ML20126B784

From kanterella
Jump to navigation Jump to search
Submits Daily Highlight.On 840207,NRC Met W/Util to Learn Results of Util Investigation Into Steam Generator Problem & to Learn Util Proposed Repair Method
ML20126B784
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/08/1982
From: Jacobs R
Office of Nuclear Reactor Regulation
To: Carter J, Harold Denton, Eisenhut D
NRC
Shared Package
ML20126B295 List: ... further results
References
FOIA-84-897 NUDOCS 8506140213
Download: ML20126B784 (2)


Text

.

t j' { & J f k L Q et s $ u f l 5 + k

. mg '

30,, UNITED STATES a NUCLEAR REGULATORY COMMISSION 3 I wAsHmGTON, D. C. 20666 . .

April 8,1982

[

Docket No. 50- 289 I MEMORANDUM FOR: H. Denton S. Hanauer 4g ~ l191+

J. Carter R. Vollmer D. Eisenhut R. Mattson R. Purple H. Thompson I T Novak J. Sniez A G. Lainas c . topolito J R Tedesco C. Michelson C. Heltemes THRU: John F. Stolz, Chief, Operating Reactors Branch #4, Division of Licensing I:

! FROM: Richard H. Jacobs, Project Manager Operating Reactors Branch #4, Division of Licensing

,l

SUBJECT:

DAILY HIGHLIGHT 9

lI l

Three Mile Island Unit 1 (TMI-1) Steam Generator Repairs l The staff met with GPU yesterday to learn the results of GPU's investigation into the TMI-1 steam generator problem and to learn GPU's proposed repair method. The tube corrosion mechanism is stress assisted intergranular attack initiated from the primary side resulting in the development of I circumferential intergranular cracks. It is estimated that approximately i 8-10,000 out of 31,000 tubes in both steam generators are affected. All but about 70 defects are located within the upper tubesheet region of the

! tubes. The chemical agent which caused the attack was sulfur in a 4

reduced form.

i GPU announced that they plan to repair the defective tubes by expanding and resealing the tube walls at a location about 8-10 inches within the 24 inch tubesheet. The tubes would be either hydraulically, mechanically or explosively expanded and then rolled to create a pressure boundary seal .

By this method, the tube portion containing the vast majority of the defects is no longer a primary to secondary pressure boundary. The approximately 500 tubes with defects below the 10 inch level will .be plugged. Assuming this repair method is acceptable, GPU could repair the steam generators and make the plant ready for operation by about October 1982. <

! Because the corrosive attack was primary side initiated', GPU intends to l

conduct a comprehensive examination of susceptible materials in the reactor vesseland other parts of the reactor coolant system. The inspection of reactor vessel internals is scheduled to begin following vessel head removal early next week. The inspection involves radiographic, ultrasonic, penetrant and visual inspection techniques of a large number of components. At least two fuel assemblies will be removed to facilitate the inspection.

l l 8506140213 850125 PDR FOIA l DETJENS4-897 PDR l ,

h$

=.

o' s#

. ~.

I

'-1 Daily Highlight -

il 8,1982 .

GPU issued the attached press release yesterday which provides addit!onal details of the repair technique and the source of the sulfur contamination.

Richard H. Ja obs, Project M'anager Operating ctors Branch #4 l Division of Licensing 1

l

Attachment:

, GPU Press Release l cc w/attachmentf l