R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2019410
ML19326A071
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/21/2019
From: Fred Bower
Plant Support Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Bower F
References
IR 2019410
Download: ML19326A071 (8)


Text

November 21, 2019

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2019410

Dear Mr. Hanson:

On October 24, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R. E. Ginna Nuclear Power Plant and discussed the results of this inspection with Mr. Paul Swift, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000244 License No. DPR-18

Enclosure:

As stated

Inspection Report

Docket Number:

05000244

License Number:

DPR-18

Report Number:

05000244/2019410

Enterprise Identifier: I-2019-410-0029

Licensee:

Exelon Generation Company, LLC

Facility:

R. E. Ginna Nuclear Power Plant

Location:

Ontario, NY

Inspection Dates:

October 21, 2019 to October 24, 2019

Inspectors:

D. Caron, Sr Physical Security Inspector

S. McCarver, Physical Security Inspector

J. Rey, Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R. E. Ginna Nuclear Power Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1) Tier I All Requirements

Tier II 6 Requirements (02.05 a, b, 02.06 a, b, 02.07 a, b)

Tier III 4 Requirements (02.09, 02.10 b, 02.11 a, b)

71130.02 - Access Control

The inspectors evaluated the security access control program. The following elements were

===evaluated:

Access Control===

(1) Tier I All Requirements

Tier II 8 Requirements (02.06 a - d, 02.07 a, 02.08 a - c)

Tier III 1 Requirement (02.10 a)

71130.06 - Protection of Safeguards Information

The inspectors evaluated the safeguards information protection program. The following elements were evaluated:

Protection of Safeguards Information (1 Sample)

(1) Tier I All Requirements

Tier II 5 Requirements (02.04 a, b, 02.05 a, b, 02.06)

Tier III 3 Requirements (02.08, 02.09 a, b)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program. The following elements were evaluated:

Fitness For Duty Program

(1) Tier I All requirements

Tier II 26 requirements (02.05 a - k, 02.06 a - e, g, 02.07 a - e, 02.08 a, 02.09 a, b, d)

Tier III 6 requirements (02.12 a, 02.13 a - c, 02.14 a, c)

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

The inspectors verified the licensees Protected Area Security Equipment Performance Index submittals.

(1) Fourth quarter of 2018 through the third quarter of

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 24, 2019, the inspectors presented the security baseline inspection results to Mr. Paul Swift, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

04194159

205891

Procedures

SY-AA-103-500

Access Authorization Program

Revision 15

SY-AA-103-507

Review Criteria for Unescorted Access

Revision 5

SY-AA-103-511

Access Authorization In-Processing/Out Processing of

Personnel

Revision 25

71130.02

Corrective Action

Documents

04147076

Miscellaneous

RE Ginna Nuclear Power Plant Security Plan, Training and

Qualification Plan, Safeguards Contingency Plan, and ISFSI

Security Program

Revision 11

Procedures

SY-AA-101-1004

Protected Area Search Processes

Revision 2

SY-AA-101-102

Compensating for Security System Failures

Revision 16

SY-AA-101-109

Response to Contingency Events, Event 20

Revision 15

SY-AA-101-112

Exelon Security Search Processes

Revision 36

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

Revision 2

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 31

SY-AA-101-120

Control of Security Access Control Devices

Revision 9

SY-AA-101-124

Operation of the Security Control Centers

Revision 14

SY-AA-101-132-

F-02

Two Person Line of Sight Implementation Checklist

Revision 2

SY-AA-103-514

Site Authorization for Unescorted Access

Revision 19

SY-GI-101-116,

Conducting

Patrols and

Tours, Revision 9

Conducting Patrols and Tours

Revision 9

Self-Assessments NOSA-GIN-18-02

Security Programs Audit Report

2/13/2018

NOSA-GIN-18-08

Fitness for Duty, Access Authorization, and Corporate

Security Audit Report

08/21/2018

NOSA-GIN-19-02

Security Programs Audit Report

2/20/2019

71130.06

Procedures

SY-AA-101-106

Control and Classification of Safeguards Information and

Revision 21

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Sensitive Unclassified Non-Safeguards Information

71130.08

Corrective Action

Documents

04163467

04194281

203236

203240

Miscellaneous

Medical Review Officer Certification

Substance Abuse Experts Certifications

Procedures

SY-AA-102

Exelon Generation Fitness for Duty Program

Revision 21

SY-AA-102-203

Treatment Plan and Follow-Up Testing

Revision 7

SY-AA-102-204

Random Selection and Notification Process

Revision 13

SY-AA-102-206

Reporting the Use of Medication

Revision 10

SY-AA-102-222

Handling and Storage of FFD Records

Revision 11

SY-AA-102-226

Test Results and MRO Response

Revision 11

SY-AA-102-230

Designated Collection Facility

Revision 9

SY-AA-102-240

Collection of Specimens for Testing in an Exelon Facility

Revision 15

71151

Procedures

LS-AA-2160

Monthly Data Elements for NRC Protected Area Security

Equipment Performance Index

Revision 4