{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 September 4, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
==SUBJECT:==
MID-CYCLE LETTER FOR SURRY POWER STATION UNITS 1 AND 2 - NRC ASSESSMENT REPORT 05000280, 281/2012006
==Dear Mr. Heacock:==
On August 16, 2012, the NRC completed its mid-cycle performance review of Surry Power Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program
governed by IMC 0305, "Operating Reactor Assessment Program."
The NRC determined the performance at Surry Power Station Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-2515/187, "Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-2515/188 "Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns."  The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to di scuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
D. Heacock 2
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4551 with any questions you may have regarding this letter.
Sincerely,  /RA/  Gerald J. McCoy, Chief    Reactor Projects Branch 5
Division of Reactor Projects
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
==Enclosure:==
Surry Inspection/Activity Plan (09/01/2012 - 12/31/2013)
cc w/Encl:  (See page 3) 
_________________________  X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP      SIGNATURE SON /RA/ GJM /RA/      NAME SNinh GMcCoy      DATE 08/23/2012 08/28/2012      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO D. Heacock 3
cc w/encl:
Larry Lane Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution
B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution
Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution
Tom Huber Director, Nuclear Licensing & Operations
Support Inssbrook Technical Center Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197
Richmond, VA  23209
Attorney General Supreme Court Building
900 East Main Street
Richmond, VA  23219
Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
D. Heacock 4
Letter to David A. Heacock from Gerald J. McCoy dated September 4, 2012
==SUBJECT:==
MID-CYCLE LETTER FOR SURRY POWER STATION UNITS 1 AND 2 - NRC ASSESSMENT REPORT 05000280, 281/2012006
Distribution w/encl
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS
PUBLIC RidsNrrPMSurry Resource INPO ROP Reports
Surry Inspection / Activity Plan 09/01/2012
-12/31/2013 Unit Number Page 1 of 1 09/04/2012 08:22:52 Report 22 No. of Staff on Site Planned Dates Start          End Inspection Activity Title 3 MODS-MODIFICATIONS INSPECTION 1, 2  10/08/2012 10/12/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2  10/22/2012 10/26/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 EB3 ISI-UNIT 2 INSERVICE INSPECTION & RPVH EXAMS 2  11/05/2012 11/09/2012 IP 7111108P Inservice Inspection Activities - PWR 1 EB3SGISI-UNIT 2 SG INSERVICE INSPECTION 2  11/12/2012 11/16/2012 IP 7111108P Inservice Inspection Activities - PWR 2 OL RQ-REQUAL INSPECTION 1, 2  01/21/2013 01/25/2013 IP 7111111B Licensed Operator Requalification Program 2 PSB1-RP-RP PUBLIC RAD SAFETY BASELINE 1, 2  06/17/2013 06/21/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2  06/17/2013 06/21/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2  06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 1, 2  07/08/2013 07/12/2013 IP 71152B Problem Identification and Resolution 1, 2  07/22/2013 07/26/2013 IP 71152B Problem Identification and Resolution 1 EP-EMERGENCY PREPAREDNESS EXERCISE 1, 2  07/15/2013 07/19/2013 IP 7111401 Exercise Evaluation 1, 2  07/15/2013 07/19/2013 IP 71151 Performance Indicator Verification 2 ISI-UNIT 1 INSERVICE INSPECTION 1    10/28/2013 11/01/2013 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 1 SG INSERVICE INSPECTION 1    11/04/2013 11/07/2013 IP 7111108P Inservice Inspection Activities - PWR Comments: This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Revision as of 21:36, 1 August 2018

Mid Cycle Assessment Letter Surry 2012
ML12248A123
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/04/2012
From: McCoy G J
NRC/RGN-II/DRP/RPB5
To: Heacock D A
Virginia Electric & Power Co (VEPCO), Dominion Nuclear Connecticut
References
IR-12-006
Download: ML12248A123 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 4, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MID-CYCLE LETTER FOR SURRY POWER STATION UNITS 1 AND 2 - NRC ASSESSMENT REPORT 05000280, 281/2012006

Dear Mr. Heacock:

On August 16, 2012, the NRC completed its mid-cycle performance review of Surry Power Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program

governed by IMC 0305, "Operating Reactor Assessment Program."

The NRC determined the performance at Surry Power Station Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-2515/187, "Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-2515/188 "Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns." The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to di scuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

D. Heacock 2

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4551 with any questions you may have regarding this letter.

Sincerely, /RA/ Gerald J. McCoy, Chief Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection/Activity Plan (09/01/2012 - 12/31/2013)

cc w/Encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SON /RA/ GJM /RA/ NAME SNinh GMcCoy DATE 08/23/2012 08/28/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO D. Heacock 3

cc w/encl:

Larry Lane Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution

B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution

Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Electronic Mail Distribution

Tom Huber Director, Nuclear Licensing & Operations

Support Inssbrook Technical Center Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197

Richmond, VA 23209

Attorney General Supreme Court Building

900 East Main Street

Richmond, VA 23219

Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution

D. Heacock 4

Letter to David A. Heacock from Gerald J. McCoy dated September 4, 2012

SUBJECT:

MID-CYCLE LETTER FOR SURRY POWER STATION UNITS 1 AND 2 - NRC ASSESSMENT REPORT 05000280, 281/2012006

Distribution w/encl

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS

PUBLIC RidsNrrPMSurry Resource INPO ROP Reports

Surry Inspection / Activity Plan 09/01/2012

-12/31/2013 Unit Number Page 1 of 1 09/04/2012 08:22:52 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 3 MODS-MODIFICATIONS INSPECTION 1, 2 10/08/2012 10/12/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/22/2012 10/26/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 EB3 ISI-UNIT 2 INSERVICE INSPECTION & RPVH EXAMS 2 11/05/2012 11/09/2012 IP 7111108P Inservice Inspection Activities - PWR 1 EB3SGISI-UNIT 2 SG INSERVICE INSPECTION 2 11/12/2012 11/16/2012 IP 7111108P Inservice Inspection Activities - PWR 2 OL RQ-REQUAL INSPECTION 1, 2 01/21/2013 01/25/2013 IP 7111111B Licensed Operator Requalification Program 2 PSB1-RP-RP PUBLIC RAD SAFETY BASELINE 1, 2 06/17/2013 06/21/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/17/2013 06/21/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 07/08/2013 07/12/2013 IP 71152B Problem Identification and Resolution 1, 2 07/22/2013 07/26/2013 IP 71152B Problem Identification and Resolution 1 EP-EMERGENCY PREPAREDNESS EXERCISE 1, 2 07/15/2013 07/19/2013 IP 7111401 Exercise Evaluation 1, 2 07/15/2013 07/19/2013 IP 71151 Performance Indicator Verification 2 ISI-UNIT 1 INSERVICE INSPECTION 1 10/28/2013 11/01/2013 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 1 SG INSERVICE INSPECTION 1 11/04/2013 11/07/2013 IP 7111108P Inservice Inspection Activities - PWR Comments: This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.