ML24009A247

From kanterella
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9
Date released: 01/10/2024 Download: ML24009A247



Kairos Power LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 9
ML24009A249
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 01/09/2024
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2401-002
Download: ML24009A249
Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9
ML24009A248
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 01/09/2024
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
KP-NRC-2401-002
Download: ML24009A248