Letter Sequence Request |
---|
EPID:L-2023-CPS-0000, International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML23268A446, ML23269A176, ML23276B399, ML23296A220, ML23304A209, ML23324A117, ML23338A235, ML23346A016, ML24002B139, ML24024A226, ML24033A181, ML24043A217, ML24046A173, ML24057A387, ML24103A176, ML24103A178, ML24135A260, ML24135A263, ML24193A214, ML24193A244
|
MONTHYEARML23075A1792023-05-0909 May 2023 International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI Project stage: Request ML23132A3042023-05-22022 May 2023 April 11, 2023 Summary of Closed Meeting with Kairos Power, LLC Regarding Consultations Under National Historic Preservation Act Project stage: Request ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan Project stage: Other ML23268A4462023-10-0303 October 2023 Hermes 2 General Audit Plan Project stage: Other ML23269A1762023-10-11011 October 2023 Kairos Hermes 2 Construction Permit Application Scheduling and Resource Letter Project stage: Other ML23296A2202023-10-13013 October 2023 Hermes 2 General Audit Questions 1.5-1 and 1.5-2 Project stage: Other ML23304A2092023-10-31031 October 2023 Hermes 2 General Audit Questions 1.3-1 and 13.1-1 Project stage: Other ML23324A1172023-11-20020 November 2023 Hermes 2 General Audit Questions 2.1-1, 2.1-2, 2.2-1 Through 4, 2.5-1, 7.1-1, 7.2-1, and 7.2-2 Project stage: Other ML23338A2352023-12-0404 December 2023 Hermes 2 General Audit Questions 7.1-2, 7.1-3, 7.1-4, 7.1-5, and 7.2-3 Project stage: Other ML23346A0162023-12-11011 December 2023 Hermes 2 General Audit Questions 3.5-1, 4.3-1, 5.2-1, 7.4-1, 9.8-1, 11.1-1, 13.1-1 Through 13.1-6, 13.2-1, 14.1-1, and 14.1-2 Project stage: Other ML23349A1482023-12-15015 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML23349A1472023-12-15015 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML23355A1622023-12-21021 December 2023 Kairos Power, LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4 Project stage: Request ML23355A1922023-12-21021 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 5 Project stage: Request ML23355A1612023-12-21021 December 2023 Kairos Power, LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4 Project stage: Request ML23356A0782023-12-22022 December 2023 Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24002B1392024-01-0202 January 2024 Hermes 2 General Audit Questions 2.5-2, 2.5-3, 4.3-2, 4.3-3, 4.5-1, 5.1-1, 5.1-2, 5.1-3, 5.2-2, 5.2-3, 5.2-4, 5.2-5, 6.3-1, 9.1-1, 9.1-2, 9.6-1, 13.1-7 Through 10, TR-1, TR-2, TR-3 Project stage: Other ML24003A7662024-01-0303 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapters 4, 5, 7, and 13 Project stage: Request ML24003A7652024-01-0303 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapters 4, 5, 7, and 13 Project stage: Request ML24009A2472024-01-0909 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24011A2902024-01-11011 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 Project stage: Other ML24025C6852024-01-24024 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 9 Project stage: Request ML24026A2992024-01-26026 January 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 Project stage: Request ML24026A3002024-01-26026 January 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 Project stage: Request ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Project stage: Other ML24039A1912024-02-0808 February 2024 Kairos Power LLC, Changes to Hermes 2 PSAR Chapter 2 Project stage: Request ML24039A1892024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 Project stage: Other ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 Project stage: Other ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 Project stage: Other ML24072A2972024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 Project stage: Request ML24073A3172024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR Project stage: Other ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24103A2432024-04-12012 April 2024 Kairos Power, LLC, Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 Project stage: Request ML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24138A2142024-05-16016 May 2024 Enclosure 2: Supplemental Information on Rupture Disk Design Code Evaluation (non-proprietary) Project stage: Request ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24193A2142024-07-11011 July 2024 Summary Report for the Regulatory Audit of the Kairos Power Hermes 2 Preliminary Safety Analysis Report - General Audit Project stage: Other ML24200A1152024-07-19019 July 2024 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes 2 Non-power Test Reactor Facility Project stage: Approval ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation Project stage: Approval 2024-01-02
[Table View] |
|
---|
Category:Letter
MONTHYEARML24324A0202024-11-21021 November 2024 Letter - Kairos Power LLC - Issuance of Construction Permits for the Hermes 2 Test Reactor Facility ML24261C0092024-09-16016 September 2024 Kairos Power LLC - Charlotte Office Address ML24158A2322024-08-30030 August 2024 Letter to Kairos, Inc., Exemption and Final EA ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation ML24155A0612024-06-0303 June 2024 Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design ML24150A2442024-05-29029 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13 ML24150A2172024-05-28028 May 2024 Kairos Power, LLC - Request for Documents Related to Non-Power Security ML24144A0912024-05-23023 May 2024 Kairos Power, LLC - Submittal of the Hermes 2 Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, Revision 1, and the Postulated Event Analysis Methodology Technical Report, Revi ML24138A2122024-05-16016 May 2024 Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapters 3, 5, and 13 ML24136A2542024-05-15015 May 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9 ML24135A3832024-05-14014 May 2024 Kairos Power, LLC - Transmittal of Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24131A1262024-05-10010 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report Chapters 1, 4, 6-8, 10-12, 14, and 16-18 ML24101A0772024-04-23023 April 2024 Hermes 2 NPS Dea ML24101A0782024-04-23023 April 2024 Hermes 2 SHPO Dea ML24101A0722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, J ML24113A1732024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hill, D ML24113A1702024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bunch, J ML24113A1692024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bryan, a ML24113A1682024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Barnes, B ML24113A1712024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Cernek, J ML24113A1722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hicks, M ML24113A1742024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hoskin, Jr., C ML24113A1752024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, L J ML24113A1762024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Morrow, R K ML24113A1782024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Rogers, L ML24113A1772024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Osceola, Jr. M W ML24113A1792024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Sylestine, R ML24113A1822024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yargee, W ML24113A1802024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Wallace, G J ML24113A1812024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yahola, ML24101A2172024-04-19019 April 2024 Letter to Kairos Power, LLC-Notice of Availability of the Draft Environmental Assessment for the Construction Permit for Hermes 2 Test Reactors ML24109A2952024-04-16016 April 2024 Kairos Power, LLC - Slides to Support April 22, 2024, Public Meeting About Hermes Physical Security ML24103A2422024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24103A2452024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15 ML24206A0852024-03-20020 March 2024 NPS Section 106 Initiation Response - Hermes 2 ML24073A3182024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 ML24072A2982024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 ML24065A1012024-03-0404 March 2024 Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report ML24039A1902024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 ML24032A1872024-02-0202 February 2024 Ltr Hon Chuck Hoskin Jr Principal Chief Cherokee Nation Re Hermes 2 ML24032A2002024-02-0202 February 2024 Ltr Libby Rogers, Principal Chief, Jena Band of Choctaw Indians Re Hermes 2 ML24032A1992024-02-0202 February 2024 Ltr Hon Wilson Yargee, Chief Alabama-Quassarte Tribal Town Re Hermes 2 ML24032A1982024-02-0202 February 2024 Ltr Hon Stephanie Yahola, Mekko Kialegee Tribal Town Re Hermes 2 ML24032A1972024-02-0202 February 2024 Ltr Hon Stephanie a Bryan Chairwoman Poarch Band of Creek Indians Re Hermes 2 ML24032A1962024-02-0202 February 2024 Ltr Hon Ryan K Morrow Town King Thlopthlocco Tribal Town Re Hermes 2 ML24032A1952024-02-0202 February 2024 Ltr Hon Rick Sylestine, Chairman, Alabama-Coushatta Tribe of Tx Re Hermes 2 ML24032A1942024-02-0202 February 2024 Ltr Hon Michell Hicks Principal Chief Eastern Band of Cherokee Indians Re Hermes 2 ML24032A1932024-02-0202 February 2024 Ltr Hon Marcellus W Osceola Jr Chairman Seminole Tribe of Fl Re Hermes 2 ML24032A1922024-02-0202 February 2024 Ltr Hon Lewis J Johnson Chief Seminole Nation of Oklahoma Re Hermes 2 ML24032A1912024-02-0202 February 2024 Ltr Hon Jonathan Cernek Chairman Coushatta Tribe of Louisiana Re Hermes 2 2024-09-16
[Table view] |
Text
KP-NRC-2312-001 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 December 15, 2023 Docket No. 50-611 Docket No. 50-612 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 2
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power LLC - Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446)
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR)
(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor.
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 2 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.
If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or (865) 399-1136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 15, 2023 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to PSAR Chapter 2
KP-NRC-2312-001 Page 2 xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch