| {{Adams | | {{Adams |
| | number = ML19322A009 | | | number = ML19353B357 |
| | issue date = 11/14/2019 | | | issue date = 12/19/2019 |
| | title = U.S. Nuclear Regulatory Commission Acknowledgement of Disputed Cited Violation 05000244/2019010-02 | | | title = U.S. Nuclear Regulatory Commission Acknowledgement of Disputed Cited Violation 05000244/2019010-02 - Receipt of Clarification Letter |
| | author name = Krohn P | | | author name = Krohn P |
| | author affiliation = NRC/RGN-I/DRS | | | author affiliation = NRC/RGN-I/DRS |
| | addressee name = Hanson B | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000244 | | | docket = 05000244 |
| | license number = DPR-018 | | | license number = DPR-018 |
| | contact person = Gray M | | | contact person = |
| | case reference number = EA-19-122 | | | case reference number = EA-19-122 |
| | document report number = IR 2019010 | | | document report number = IR 201910-02 |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
Line 22: |
Line 22: |
|
| |
|
| ==REGION I== | | ==REGION I== |
| 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 November 14, 2019 EA-19-122 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTED CITED VIOLATION 05000244/2019010-02 | | 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 December 19, 2019 EA-19-122 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTED CITED VIOLATION 05000244/2019010-02 - RECEIPT OF CLARIFICATION LETTER |
|
| |
|
| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
| I am writing to acknowledge receipt of Exelon Generation Company, LLCs (Exelons) letter dated October 16, 2019, in response to U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000244/2019010 issued on September 18, 2019 (ML19261A083)1. | | I am writing to acknowledge receipt of Exelon Generation Company, LLCs (Exelons) letter dated November 27, 2019, which clarifies Exelons original response to U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000244/2019010 issued on September 18, 2019 (ML19261A083) 1. |
|
| |
|
| In the letter (ML19291A173), Exelon contested a finding of very low safety significance (Green) | | In the original response letter (ML19291A173), Exelon contested a finding of very low safety significance (Green) and associated Notice of Violation (NOV 05000244/2019010-02) issued to R. E. Ginna Nuclear Power Plant (Ginna). The finding and violation involved a failure by Ginna to design or ensure that in the event of a design-basis earthquake, the safety-related Emergency Diesel Generator (EDG) Motor Control Centers (MCCs) H and J would not be lost due to an electrical circuit fault in the non-safety-related sump pump motors. In the clarification letter (ML19337A431), Exelon is requesting that the NRC make a decision regarding Exelons claim that Ginna is meeting its licensing basis. Based upon the results of the determination of whether the licensing basis is met or not, Exelon stated that it may contest the violation as a backfit. Exelon further stated that if the NRC determined that the issue did not constitute a backfit, Exelon may decide to appeal that determination as well. The NRC intends to review Exelons response and provide a letter documenting the basis for any decision relative to the disputed NOV. |
| and associated Notice of Violation (NOV 05000244/2019010-02) issued to R. E. Ginna Nuclear Power Plant (Ginna). The finding and violation involved a failure by Ginna to design or ensure that in the event of a design-basis earthquake, the safety-related Emergency Diesel Generator (EDG) Motor Control Centers (MCCs) H and J would not be lost due to an electrical circuit fault in the non-safety-related sump pump motors. Exelon stated that Ginna met the NRC's standards in effect at the time of its construction as well as those in effect at the time of Application for Full-Term Operating License (1972) and as such, Exelon views that the NOV is unwarranted and should be rescinded. Additionally, Exelon believes that the position reflected in the inspection report constitutes a backfit and asks that the NRC assess these concerns consistent with agency backfitting processes. The NRC intends to review Exelons response and provide a letter documenting the basis for any decision relative to the disputed NOV and backfitting. | |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available | | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available 1 Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS at https://adams.nrc.gov/wba/. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209; 301-415-4737, or by e-mail to pdr.resource@nrc.gov Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS at https://adams.nrc.gov/wba/. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209; 301-415-4737, or by e-mail to pdr.resource@nrc.gov Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |
|
| |
|
| Should you have any questions concerning this letter, please contact me at (610) 337-5081. | | Should you have any questions concerning this letter, please contact me at (610) 337-5081. |
Line 40: |
Line 37: |
| Paul G. Krohn, Deputy Director Division of Reactor Safety Docket No. 50-244 License No. DPR-18 cc: Distribution via ListServ | | Paul G. Krohn, Deputy Director Division of Reactor Safety Docket No. 50-244 License No. DPR-18 cc: Distribution via ListServ |
|
| |
|
| ML19322A009 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/EAGL RI/RC NAME KMangan via email MGray ECarfang RMcKinley BKlukan DATE 11/13/19 11/13/19 11/13/19 11/14/19 11/14/19 OFFICE RI/DRS NAME PKrohn DATE 11/14/19
| | ML19353B357 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRP RI/EAGL RI/RC RI/DRS NAME MGray ECarfang/jk RMcKinley BKlukan PKrohn DATE 12/18/19 12/18/19 12/18 /19 12/18 /19 12/19/19 |
| }} | | }} |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] |
Inspection Report - Ginna - 2019010 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 December 19, 2019 EA-19-122 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTED CITED VIOLATION 05000244/2019010-02 - RECEIPT OF CLARIFICATION LETTER
Dear Mr. Hanson:
I am writing to acknowledge receipt of Exelon Generation Company, LLCs (Exelons) letter dated November 27, 2019, which clarifies Exelons original response to U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000244/2019010 issued on September 18, 2019 (ML19261A083) 1.
In the original response letter (ML19291A173), Exelon contested a finding of very low safety significance (Green) and associated Notice of Violation (NOV 05000244/2019010-02) issued to R. E. Ginna Nuclear Power Plant (Ginna). The finding and violation involved a failure by Ginna to design or ensure that in the event of a design-basis earthquake, the safety-related Emergency Diesel Generator (EDG) Motor Control Centers (MCCs) H and J would not be lost due to an electrical circuit fault in the non-safety-related sump pump motors. In the clarification letter (ML19337A431), Exelon is requesting that the NRC make a decision regarding Exelons claim that Ginna is meeting its licensing basis. Based upon the results of the determination of whether the licensing basis is met or not, Exelon stated that it may contest the violation as a backfit. Exelon further stated that if the NRC determined that the issue did not constitute a backfit, Exelon may decide to appeal that determination as well. The NRC intends to review Exelons response and provide a letter documenting the basis for any decision relative to the disputed NOV.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available 1 Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS at https://adams.nrc.gov/wba/. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209; 301-415-4737, or by e-mail to pdr.resource@nrc.gov Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (610) 337-5081.
Sincerely,
/RA/
Paul G. Krohn, Deputy Director Division of Reactor Safety Docket No. 50-244 License No. DPR-18 cc: Distribution via ListServ
ML19353B357 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRP RI/EAGL RI/RC RI/DRS NAME MGray ECarfang/jk RMcKinley BKlukan PKrohn DATE 12/18/19 12/18/19 12/18 /19 12/18 /19 12/19/19