ML20126B513: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 64: Line 64:
subject: Transfer of Lead Office and Request for Assistance-TMI OTSB's Westinghouse Style Rolled Plugs          . .
subject: Transfer of Lead Office and Request for Assistance-TMI OTSB's Westinghouse Style Rolled Plugs          . .
ACTION PLAN:
ACTION PLAN:
NRR: (1) Assume lead responsibility for resolution of loose and missing Westinghouse rolled plugs identified by licensee in letter dated July 3, 1984 (Hukill, GPUM to Stolz, NRR)                                          ,
NRR: (1) Assume lead responsibility for resolution of loose and missing Westinghouse rolled plugs identified by licensee in {{letter dated|date=July 3, 1984|text=letter dated July 3, 1984}} (Hukill, GPUM to Stolz, NRR)                                          ,
                           -(2) Evaluate technical and safety aspects of loose and missing plugs identified at TMI-1. Evaluation should address licensee's inspection program and findings, lic'ensee's plans for operation, and repair
                           -(2) Evaluate technical and safety aspects of loose and missing plugs identified at TMI-1. Evaluation should address licensee's inspection program and findings, lic'ensee's plans for operation, and repair
                                 . program.                                        -
                                 . program.                                        -

Latest revision as of 13:20, 22 August 2022

Forwards Proposed Task Interface Agreement Requesting NRR Take Lead Responsibility for Review of once-through Steam Generator Plug Problem & Evaluate Licensee Analyses & Proposed Corrective Actions.Review Requested by Fall 1984
ML20126B513
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/15/1984
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20126B295 List: ... further results
References
FOIA-84-897 NUDOCS 8506140122
Download: ML20126B513 (4)


Text

'

s 4

bW l p meroy UNITED STATES f g(], %}

,j NUCLEAR REGULATORY COMMISSION REGION I

,4 631 PARK AVENUE Q\ 'f+' V

'*****,o' KING OF PRUSSIA, PENNSYLVANIA 19406 AUG 151984 Docket No. 50-289 MEMORANOUM FOR: Darrell G. Eisenhut, Director, Division of Licensing FROM: Richard W. Starostecki, Director, Division of Project and Resident Programs, Region I

SUBJECT:

- TMI-1 OTSG'S WESTINGHOUSE STYLE ROLLED PLUGS On Juns 25, 1984, it was discovered that OTSG tube number A-135-72 was not plugged in the upper tube sheet (plug later found in different tube), although it was required to be plugged and supposedly plugged in June 1983 with a Westinghouse Style Mechanical Rolled plug. A complete photographic verifica-tion of all plugged tubes containing this type plug was performed by the licensee following this discrepancy. This verification revealed that five additional Westinghouse plugs (three plugs in the "A" generator's lower tube sheet and two in the "B" generator's lower tube sheet) were missing. Discuss-ions with the licensee indicate a test program will be developed by GPUN Techn.ical Functions, in conjunction with Westinghouse, to ensure that the remaining plugs are in tact. In addition, a safety analysis is being prepared by GPUN Technical Functions, in conjunction with B&W, to confirm the prelimi-nary evaluation that the presence of the five missing roll.ed plugs in the bottom of the reactor vessel will not impair the thermal hydraulic performance of the reactor.

This forwards the proposed Task Interface Agreement (TIA) (Enclosure 1) requesting NRR take lead responsibility on review pf the TMI-1 OTSG plug problem and evaluate GPUN's analyses and proposed corrective actions. This review will need to be completed prior to the TMI start-up, estimated to be in the fall of 1984.

Region I has designated E. Conner (FTS 488-1355) as the point of contact for this TIA. ,7

(,. .

k Richard W. Starostecki, Director Division of Project and Resident l Programs, Region I cc w/ encl: ~

D. Crutchfield, AD/SA, NRR J. Stolz, Chief, ORB-4, NRR J. VanVliet, PM, ORB-4, NRR R. Wessman, TA, AD/SA, NRR

~

8506140122 850125 N

l PDR FOIA u g .-- ( >

DETJEN84-897 PDR J-g RdH

((: ,- s . .

~

y- . .

- Director, Division of-Licensing, NRR 2 becw/ enc 1:

' E. Greenman, DPRP

. E. Conner, DPRP .

R.. Conte, DPRP ~

- S. Ebneter, DETP.

- J.-Durr, DETP ,

DPRP; File 1.14 e 9 O

9 I

l- .

t

[ .

r I.

u t

f ,

4 ENCLOSURE 1 TASK NO.:

DATE:

PROPOSED TASK INTERFACE AGREEMENT TAC #: -

PROBLEM: TMI Missing OTSG's Westinghouse Rolled Plugs LEAD OFFICE O. I&E . d7 NRR O REGION O J0 INT NOTIFICATION:

REFERENCES:

Memo to D.'Eisenhut from R. Starosteckt dated . ,

subject: Transfer of Lead Office and Request for Assistance-TMI OTSB's Westinghouse Style Rolled Plugs . .

ACTION PLAN:

NRR: (1) Assume lead responsibility for resolution of loose and missing Westinghouse rolled plugs identified by licensee in letter dated July 3, 1984 (Hukill, GPUM to Stolz, NRR) ,

-(2) Evaluate technical and safety aspects of loose and missing plugs identified at TMI-1. Evaluation should address licensee's inspection program and findings, lic'ensee's plans for operation, and repair

. program. -

(3) Review the results of QPUN test program and safety analysis addressing this subject.

(4) Designate Lead Project Manager to assign TACs.and coordinate corre-spondence, meetings, and reports, if necessary. Prepare final report .

stating NRR findings to Region I-for closecut in NRC Inspection Report.

REGION I: (1) Inspect onsite inspection and repair activities, as appropriate.

t --

IE: (1) Prepare Bulletin or Notice, if appropriate. .

OFFICE COORDINATORS:

(X27207)

Gary Holahan (X27415)- R. Vollmer APPROVED: (X27817' G. Lainas

. (X )

R. Baer, I&E -

(X )

Richard W. Starostecki Region I (X28213) l

.. .e, 2

~

cc: V.IStello,ROGR J. Durr, RI H. Thompson, NRR R. Wessman, DL

- Regional Admins. .E. Conner, RI T. Speis, NRR G. Holahan, DL J. Heltemes, AE0D. R. Conte,-RI R. Mattson, DSI C.' McCracken,MTEB N. Grace, IE *'

, D. Eisenhut, NRR

.J. Taylor, I&E R. Vollmer, NRR-E. Jordan, I&E~ G. Lainas, NRR

, - R. Baer, I&E T. Novak, NRR .

E. Rossi,.-IE .

E. Case', NRR R. Baer,_IE E. Case, NRR J._VanV11et H. Silver 9

e G

% 9 O

O e

e

.