Exelon Generation~
November 27, 2019 U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTN: Document Control Desk R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Paul M. Swift S1te Vice President R E G1nna Nuclear Power Plant 1503 Lake Rd Ontano. NY 14519 315 ]915200 Office www exeloncorp ccm paul sw1ft@exeloncorp com
Subject:
Clarification to Reply to Notice of Violation 05000244/2019010-02
References:
- 1) "R. E. Ginna Nuclear Power Plant - Design Bases Assurance Inspection (T earns) Report 05000244/201901 O and Notice of Violation," dated September 18, 2019
- 2) Letter from Paul M. Swift (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission, "Reply to Notice of Violation 05000244/2019010-02," dated October 16, 2019 In Reference 1, the U.S. Nuclear Regulatory Commission identified a Notice of Violation (NOV) for the Ginna Nuclear Power Plant. This Green NOV (NOV 05000244/2019010-02) cited a violation of Title 1 O of the Code of Federal Regulations (1 O CFR), Part 50, Appendix B, Criterion Ill, "De.sign Control."
In Reference 2, Exelon Generation Company, LLC (EGC) contested this violation. As a clarification to Reference 2, Exelon is requesting the NRC to make a decision regarding EGC's claim that we meet our licensing ba$is. If the NRC concludes that we are n_ot meeting our licensing basis and intends to maintain the NOV, then EGC contends that the NRC is imposing a backfit. EGC may then decide to appeal that NRC determination, using the provisions of the Backfit Rule (10 CFR 50.109).
Respectfully, Paul M. Swift Site Vice President cc:
Director, Office of Enforcement Regional Administrator, Region 1 NRC Resident Inspector