ML23355A192

From kanterella
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 5
Date released: 12/22/2023 Download: ML23355A192



Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 3 and Chapter 5
ML23355A194
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/21/2023
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2312-003
Download: ML23355A194
Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 5
ML23355A193
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/21/2023
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
KP-NRC-2312-003
Download: ML23355A193