ML20128F533: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 15: | Line 15: | ||
| document type = APPLICATION, SENIOR OPERATOR LICENSE, TEXT-LICENSE APPLICATIONS & PERMITS | | document type = APPLICATION, SENIOR OPERATOR LICENSE, TEXT-LICENSE APPLICATIONS & PERMITS | ||
| page count = 4 | | page count = 4 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
Revision as of 21:34, 21 August 2022
Text
--- - - . - -_ - -_- - - _ - . - -
. #X%. s f
. --. ..-._..-- ..-.. .. .- . ... -. ---- T~~
v6:&- A
- 1.
- h .?t.V t
- g ?, / '
i .
5 a jj .-g_- m !
/
METROPOLITAN EDISON COMPANY m. - :" ci.m.<: '.. uc m, mu mumw' r / - --
TELEPHONE 717 944 4041 POST OFFICE DOX 480 MIDDLETOWN.PENNSYLV ANIA 17057 January 31, 1979 j Mr. Paul F. Collins U.S. Nuclear Regulatory Comission Office of fluclcar Reactor Regulation liashington, D.C. 20555
Dear Mr. Collins:
Please consider this application for a Senior Reactor Operator's 1.icense exanination. In accordance with Section 55.10 of 10CFR55, the following infomation is submitted: I 4
- 1. flame Jn Allen Brumer -
h Age: r Present Employment: Metropolitan Edison Company, Three Mile Island Itucicar Station, Unit II
- 2. a) Education:
- 1. Annville Cleona High School Graduated - Annville, Pa.
- 2. Tennessee Technilogical Univeristy Electrical Engineering - Graduated, okevill Tenn.
l b) Experience:
ical University f, 1. Tennessee Ter.hnilok11e, Tenn.
Caretaker - Cookev . formation m. this record was de Of Informatic Tennessee Technilogical University t exe pt on 2.
Proctor - Cookeville, Tenn. f0lA. - c77/ _
l 3. Engineer Jr. (3/74 - 6/75) - lictropolitan Edison Company Three fille Island flucicar Station, Middictown, Pa.
- 4. Engineer I (7/75 - 12/76) fletropolitan Edison Company.
Three !!ile Island Ifucicar Station, lliddletown, Pa. p' 9610000113 960924 PDR FOIA DEKOK96-207 PDR
s January 31, 1979 l
. tir. Paul F. Collins f
S. Engineer II (1/77 - present) - tictropolitan Edison company, 1 Three title Island Nuclear Station, fliddletown, Pa.
i As an Engineer II, I have been involved with the Unit II PORC which has approved the Operatirg Procedures, which are associated i itith the nuc1 car safety of the Unit, Surveillance Procedures and Unit Energency and Abnornal Procedures. l Ilhile holding this position I have also been responsibic for writing ,
and reviewing some of the Operating and Survie11ance Procedures ase.ociated with Instrumentation and Control dealing with such systems l
a', the Reactor Protection System, fluclear Instrumentation System, i flon-fluclear Instrumentation System, Radiation Monitoring System, and Engineered Safety Features System to mention a few. 1 l
During the startup and test phases of Unit II, I was responsible for !
performing the Test Procedures associated with the Radiation 11onitoring System. In addition, during the Power Escalation Phase I was the !
ICS Tuning Coordinator responsible for tuning associated with the Unit II Integrated Control Systen, which required constant interface j
with the Control Room.
Previous Opeartor's License flumber - flone. l 3.
- 4. License is requested to operate a pressurized water reactor; fietropolitan Edison Conpany Three Mile Island fluclcar Station, Unit II.
- 5. See attached letter.
- 6. See Enclosure 1.
- 7. liedical exanination will be forwarded under separate cover.
Sincerely yours,
$. buw i ^~
John A. Brummer JAD/dra Enclosure 4
,9~222
.[',
!:s
',6 ErlCLOSURE I TRAlfilflG PROGRAff RECEIVED BY:
John A. Drumer
The general outline of Mr. Drummer's training follows:
- 1. License Trainin Program (minimum 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />)(1/2/79present)
Reactor Theory 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />)
Health Physics 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />) l ICS (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)
Reactor Operations (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)
Systems (flSS and BOP) (200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)
Procedures (50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />)
Tech. Specs. (20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />)
- 2. PWR Simulator Training at Babcock and Wilcox Corporation with Startup (Startup Certification will be forwarded by Babcock Certification (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)(2/26/79 - 3/2/79 and 3/5/79 - 3/9/79) and tillcox Corporation)
- 3. OntheJobTraining(Minimum 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)
Participated in, simulated or discussed the following:
Procedures Operation
Surveillance
- 1. Idrote numerous Surveillance Procedures for Unit #2 for such systems as the following: Radiation lionitoring System,' Reactor Protection System, ilon-fluclear Instrumentaton, Engineered Safety Freatures Systens.
- 2. Provide technical supervisor for performance of Instrunentation and Control Surveillance Procedures.
- 1. Reviewed procedures as mentioned above.
- 2. Served as Instrumentation and Control reviewer during Tech. Spec. review of BfAl generic Tech. Specs. to develop Standard Tech. Specs. for Unit #2.
Control Room
- 1. Reactor Criticality - Performed calculation of estimated critical rod position.
- 2. Discussed rod withdrawal, chenical shim and the necessary rod index for power escalation and steady state conditions.
- 3. Power Operations
- 1. Performed Heat Balance Calculatinns
- 2. Perforned Reactor Coolant Total Flow Calculations
- 3. Olscussed and participated in Feed and Bleed Operations.
- 4. Discussed and perfor'med ICS Tuning at power to maintain steady-state
-)
lj operations. ~& 'gg
- -- .--.--..____-,_,^^*"*'""'^wme- - n.a__g.__ _
PAGE 2
.EpciosureI Transients i
- 1. Supervised transient test during power excalation program per TP800/23 such as follows:
i
- 1. Feedpump trip from 90% F.P. and recovery.
- 2. Step changes of 10% in magnitude using ULD, steam generator / reactor i demand station and turbine station.
- 3. Reactor coolant pump trip.
- 4. Load change from 95% F.P. to 50"..F.P. and recovery to 95%.
Balance-of-Plant _
- 1. Performed post-core load fuel verification.
- 2. Participated in reactor building fuel handling operations during core load.
i 1
e i
/
L p