ML082730911: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
{{#Wiki_filter:11~ | {{#Wiki_filter:11~ | ||
~, ..- | ~, ..- | ||
Dominion Resources Services, Inc. | Dominion Resources Services, Inc. | ||
DOIII Inlon'" | DOIII Inlon'" | ||
SIIIIII Dominion Boulevard, Glen Allen. V\'.\, ,.,r " | SIIIIII Dominion Boulevard, Glen Allen. V\'.\, ,.,r " | ||
\X cb Address: www.dom.com September 29, 2008 United States Nuclear Regulatory Commission Serial No.: 08-0436A Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket No.: 50-336 License No.: DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. | \X cb Address: www.dom.com September 29, 2008 United States Nuclear Regulatory Commission Serial No.: 08-0436A Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket No.: 50-336 License No.: DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. | ||
Line 40: | Line 38: | ||
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments reftardin~ burden estimate to the Records and FOIAIPrivacy Services Branch ( -5 F 3), U.S. | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments reftardin~ burden estimate to the Records and FOIAIPrivacy Services Branch ( -5 F 3), U.S. | ||
OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-0001, or b~ internet e-mail to in ocollects@nrc'gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrng1on, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-0001, or b~ internet e-mail to in ocollects@nrc'gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrng1on, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | ||
FACILITY NRC REGION Millstone Power Station Unit 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 CY 12 CY 09 | FACILITY NRC REGION Millstone Power Station Unit 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 CY 12 CY 09 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 11 12 CY 09 CY 10 | ||
-- -- CY NUMBER OF REACTOR 4 4 0 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 0 3 | |||
ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 11 12 | |||
CY 09 CY 10 | |||
-- -- CY | |||
NUMBER OF REACTOR 4 4 0 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 0 3 | |||
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 6 2 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/19/2009 06/14/2010 ALTERNATE DATE 01/26/2009 06/28/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED -_.- ~ - ~ ~ | OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 6 2 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/19/2009 06/14/2010 ALTERNATE DATE 01/26/2009 06/28/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED -_.- ~ - ~ ~ | ||
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER}} | NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER}} |
Latest revision as of 20:05, 12 March 2020
ML082730911 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 09/29/2008 |
From: | Funderburk C Dominion, Dominion Nuclear Connecticut, Dominion Resources Services |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
08-0436A, RIS-08-016 | |
Download: ML082730911 (3) | |
Text
11~
~, ..-
Dominion Resources Services, Inc.
DOIII Inlon'"
SIIIIII Dominion Boulevard, Glen Allen. V\'.\, ,.,r "
\X cb Address: www.dom.com September 29, 2008 United States Nuclear Regulatory Commission Serial No.: 08-0436A Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket No.: 50-336 License No.: DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 2 NRC REGULATORY ISSUE
SUMMARY
2008*16 CORRECTION TO SUBMITTAL FOR PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS On August 14, 2008, Dominion Nuclear Connecticut, Inc. (DNC) submitted the requested NRC Form 536, "Operator Licensing Examination Data" for Millstone Power Station Unit 2 in response to NRC Regulatory Issue Summary 2008-16. The information submitted incorrectly reported zero as the "Estimated Number of Licensee-Prepared Examinations." The actual number of licensee-prepared examinations needed is one for Calendar Year 2009.
Enclosed is the corrected "Operator Licensing Examination Data" form for Millstone Power Station Unit 2. DNC apologizes for any inconvenience this may have caused.
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.
Very truly yours,
(~-
C. L. Funderburk Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
for Dominion Nuclear Connecticut, Inc.,
Attachment
SN 08-0436A Scheduling of Operator Licensing Examinations cc page 1 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ms. C. J. Sanders Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Unit 2
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments reftardin~ burden estimate to the Records and FOIAIPrivacy Services Branch ( -5 F 3), U.S.
OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-0001, or b~ internet e-mail to in ocollects@nrc'gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrng1on, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Millstone Power Station Unit 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 CY 12 CY 09 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 11 12 CY 09 CY 10
-- -- CY NUMBER OF REACTOR 4 4 0 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 0 3
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 6 2 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/19/2009 06/14/2010 ALTERNATE DATE 01/26/2009 06/28/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED -_.- ~ - ~ ~
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER