Docket No. 50-289-
,o..
u MEMORANLUM FOR:
H. Denton R. Vollmer"k
.- E. Case.
R. Mattson H. Thompson ('.
G. Edison '
D. Eisenhut
- 8. Snydec noenNs&ehash
, g.,
y R. Purple,J.o S. Lainas-S. Varge D. Vass.ll.. (
a o T.Novab-J. M111 erb ~~
~~
F. Miraglia1 D. Crutchfield,
T. Speis.
John F. Stoir, Chief, Operating Reactors Branch No. 4, FROM:
Division of Licensirg,
DAILY HIGHLIGHT - TMI-1
SUBJECT:
On June 25, the staff was informed by the licensee that primary to s
I leakage was detected in the "B" OTSG at.TMI-1 by chemical me baron and cesium in the secondary system.
The licensee with the RCS pressurized to about 50 psig"with nitrogen.
subsequently examined both the "B" and "A 0T a
the repaired tube to tubesheet interfaces.
1 Forthe"B"OTSG,onetube(80i-45)appearstobethesourceofmosto leakage (1.5 to 1.7 gal /hr. cold).
the repaired joint.
The lictnsee plans For the "A" 0TSG, three or four tubes show trace leak
~
remove it from service..
TMI-1 has conducted two hot functional tests since the repairs w
'T in July of 1963.
The licensee plans to submit a letter report on this matter within the few days.
8 hw F. Stolr. Chief' J
J perating Re: actors Branch No. 4 l
,' ' V.,
Division of Licensing' ~ -
T.
. Mr ~'~ ~
..r'...-
't-
'N'"
\\
.. ;, -.~'
'? '
850614010285b125
~ '
'S b
' '.'1 ' -
J-
~
DETs1EN84-897 PDR
' R~... l ~ a,.,..b.y.i; &9$W,y n.5.f f '.s. -
.g 7
~ ;,.
- g. m jy
~
L y_ __-