ML24033A181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From:                                                                                                                                                                             Michael Orenak To:                                                                                                                                                                                                             Darrell Gardner; Drew Peebles Cc:                                                                                                                                                                                                               Pravin Sawant; Candace de Messieres; William Jessup; Matthew Hiser
{{#Wiki_filter:From: Michael Orenak To: Darrell Gardner; Drew Peebles Cc: Pravin Sawant; Candace de Messieres; William Jessup; Matthew Hiser


==Subject:==
==Subject:==
Hermes 2 Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Date:                                                                                                                                                                                   Friday, February 2, 2024 10:10:00 AM
Hermes 2 Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Date: Friday, February 2, 2024 10:10:00 AM


Darrell and Drew,
Darrell and Drew,
Line 27: Line 27:
Below is the eighth set of audit questions for the Hermes 2 General Audit.The NRC staff would like to have a discussion regarding these questions when Kairos is ready. Kairos is welcome to post answers to these questions on the Kairos electronic reading room, but no written answers are requested by the NRC staff at this time.
Below is the eighth set of audit questions for the Hermes 2 General Audit.The NRC staff would like to have a discussion regarding these questions when Kairos is ready. Kairos is welcome to post answers to these questions on the Kairos electronic reading room, but no written answers are requested by the NRC staff at this time.


PSAR Section                                                                                                                                   RequestRequest/Question Number 5.2, Intermediate                     5.2-6                                                                                                                                                                                                               Describe the preliminary design of the rupture Heat Transport                                                         disk(s). Given that rupture disk design and System                                                               operation may vary based on particular system conditions and events, discuss how the preliminary design accounts for the operating characteristics that are unique to the Hermes 2 intermediate heat transport system.
PSAR Section RequestRequest/Question Number 5.2, Intermediate 5.2-6 Describe the preliminary design of the rupture Heat Transport disk(s). Given that rupture disk design and System operation may vary based on particular system conditions and events, discuss how the preliminary design accounts for the operating characteristics that are unique to the Hermes 2 intermediate heat transport system.
5.2, Intermediate                     5.2-7                                                                                                                                                                                                               Specify whether Kairos intends to follow the Heat Transport                                                         overpressure protection provisions for rupture System                                                               disks in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors.
5.2, Intermediate 5.2-7 Specify whether Kairos intends to follow the Heat Transport overpressure protection provisions for rupture System disks in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors.
5.2, Intermediate                     5.2-8                                                                                                                                                                                                               Discuss how the rupture disk will be qualified to Heat Transport                                                         operate in its environment (i.e., hydrogen fluoride System                                                               (HF) exposure and potential salt vapor).
5.2, Intermediate 5.2-8 Discuss how the rupture disk will be qualified to Heat Transport operate in its environment (i.e., hydrogen fluoride System (HF) exposure and potential salt vapor).
5.2, Intermediate                     5.2-9                                                                                                                                                                                                               State whether a build-up of salt vapor or corrosion Heat Transport                                                         products (e.g., from HF) could prevent the rupture System                                                               disk from properly functioning or discuss how the rupture disk is being designed to prevent a loss of functionality under these conditions.
5.2, Intermediate 5.2-9 State whether a build-up of salt vapor or corrosion Heat Transport products (e.g., from HF) could prevent the rupture System disk from properly functioning or discuss how the rupture disk is being designed to prevent a loss of functionality under these conditions.


If you have any questions or need clarifications on the questions before the discussion, please do not hesitate to contact me. This email will be added to ADAMS and will be made public.
If you have any questions or need clarifications on the questions before the discussion, please do not hesitate to contact me. This email will be added to ADAMS and will be made public.

Revision as of 19:21, 5 October 2024

Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9
ML24033A181
Person / Time
Site: Hermes  File:Kairos Power icon.png
Issue date: 02/02/2024
From: Michael Orenak
NRC/NRR/DANU/UAL1
To: Gardner D, Peebles D
Kairos Power
References
EPID L-2023-CPS-0000
Download: ML24033A181 (1)


Text

From: Michael Orenak To: Darrell Gardner; Drew Peebles Cc: Pravin Sawant; Candace de Messieres; William Jessup; Matthew Hiser

Subject:

Hermes 2 Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Date: Friday, February 2, 2024 10:10:00 AM

Darrell and Drew,

Below is the eighth set of audit questions for the Hermes 2 General Audit.The NRC staff would like to have a discussion regarding these questions when Kairos is ready. Kairos is welcome to post answers to these questions on the Kairos electronic reading room, but no written answers are requested by the NRC staff at this time.

PSAR Section RequestRequest/Question Number 5.2, Intermediate 5.2-6 Describe the preliminary design of the rupture Heat Transport disk(s). Given that rupture disk design and System operation may vary based on particular system conditions and events, discuss how the preliminary design accounts for the operating characteristics that are unique to the Hermes 2 intermediate heat transport system.

5.2, Intermediate 5.2-7 Specify whether Kairos intends to follow the Heat Transport overpressure protection provisions for rupture System disks in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section III, Division 5, High Temperature Reactors.

5.2, Intermediate 5.2-8 Discuss how the rupture disk will be qualified to Heat Transport operate in its environment (i.e., hydrogen fluoride System (HF) exposure and potential salt vapor).

5.2, Intermediate 5.2-9 State whether a build-up of salt vapor or corrosion Heat Transport products (e.g., from HF) could prevent the rupture System disk from properly functioning or discuss how the rupture disk is being designed to prevent a loss of functionality under these conditions.

If you have any questions or need clarifications on the questions before the discussion, please do not hesitate to contact me. This email will be added to ADAMS and will be made public.

Mike

Michael D. Orenak, Project Manager Advanced Reactor Licensing Branch 1 (UAL1)

NRR - Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU) 301-415-3229 Michael.Orenak@nrc.gov