| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Saba, FaridehSent:Tuesday, May 22, 2012 8:58 AMTo:Westcott, DanielCc:Lingam, SivaSubject:Acceptance Review Determination: CR-3 - Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair (TAC ME8507)Dan, The NRC staff completed the LIC-109 acceptance review of the Relief Request (RR) 12-001-MX, Revision 0, submitted by Florida Power Corporation by letter No. 3F0412-08 dated April 30, 2012 (ML12124A067). The licensee has submitted the request, for the fourth 10-year ISI interval (second 10-year containment ISI interval)for Crystal River Unit 3 Nuclear Generating Plant (CR-3), pursuant to 10 CFR 50.55a(a)(3)(i), on the basis that the proposed alternative for rebar splicing provides an acceptable level of quality and safety,. RR 12-001-MX, Revision 0, requests NRC's approval to use ASME Code Case N-791, "Shear Screw and Sleeve Splices," as an option for reinforcement splicing for the CR-3 delaminated containment repair as an alternative to the provisions IWL-4230 "Reinforcing Steel" which requires rebar to be corrected by any method permitted by theoriginal Construction Code or ASME Section III, Division 2. Based on the criteria in Appendix B, "Guide for Performing Acceptance Reviews," as addressed in Section 3.1.2, "Technical Staff Criteria," and Section 3.2.3, "Acceptable for Review" of the LIC-109 Acceptance Review Procedure, Revision 1, the NRC staff finds that the relief request includes sufficient information for the staff to proceed in conducting a detailed technical review. However, there may be potential areas where additional information may be needed, which will be addressed by the RAI process during the detailed review. | | {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Saba, FaridehSent:Tuesday, May 22, 2012 8:58 AMTo:Westcott, DanielCc:Lingam, Siva |
| | |
| | ==Subject:== |
| | Acceptance Review Determination: CR Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair (TAC ME8507)Dan, The NRC staff completed the LIC-109 acceptance review of the Relief Request (RR) 12-001-MX, Revision 0, submitted by Florida Power Corporation by letter No. 3F0412-08 dated April 30, 2012 (ML12124A067). The licensee has submitted the request, for the fourth 10-year ISI interval (second 10-year containment ISI interval)for Crystal River Unit 3 Nuclear Generating Plant (CR-3), pursuant to 10 CFR 50.55a(a)(3)(i), on the basis that the proposed alternative for rebar splicing provides an acceptable level of quality and safety,. RR 12-001-MX, Revision 0, requests NRC's approval to use ASME Code Case N-791, "Shear Screw and Sleeve Splices," as an option for reinforcement splicing for the CR-3 delaminated containment repair as an alternative to the provisions IWL-4230 "Reinforcing Steel" which requires rebar to be corrected by any method permitted by theoriginal Construction Code or ASME Section III, Division 2. Based on the criteria in Appendix B, "Guide for Performing Acceptance Reviews," as addressed in Section 3.1.2, "Technical Staff Criteria," and Section 3.2.3, "Acceptable for Review" of the LIC-109 Acceptance Review Procedure, Revision 1, the NRC staff finds that the relief request includes sufficient information for the staff to proceed in conducting a detailed technical review. However, there may be potential areas where additional information may be needed, which will be addressed by the RAI process during the detailed review. |
| Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Hearing Identifier: NRR_PMDA Email Number: 381 Mail Envelope Properties (Farideh.Saba@nrc.gov20120522085700) | | Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Hearing Identifier: NRR_PMDA Email Number: 381 Mail Envelope Properties (Farideh.Saba@nrc.gov20120522085700) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review Determination: CR-3 - Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair (TAC ME8507) Sent Date: 5/22/2012 8:57:56 AM Received Date: 5/22/2012 8:57:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Westcott, Daniel" <Daniel.Westcott@pgnmail.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1661 5/22/2012 8:57:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: | | Acceptance Review Determination: CR Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair (TAC ME8507) Sent Date: 5/22/2012 8:57:56 AM Received Date: 5/22/2012 8:57:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Westcott, Daniel" <Daniel.Westcott@pgnmail.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1661 5/22/2012 8:57:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: |
| }} | | }} |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24191A4232024-07-0303 July 2024 RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan 2024-07-03
[Table view] |
Text
1NRR-PMDAPEm ResourceFrom:Saba, FaridehSent:Tuesday, May 22, 2012 8:58 AMTo:Westcott, DanielCc:Lingam, Siva
Subject:
Acceptance Review Determination: CR Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair (TAC ME8507)Dan, The NRC staff completed the LIC-109 acceptance review of the Relief Request (RR) 12-001-MX, Revision 0, submitted by Florida Power Corporation by letter No. 3F0412-08 dated April 30, 2012 (ML12124A067). The licensee has submitted the request, for the fourth 10-year ISI interval (second 10-year containment ISI interval)for Crystal River Unit 3 Nuclear Generating Plant (CR-3), pursuant to 10 CFR 50.55a(a)(3)(i), on the basis that the proposed alternative for rebar splicing provides an acceptable level of quality and safety,. RR 12-001-MX, Revision 0, requests NRC's approval to use ASME Code Case N-791, "Shear Screw and Sleeve Splices," as an option for reinforcement splicing for the CR-3 delaminated containment repair as an alternative to the provisions IWL-4230 "Reinforcing Steel" which requires rebar to be corrected by any method permitted by theoriginal Construction Code or ASME Section III, Division 2. Based on the criteria in Appendix B, "Guide for Performing Acceptance Reviews," as addressed in Section 3.1.2, "Technical Staff Criteria," and Section 3.2.3, "Acceptable for Review" of the LIC-109 Acceptance Review Procedure, Revision 1, the NRC staff finds that the relief request includes sufficient information for the staff to proceed in conducting a detailed technical review. However, there may be potential areas where additional information may be needed, which will be addressed by the RAI process during the detailed review.
Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Hearing Identifier: NRR_PMDA Email Number: 381 Mail Envelope Properties (Farideh.Saba@nrc.gov20120522085700)
Subject:
Acceptance Review Determination: CR Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair (TAC ME8507) Sent Date: 5/22/2012 8:57:56 AM Received Date: 5/22/2012 8:57:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Westcott, Daniel" <Daniel.Westcott@pgnmail.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1661 5/22/2012 8:57:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: