May 3, 2019
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - POST-APPROVAL SITE INSPECTION
FOR LICENSE RENEWAL - PHASE 4 INSPECTION REPORT
Dear Mr. Hanson:
On March 22, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a Post-Approval Site Inspection for License Renewal - Phase 4 inspection at your R. E. Ginna Nuclear Power Plant and discussed the results of this inspection with Paul Swift, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mel Gray, Branch Chief
Engineering Branch 1
Division of Reactor Safety
Docket No.: 50-244 License No.: DPR-18
Enclosure:
Inspection Report 05000244/2019011
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier: I-2019-011-0021
Licensee:
R. E. Ginna Nuclear Power Plant, LLC
Facility:
R. E. Ginna Nuclear Power Plant
Location:
Ontario, New York
Inspection Dates:
March 17, 2019 to March 23, 2019
Inspectors:
K. Mangan, Senior Reactor Inspector (Team Lead)
M. Orr, Reactor Inspector
S. Pindale, Senior Reactor Inspector
Approved By:
Mel Gray, Branch Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Post-Approval Site Inspection for License Renewal - Phase 4 inspection at R. E. Ginna Nuclear Power Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.
List of Findings and Violations
No findings were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2516, Policy and Guidance for the License Renewal Inspection Program. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71003 - Post-Approval Site Inspection for License Renewal
The team selected for evaluation six aging management programs. The team selection of programs was based on risk insights and programs that were enhanced or new under the renewed operating license. The team also considered for selection those programs with monitoring results that were performed for the first time or identified examination or test results not experienced in the past. The inspection performed by the team was conducted as outlined in NRC IP 71003, Phase IV. For the aging management programs selected, the team reviewed records, interviewed plant staff, and conducted plant walk downs to evaluate whether aging management program elements were being implemented in accordance with NRC requirements. The team evaluated the following elements of the aging management program:
scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.
The following aging management programs were evaluated by the team:
Post-Approval Site Inspection for License Renewal===
- (1) Flow-Accelerated Corrosion
- (2) Buried Piping and Tanks Inspection
- (3) Inaccessible Medium-Voltage Cables not Subject to 10 CFR 50.49 Equipment Qualification Requirements
- (4) Periodic Surveillance and Preventative Maintenance
- (5) ASME Section XI, Subsection IWE & IWL Inservice Inspection
- (6) Structures Monitoring
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 22, 2019, the team conducted an exit meeting and presented the inspection results to Mr. Paul Swift, Plant Manager and other members of the licensee staff.
DOCUMENTS REVIEWED
Completed Tests
M-15.10, 1A or 1B EDG Underground Fuel Oil Storage Tank Leak Tightness Testing, performed
5/24/18 and 7/27/18
M-15.1P, A or B Diesel Generator Fuel Oil System Inspection and Maintenance, performed
10/5/10 and 11/12/10
Corrective Action Documents
01701480
01929169
01947095
2327025
2331893
2333633
2441684
2530386
2530472
2576330
2617311
2631315
2634324
04003135
04035603
04164593
04197672
214674
218210
228497
2007-004949
2009-007043
2011-000463
2011-001542
2011-001543
2011-001544
2011-002037
2011-002932
2011-003069
Drawings
33013-2112, Plant Arrangement Turbine Building Plan - Basement Floor, Revision 0
33013-2539, AC System Plant Load Distribution One Line Wiring Diagram, Revision 30
Miscellaneous
Buried Pipe Cathodic Protection Performance Indicators, Annual Report, January 2019
ECP-15-000715, Technical Evaluation, dated 1/7/16
FAC Program Performance Indicators, Annual Report, January 2019
GA-N1059-501, Final Report for Ginna Nuclear Power Plant 2010 Containment Building Tendon
Surveillance, Revision 0
GNP010-C-1, Reactor Building Slab Analysis, Revision 1
ISR NL-2007-000081-017, Cast Iron - Raw Water Drainage, Revision 0
ISR NL-2007-000081-020, Carbon Low Alloy Steel - Raw Water, Revision 0
ISR NL-2007-000081-021, Carbon Low Alloy Steel - Treated Water Other, Revision 0
ISR NL-2007-00081-019, Carbon Low Alloy Steel - Air and Gas >140F & <140F (Wetted),
Revision 0
LRAM-ELECTPAS, License Renewal Aging Management Review Report for Electrical/I&C
Components, Revision 0
RE Ginna Updated Final Safety Analysis Report Chapter 18 - Supplement for License Renewal,
Revision 19
Reactor Cavity Leakage Walkdown Notes, 5/3/11
REP-1125-510, Suburban Laboratories, Inc. Analyses of Unit 1 Tendon Grease Samples
dated 5/27/16
Work Orders
C20705037
C20805914
C90672977
C90679533
C91467532
C91468358
C92072823
C92099897
C92099962
C92507446
C92594624
C92784945
C92846392
C92999194
C93217152
C93225184
C93243561
C93266300
C93411926
C93619409
C93619722
C93620777
C93624469
C93634366
C93635952
Procedures
EP-2-P-0169, Structural Assessment and Monitoring Program, Revision 19
EP-VT-113, Visual Examination of Class CC Concrete Components (IWL), Revision 00101
ER-AA-310, Implementation of the Maintenance Rule, Revision 12
ER-AA-335-018, Visual Examination of ASME IWE Class MC and Metallic Liners of IWL
Class CC Components, Revision 13
ER-AA-430, Conduct of Flow Accelerated Corrosion Activities, Revision 7
ER-AA-430-1001, Guidelines for Flow Accelerated Corrosion Activities, Revision 11
ER-AA-450, Structures Monitoring, Revision 7
ER-AA-5400, Underground (Buried) Piping and Raw Water Integrity Management Programs
Guide, Revision 11
LR-BTNK-PROGPLAN, Ginna Station License Renewal Project Buried Piping and Tanks
Inspection Program, Revision 5
LR-FAC-PROGPLAN, Ginna Station License Renewal Project Flow Accelerated Corrosion
Program, Revision 3
LR-IMVC-PROGPLAN, Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49
Environmental Qualification Requirements [XI.E3], Revision 3
LR-IWEL-PROGPLAN, ASME Section XI, Subsections IWE & IWL Inservice Inspection,
Revision 5
LR-OTI-PROGPLAN, One-Time Inspection Program, Revision 6
LR-PSPM-PROGPLAN, Periodic Surveillance and Preventive Maintenance Program, Revision 7
LR-STRM-PROGPLAN, Structures Monitoring Program, Revision 7
LR-SYSN-PROGRAM, Systems Monitoring Program, Revision 5
STP-O-22.1, Local Leak Rate Testing of Equipment Hatch Door Seal, Revision 00202
STP-O-27.2, Tendon Surveillance Program, Revision 00400