ML080850867: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML080850867
| number = ML080850867
| issue date = 03/25/2008
| issue date = 03/25/2008
| title = 04/16/2008 Notice of Meeting with PPL Susquehanna, Llc., to Discuss Annual Assessment of Safety Performance of Calendar Year 2007
| title = Notice of Meeting with PPL Susquehanna, Llc., to Discuss Annual Assessment of Safety Performance of Calendar Year 2007
| author name = Krohn P
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:MN No. 08-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2008 Licensee:            PPL Susquehanna, LLC Facility:            Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos.:          50-387 and 50-388 Date/Time:            April 16, 2008 at 2:30 p.m.
{{#Wiki_filter:MN No. 08-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2008 Licensee:            PPL Susquehanna, LLC Facility:            Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos.:          50-387 and 50-388 Date/Time:            April 16, 2008 at 2:30 p.m.
Location:            Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603 Purpose:             The NRC requested an Annual Assessment Meeting with PPL to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station for calendar year 2007. The NRCs assessment is documented in a letter dated March 3, 2008.
Location:            Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603
 
==Purpose:==
The NRC requested an Annual Assessment Meeting with PPL to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station for calendar year 2007. The NRCs assessment is documented in a letter dated March 3, 2008.
Attendees*:
Attendees*:
NRC:        P. Krohn, Chief, Projects Branch 4, Region I F. Jaxheimer, Senior Resident Inspector, Susquehanna G. Ottenberg, Resident Inspector, Susquehanna Licensee:    B. McKinney, Senior Vice President and Chief Nuclear Officer C. Gannon, Vice President, Nuclear Operations R. Pagodin, General Manager, Nuclear Engineering R. Paley, General Manager, Plant Support R. Smith, General Manager, Site Preparedness and Services Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC:        P. Krohn, Chief, Projects Branch 4, Region I F. Jaxheimer, Senior Resident Inspector, Susquehanna G. Ottenberg, Resident Inspector, Susquehanna Licensee:    B. McKinney, Senior Vice President and Chief Nuclear Officer C. Gannon, Vice President, Nuclear Operations R. Pagodin, General Manager, Nuclear Engineering R. Paley, General Manager, Plant Support R. Smith, General Manager, Site Preparedness and Services Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Meeting Contact:     Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov
Meeting
 
==Contact:==
Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov


2 The NRCs assessment letter can be found in ADAMS with Accession Number ML080600418.
2 The NRCs assessment letter can be found in ADAMS with Accession Number ML080600418.

Latest revision as of 08:39, 7 December 2019

Notice of Meeting with PPL Susquehanna, Llc., to Discuss Annual Assessment of Safety Performance of Calendar Year 2007
ML080850867
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/25/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN, PG
References
Download: ML080850867 (4)


Text

MN No.08-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2008 Licensee: PPL Susquehanna, LLC Facility: Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos.: 50-387 and 50-388 Date/Time: April 16, 2008 at 2:30 p.m.

Location: Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603

Purpose:

The NRC requested an Annual Assessment Meeting with PPL to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station for calendar year 2007. The NRCs assessment is documented in a letter dated March 3, 2008.

Attendees*:

NRC: P. Krohn, Chief, Projects Branch 4, Region I F. Jaxheimer, Senior Resident Inspector, Susquehanna G. Ottenberg, Resident Inspector, Susquehanna Licensee: B. McKinney, Senior Vice President and Chief Nuclear Officer C. Gannon, Vice President, Nuclear Operations R. Pagodin, General Manager, Nuclear Engineering R. Paley, General Manager, Plant Support R. Smith, General Manager, Site Preparedness and Services Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Meeting

Contact:

Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov

2 The NRCs assessment letter can be found in ADAMS with Accession Number ML080600418.

This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML080850867. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html .

Additional information relative to the NRCs Annual Assessment process and the safety performance of Susquehanna Steam Electric Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html .

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by April 14, 2008, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved By: ____/RA/____________

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

B. McKinney, Senior Vice President, and Chief Nuclear Officer C. Gannon, Vice President, Nuclear Operations R. Paley, General Manager, Plant Support R. Pagodin, General Manager, Nuclear Engineering R. Sgarro, Manager, Nuclear Regulatory Affairs R. Smith, General Manager, Site Preparedness and Services M. Crowthers, Supervising Engineer, Nuclear Regulatory Affairs R. Peal, Mgr, Training, Susquehanna M. Rose, Manager, Quality Assurance J. Scopelliti, Community Relations Manager, Susquehanna B. Snapp, Esq., Associate General Counsel, PPL Services Corporation Supervisor, Document Control Services R. Osborne, Allegheny Electric Cooperative, Inc.

D. Allard, Dir, PA Dept of Environmental Protection Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee, Sierra Club E. Epstein, TMI-Alert (TMIA)

J. Powers, Dir, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency

3 Agenda NRCs Annual Assessment Meeting Susquehanna Steam Electric Station April 16, 2008 Introduction .......................................................................................................NRC (3 minutes)

Review of Reactor Oversight Process ................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Susquehanna Performance ........................................................NRC (15 minutes)

PPL's Response and Remarks ..........................................................................PPL (30 minutes)

Closing Remarks ................................................................................................NRC (5 minutes)

Short Break ................................................................................................................ (5 minutes)

NRC to address public questions ..................................NRC/Members of the Public (as needed)

ML080850867 Document Name: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP-7 EOC\2007 AAM Meeting Notices\SSES 2007 AAM Meeting Notice Rev0.doc SUNSI Review Complete: __PGK__________ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME FJaxheimer/fj PKrohn/pgk DATE 03/25 /08 03/ 25/08