases initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours.Not Applicable. D.C.COOK-UNIT 2 3/4 3-36 Amendment No.80,119 t IA gJ i~'P l 4I E TABLE 3.3-11 Unit 2 and Common Area Fire Detection S stems Detection S stem Location Total Number of Detectors Auxiliary Building a),",Elevation 587 b)(Elewatfon 609 c},"Elevation 633 d)evat on.e Elevation 650 f)Nev Fuel STGE brea Heat (x/y)%'lsae (>/7)*Smoke (x/y)*55/OC 41/OC 41/OC 23/OC~34/OC 4/OC U2 East Main Steam Valve Enclosure U2 Main Steam Line brea El.612 (Around Containment) U2 NESTS Valve Area El.612 28/0~]3/Pk+2/0 U2 4KV Svitchgear (AB)U2 4KV Svitchgear (CD)U2 Engr.Safety System Svi.tchgear 6 XFMR.Rm.U2 CRD, XFMR 6 Svt.tchgear Rm.Inverter&AB Bttry.Rms.0/3 0/3 0/5 0/5 0/2 0/2 0/14 0/17 U2 Pressurixer Heater XFMR.Rm.U2 Diesel Fuel Oil XFMR.Rm.U2 Diesel Generator Rm.2AB U2 Di,esel Generator Rm.2CD U2 Di.esel Generator Ramp Corr.Ul&2 AFVP Vestibule 0/1 0/2 0/2 12/0 4/0 2/OC U2 Control Room U2 Svitchgear Cable Vault U2 Control Rm.Cable Vault U2 Aux.Cable Vault 42/0 0/10~0/13 P/76~0/6 Ul&2 ESV Basement Area U2 ESV Pump&MCC Rms.4/OC 9/0 C System protects area common to both Units 1 and 2*(x/y)x is number of Functi.on h (early varning fire detecti.on and notification only)instruments. y is number of Function B (actuation of fire suppression systems and early varning and notifi.cation) instruments. circuit contains both smoke and flame detectors*~tvo circui.ts of five detectors each tvo circuits of 38 detectors each COOK NUCLEAR PLANT-UNIT 2 3/4 3-52 AMENDMENT N0.61, 115 T 3.3-10 POST-ACCIDENT RING INSTRUHENTATION ~INSTRUHENT n n 1.Containment Pressure g 2~R e a c t o r C o o 1 a n t 0 u t 1 e t T e m p e r a t u r e-T I l 0 T (I l I d e R a n g e)g 3.Reactor Coolant Inlet Temperature -T (Wide Range)H 4.Reactor Coolant Pressure-Wide Range 5.Pressurizer Mater Level 6.Steam Line Pressure 7.Steam Generator Mater Level-Narrow Range S.Refueling Mater Storage Tank Mater Level 9.Boric Acid Tank Solution Level 10.Auxiliary Feedwater Flow Rate Ds ll.Reactor Coolant System Subcooling Hargin Honitor I 12.PORV Position Indicator-Limit Switches*** 13.PORV Block Valve Position Indicator-Limit Switches 14.Safety Valve Position Indicator-Acoustic Honitor 15.Incore Thermocouples (Core Exit Thermocouples) 16.Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication) 17.Containment Sump Level 18.Containment Mater Level HINIHUH CllANNELS OPERABLE 2 2/Steam Generator 1/Steam Generator 1/Steam Generator* 1/Valve 1/Valve l/Valve 2/Core Quadrant One Train (3 channels/Train) 1****2**4**Steam Cenerator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument

    • &~i'ubcooling margin readout can be used as a substitute for the subcooling monitor instrument.
      • Acoustic monitoring of PORV position (1 channel per three valves-headered discharge) can be used as a i t-'..'substitute for the PORV Indicator-Limit Switches instruments.

0***The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational. The schedule for modification or replacement of the transmf.tters is describe" in the Bases.-Amendment-No-.-gg-; 95-{Effect)ve-before"start-up fN'tON7ttgt'~ur ~~scheduled s~i I g t'y lg P'!I f 0 l i4~l EACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION Continued 2.With two or more block valves inoperable, Within 1 hour either (1)restore a total of at least two block valves to OPERABLE status, or (2)close the block valves and remove power from the block valves, or (3)close the associated PORVs and remove power from their associated solenoid valves;and apply the portions of ACTION a.2 or a.3 above for inoperable PORVs, relating to OPERATIONAL MODE, as appropriate. c.With PORVs and block valves not in the same line inoperable,* within 1 hour either (1)restore the valves to OPERABLE status or (2)close and de-energize the other valve in each line.Apply the portions of ACTION a.2 or a.3 above, relating to OPERATIONAL MODE, as appropriate for two or three lines unavailable. d.The provisions of Specification 3.0.4 are not applicable. SURVEILLANCE RE UIREMENTS.4.11.1 Each of the three PORVs shall be demonstrated OPERABLE: a.At least once per 31 days by performance of a CHANNEL FUNCTIONAL TEST, excluding valve operation, and b.At least once per 18 months by performance of a CHANNEL CALIBRATION. 4.4.11.2 Each of the.three block valves shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.The block valve(s)do not have to be tested when ACTION 3.4.1l.a or 3.4.11.c is applied.4.4.11.3 The emergency power supply for the PORVs and block valves shall be demonstrated OPERABLE at least once per 18 months by operating the valves through a complete cycle of full travel while the emergency buses are energized by the onsite diesel generators and onsite plant batteries. This testing can be 4.8.2.3.2.d.

  • PORVs isolated to limit RCS leakage through their seats and the block valves shut to isolate this leakage are not considered inoperable.

COOK NUCLEAR PLANT-UNIT 2 3/4 4-33 AMENDMENT NO.g, gj,]31 ~(k~I EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE: a.At 1'east once per 12 hours by verifying that the following valves are Valve Number Valve Function Valve Position a.IMO-390 b.IMO-315 c.IMO-325 d.IMP-262*e.IMO-263*f.IMO-261*g.ICM-305*h.ICM-306*a.RWST to RHR b.Low head SI to Hot Leg c.Low head SI to Hot Leg d.Mini flow line e.Mini flow line f.SI Suction g.Sump Line h.Sump Line a.Open b.Closed c.Closed d.Open e.Open f.Open g.Closed h.Closed b.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherswise secured in position, is in its correct position.c~By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.)is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed: 1.For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and 2.Of the areas affected within containment at the completion of each containment entry when CONTAINMENT INTEGRITY is established.

  • These valves must change position during the switchover from injection to recirculation flow following LOCA.COOK NUCLEAR PLANT-UNIT 2 3/4 5-4, AMENDMENT N0.7$,131 lg 1d, e gi 5~

CONTAINMENT SYSTEMS CONTAINHENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containmen air lock shall be OPERABLE with: a.Both doors closed exce'pt when the air lock is being used for normal transit entry and exit through he containment, then at least one air lock d"or shall be closed, and b.An overall air lock leakage rate of<<0.05 L at: P 12 sg ps i g.APPLICABILITY: MQQES I, 2, 3 and 4.ACTIQM: With an air lock inoperable, maintain at least one door closed;restore the air lock to OPERABLE status within 24 hours or be in at least HGT STAIVGBY within the next 6 hours and in COLD SHUTOOWN within the ol1owinc 30 hours.SUR EILLANC REOrJIREN N 4.6.1.3 Each containment air lock shall be denonstrated OPERABLE: a.*After each opening, except when the air lock is beina used for multiple entries, then at least once per 72 hours, by performing an air leakage test without a simulated pres-sure force on the door by pressurizing the volume between the door seals to 12 psig and verifying a seal leakage rate of no greater han 0.5 L.b A a er.aoaIng an air leakage~test withou a simulated pressure force on the door per Specification 4.6.1.3.a; then by performing an air leakage with a simulated pressure force on the do~r by pressurizing the volume betwe n the door seals to 12 psig and verifying seal leakage rate of no areater than 0.0005 L,"Exemption to Appendix"J" of 10 CFR 50.0.C, COOK UNIT-2'3/4"-4 I Pj!p a~.~f I g4 k 0 CONTAINMENT 5;YSTEHS I T SURVEILLANCE REQUIREMENTS (Continued) c.At least once per 6 months Py conducting an overall air lock leakage test at P+12 psig)and by verifying that the overall air lock leakage kate is within its limit.-'d.At least once per 6 months by verifying that only one door in each air lock can be opened at a time.0.C.COOK,-UNIT 2 3/4 6-5 1 klc tft I t' TABLE 3.6-1 (Continued) CONTAINHFNT ISOLATION VALVES CD CD PZ VALVE NUtlBER FUNCTION ISOLATION TIME Itl SECONDS D.HANUAL ISOLATION VALVES (Continued) (1)3.1CH-250 4.1CH-251 5.1CH-260 6.1Cti-265 7.1CH-305 8.1CH-3C6 9.1CH-311jt 10.ICH-321II E.OTIIER 1.CS-442-1 2.CS-442-2 3.CS-442-3 4.CS-442-4 Safety Injection Safety Injection~c.7 IIIIR/Suction From RIIR,'uction From I nlwt I+1~Sump Sump RIIR to RC Ilo t Legs RIIR to RC llot Legs Seal Wtr.to RCP Nl Seal Wtr.to RCP 82 Seal Wtr.to RCP N3 Seal Wtr.to RCP N4 Boron Injection 4aLat.Boron Injection In+et NA NA NA NA NA NA %tj qT SYSTEMS LIARY FEEDWATER SYSTEM 1"~u>" LIMITING CONDITION FOR OPERATION AE 3.7.1.2 a.At least t ee independent steam generator auxiliary feedwater pumps and associate flow paths shall be OPERABLE with: Two eedwater pumps'ach capable of being powered from separate emergency busses, and Oneee/eedwater pump capable of being powered from an OPERABLE steam supply system.2.b.At least one auxiliary feedwater flow path in support of Unit 1 shutdown functions shall be available., APPLICABILITY: Specification 3.7.1.2.a-MODES 1, 2, 3.Specification 3.7.1.2.b-At all times when Unit 1 is in MODES 1, 2, or 3.ACTIONS: With one auxiliary feedwater pumps to STANDBY within the hours.S pecification 3.7.1.2.a a.is applicable: feedwater pump inoperable, restore the required auxiliary OPERABLE status within 72 hours or be in at least HOT next 6 hours and in HOT SHUTDO'".f within the-following 6 b.With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours and in HOT SHUTDOWN within the following 6 hours.With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliarf feedwater pump to OPER%LE status as soon as possible.When Specification 3.7."1.2.b is applicable: With no flow path to Unit 1 available, return at least one flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 1 and return at least one flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specif cation 3.0.4 are not applicable. COOK-UNIT 2 3/4 7-5 Amendment No.82 s>~6 ~~~~ELECTRICAL POWER SYSTEMS 3/4.8.3 Alternative A.C.Power Sources LIMITING CONDITION FOR OPERATION 3.8.3.1 The steady state bus voltage for the manual alternate reserve source" shall be greater than or equal to 9OX of the nominal bus voltage.APPLICABILITY: Whenever the manual alternate reserve source (69 kV)is connected to more than two buses.ACTION: With bus voltage less than 90K nominal, adjust load on the remaining buses to maintain steady state bus voltage greater than or equal to 90K limit.SURVEILLANCE RE UIREMENTS s 4.8.3.1 No additional surveillance requirements other than those requiraed by Specifications 4.8.1.1.1 and 4.8.1.2,*Shared with D.C..Cook Unit g.D.C.COOK-UNIT 2 3/4 8-20 AMENDMENT NO,~2 g 0 REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONOITION FOR QPERATiON 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spen fuel pool and the heights at which they may be carried over racks con air i..fuel sha'll be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY: Mith fuel assemblies in the storage pool.ACTION: With the requirements of the abo~pecification not satisfied, place the crane load in a safe condition. The provisions of Specification 3.0.3 are not applicable. SURVEILLANCE R EQUI REMEN TS 4.9.7.t i I k loads in excess, of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at leas: once per 7 days thereafter during crane operation. 4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be<24,240 in.-lbs.prior to moving each load over racks contain~ng fuel.~Shared system with 0.C.COOK-UNIT i 0.C.COOK-UNIT2~~3/4 9-7 Amendment Ho.8786 41 4 tg 1 v L 3~9~9 sSLc Qc ca~p-ge@cd'ollusc solac 4 5'75cM sha~~OPDQL=-.Dur"g Care ALceracioo5 or aave=cac of f.wadiaccd fuel vi-him cue coute'azc.srzaM: Mi 5 cbc C"acai;=e" c Pur~e ed bhau5='salacious sysceP'=-opcrabgc, c ose cac j di'c c Bur c a d Mau5c pe c a o.os p 0<i~.o$dircc~accc55 f~Che COG a'=-C"-a=aspee e CQ Co.e du 5'EC a~SChere~Žstowe prov.'5="5 of Spec'"cacio" 3.0.3'a=a coc a-ylicablc. 4.9.9~se Ca="a'--""~"-g a"H""chouse malat'ca sys-stroll>c 5-=aced OP~EL:--=;" 0'-ours pr='ot co=he sar=o" and a-Least dace pcr 7 days duri"g C"~"-0:~~'0!iS oy'er'-,=g="ac coc 5'"-e"c?urge and ause 5OLac , occu 5 oQ~ual 5 a oc a d ozL a h gh a~c cu c5 sigma'-~ca~o" chc coaca'~e" c radiaciau"oaicar'"g ~c=~ccLcac'ocL channels. 0 <<<<>><<C T T v~<<~<<Tne~xcT.I:5'an ere~s'1z11"e s,'1c~n'n F c~r=.'-T.Lcw".-".Cu',a ~'aIT 7.=r.e v~r~2 I nie b s'".c~n:i e"=CunCarv'~5ra<<<<a a i~'3 Ine si c'wn Tn FT~Q si-~':cure ry-.-r-smus i<<J a>><<~~4 g~vae>>I I<<ieI I 4 I~I<<C>>la 4 s.'1=-I1'=e Se 2 I<<e>>IaI>>p<<~~~Ie<<aap Qae!\I F I Pe a<<,\<<Q a)~2~<<v<<ae~v<<<<<<<<C~~a vI I e<<A I<<~Ir.e r==-C-."r C" 1-=-<<e~<<ge~lip, Q>>s i>><<el a v<<>>a 5~r C=~C>>~vl ec'v>>I ra I'eel>>'>>~e>>~<<v a~<<<<~>>4 e<<'a r~I~~~<<e>>>>~'J~tic aa.n&.I~i I"as~i Ce,ie:.-.a'a C."'f'T'"<<ZTC<ae55 Ca CC.".C.e".-e',1 IS~v r<<<<g 2 i+II Q>><<<<<<Ca e.-e a ICQT e2 4<<~~0 I~aicaia I..P.I a'.<.".e5 5 1 Ii."er vtl 4 I ITC>>ee5~.'le-;=re~vci"-.e~a~2Q<<<<<<<<a]~<<<<~<<<<.~<<>>~aa<<J~>>~<<Ine r=-==r c"n=~~~<<v<<i vna r~vo e<<av~<<a>><<~>>v I~~>>v I'a~~Q i I e~a aag TC I S"~5 C=S>>Can r<<<<I~<<I I~<<<<<<~4>>4l~S l ee~4 e~\=~aa oe>>V~v~'vvv'i'a<<~Sa>>>>I\>>~v a v aev~ "~I

6.0 ADMINISTRATIVE

CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1)the Radiation Protection Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and (2)the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transient and accidents. 6.4 TRAINING 6.4.1 A retraining and replacemenc training program for the facility staff shall be maintained under the direction of the Training Coordinator and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and AppeacL4e-"A" of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COLMITTEE PNSRC 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to nuclear safety.COMPOSITION 6.5.1.2 The PNSRC shall be composed of the: Chairman: Member: Member: Member: Member: Member: Member: Member: Member: Plant Manager or Designee Assistant Plant Manager-Maintenance Assistant Plant Manager-Operations Operations Superintendent Technical Superintendent -Engineering Technical Superintendent -Physical Sciences Maintenance Superintendent Plant Radiation Protection Supervisor Qc Superintendent D.C.COOK-UNIT 2 6-5 Amendment No.73,118 l}}