ML23356A078

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022
Date released: 12/27/2023 Download: ML23356A078



Enclosure 2: Kairos Power, LLC, Changes to KP-TR-022
ML23356A082
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/22/2023
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2312-004
Download: ML23356A082
Enclosure 1: Kairos Power, LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 13
ML23356A080
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/22/2023
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2312-004
Download: ML23356A080
Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022
ML23356A079
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/22/2023
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
KP-NRC-2312-004
Download: ML23356A079