Letter Sequence Request |
---|
EPID:L-2023-CPS-0000, International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI (Approved, Closed) EPID:L-2023-CPE-0000, International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML23268A446, ML23269A176, ML23276B399, ML23296A220, ML23304A209, ML23324A117, ML23338A235, ML23346A016, ML24002B139, ML24024A226, ML24033A181, ML24043A217, ML24046A173, ML24057A387, ML24103A176, ML24103A178, ML24135A260, ML24135A263, ML24193A214, ML24193A244
|
MONTHYEARML23075A1792023-05-0909 May 2023 International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI Project stage: Request ML23132A3042023-05-22022 May 2023 April 11, 2023 Summary of Closed Meeting with Kairos Power, LLC Regarding Consultations Under National Historic Preservation Act Project stage: Request ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan Project stage: Other ML23268A4462023-10-0303 October 2023 Hermes 2 General Audit Plan Project stage: Other ML23269A1762023-10-11011 October 2023 Kairos Hermes 2 Construction Permit Application Scheduling and Resource Letter Project stage: Other ML23296A2202023-10-13013 October 2023 Hermes 2 General Audit Questions 1.5-1 and 1.5-2 Project stage: Other ML23304A2092023-10-31031 October 2023 Hermes 2 General Audit Questions 1.3-1 and 13.1-1 Project stage: Other ML23324A1172023-11-20020 November 2023 Hermes 2 General Audit Questions 2.1-1, 2.1-2, 2.2-1 Through 4, 2.5-1, 7.1-1, 7.2-1, and 7.2-2 Project stage: Other ML23338A2352023-12-0404 December 2023 Hermes 2 General Audit Questions 7.1-2, 7.1-3, 7.1-4, 7.1-5, and 7.2-3 Project stage: Other ML23346A0162023-12-11011 December 2023 Hermes 2 General Audit Questions 3.5-1, 4.3-1, 5.2-1, 7.4-1, 9.8-1, 11.1-1, 13.1-1 Through 13.1-6, 13.2-1, 14.1-1, and 14.1-2 Project stage: Other ML23349A1472023-12-15015 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML23355A1922023-12-21021 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 5 Project stage: Request ML23355A1612023-12-21021 December 2023 Kairos Power, LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4 Project stage: Request ML23356A0782023-12-22022 December 2023 Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24002B1392024-01-0202 January 2024 Hermes 2 General Audit Questions 2.5-2, 2.5-3, 4.3-2, 4.3-3, 4.5-1, 5.1-1, 5.1-2, 5.1-3, 5.2-2, 5.2-3, 5.2-4, 5.2-5, 6.3-1, 9.1-1, 9.1-2, 9.6-1, 13.1-7 Through 10, TR-1, TR-2, TR-3 Project stage: Other ML24003A7652024-01-0303 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapters 4, 5, 7, and 13 Project stage: Request ML24009A2472024-01-0909 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24011A2902024-01-11011 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 Project stage: Other ML24025C6852024-01-24024 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 9 Project stage: Request ML24026A2992024-01-26026 January 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 Project stage: Request ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Project stage: Other ML24039A1892024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 Project stage: Other ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 Project stage: Other ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 Project stage: Other ML24072A2972024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 Project stage: Request ML24073A3172024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR Project stage: Other ML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24193A2142024-07-11011 July 2024 Summary Report for the Regulatory Audit of the Kairos Power Hermes 2 Preliminary Safety Analysis Report - General Audit Project stage: Other ML24200A1152024-07-19019 July 2024 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes 2 Non-power Test Reactor Facility Project stage: Approval ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation Project stage: Approval 2024-01-02
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A0802024-01-0808 January 2024 Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting ML23305A0092023-11-0909 November 2023 Summary of the October 26, 2023 Meeting with Tennessee Historical Commission Regarding Section 106 Consultations ML23271A1362023-10-0303 October 2023 Summary of the September 12 and September 21, 2023 Closed Meetings with Kairos Power Regarding Section 106 Consultations ML23242A2422023-09-14014 September 2023 Summary of the August 10, 2023 Closed Meetings with Kairos Power Regarding Section 106 Consultations ML23241A0032023-08-31031 August 2023 And 07/25/2023 Summary of Closed Meetings with Kairos Power Regarding Section 106 Consultations Under Section 106 of the National Historic Preservation Act ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report ML23189A0072023-07-11011 July 2023 June 28, 2023, Summary of the Observation Meeting Between the U.S. Nuclear Regulatory Commission Staff and Kairos Power, LLC to Provide an Overview of the Hermes 2 Construction Permit Application ML23181A0422023-07-0606 July 2023 June 6 and 14, 2023 Summary of the Closed Meetings with Kairos Power Regarding Section 106 Consultations ML23156A6682023-06-0606 June 2023 Summary of February 9, 2022, Public Meeting on the Kairos Herme Preliminary Safety Analysis Report ML23132A3042023-05-22022 May 2023 April 11, 2023 Summary of Closed Meeting with Kairos Power, LLC Regarding Consultations Under National Historic Preservation Act ML23031A1602023-03-21021 March 2023 Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application ML22110A0182022-05-0505 May 2022 Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments 2024-01-08
[Table view] |
Text
APPLICANT: Kairos Power, LLC
SUBJECT:
SUMMARY
OF APRIL 11, 2023, CLOSED MEETING WITH KAIROS POWER, LLC REGARDING CONSULTATIONS UNDER NATIONAL HISTORIC PRESERVATION ACT On April 11, 2023, a closed meeting was held via webinar between the U.S. Nuclear Regulatory Commission (NRC) staff, staff from the Pacific Northwest National Laboratory and representatives of Kairos Power, LLC (Kairos). The purpose of this meeting was to discuss information protected under Section 304 of the National Historic Preservation Act (NHPA). The meeting notice is available in the Agencywide Documents Access and Management System (ADAMS) ML3103A265. A list of meeting attendees is provided as an enclosure to this summary.
On December 6, 2022, the NRC received comments from a consulting Tribe on the Kairos Hermes Construction Permit Draft Environmental Impact Statement which recommended that a cultural resources survey be conducted for the proposed project. In its letter, the Tribe also informed NRC of its interest in acting as a consulting party and requested that the NRC include the Tribe in the development of the Archaeological Monitoring and Discovery Plan for the Kairos site (ML23031A036). The focus of the April 11th meeting was to discuss a submittal that Kairos is developing to support the NRCs ongoing consultations under NHPA Section 106 with the consulting Tribe, including relevant data analysis from existing soil samples and a draft version of the Archaeological Monitoring and Discovery Plan for the Kairos Hermes site. Kairos presented information from the submittal they are currently developing, following topics of interest provided earlier by the staff.
The NRC staff discussed potential concerns that the consulting Tribe might have regarding how the Kairos submittal would meet the reasonable and good faith identification standards in 36 CFR 800.4(b)(1). Representatives speaking on behalf of the Kairos submittal stated that they would include additional information in the submittal to address these concerns. May 22, 2023 Please direct any inquiries to me by phone at 301-415-2272, or via email at Tamsen.Dozier@nrc.gov.
Sincerely, Tamsen Dozier Environmental Project Manager Environmental Review New Reactor Branch Division of Rulemaking, Environmental and Financial Support Office of Nuclear Materials Safety and Safeguards Docket No. 0507513
Enclosure:
As stated Willingham, Laura signing on behalf of Dozier, Tamsen on 05/22/23
ML23132A304 Mtg. Summary *via e-mail OFFICE NMSS/REFS* NMSS:REFS* NMSS/REFS
NAME TDozier* AWalker-Smith JDavis* KErwin* TDozier DATE 5/12/23 5/15/23 5/17/23 5/22/23 5/22/23 LIST OF ATTENDEES
APRIL 11, 2023, CLOSED MEETING WITH KAIROS POWER, LLC
1:00 P.M. - 2:30 P.M.
Name Organization
Tamsen Dozier NRC Jennifer Davis NRC Peyton Doub NRC Kenneth Erwin NRC Chris Regan NRC John Moses NRC Benjamin Beasley NRC Jonathon Greives NRC Booma Venkataraman NRC Tara ONeil PNNL Doug McFarland PNNL Bo Saulsbury PNNL Martin Bryan Kairos Power Peter Hastings Kairos Power Darrell Gardner Kairos Power Austin Clarke Kairos Power Wayne Massie Kairos Power Antonio Fernandez Kairos Power Scott Seibel AECOM Keith Seramur Seramur & Associates
Enclosure