8:00 AM Daily Reactor Oversight Coordination Meeting - August 20, 2012 Date Added Lead Branch Plant/Issue/Status 83 MS-U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp 8 limit of 75 degrees, Mode 5 Cold Shutdown Events, Significant 8/13/12 PB6 TMI-Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Safety Issues, and 8/13/12 PB4

_- Dry fuel storage transfer trailer detected with removable contamination Operational Challenges 8/13/12 PB6 1 TMI-Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews 6/21/12 PB1 1 NMP - U1 AL3 UIL 0.34 gpm 7/09/12 PB6 TMI - AL3 UIL 0.17 gpm; downpower 8/23 Plant Status Items 8/07/12 PB4 SQ - U1 UIL 0.39 gpm (first 90 days) of Interest 8/13/12 PB4 LM-U1 LP Turbine Blade Inspection 8/31 8/20/12 PB2 IP - U2 21CP Freeze Seal/Operator Performance HC - CDBI 7/30, 8/13, 8/27 Salem/HC - 95002 8/27 Team Inspections OC - PI&R 8/13 & 8/27 MS-95001 9/10 e 1/03/12 EB1/PB3 SB - ASR resolution: 1) CAL Follow-up INSP in progress; 2) Working group priority High Profile 1Issues:

TIA, deviation memo, technical issues position papers Coordination 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Activities 7/12/12 PB1 CC-Magwood visit to site 8/23 G:\\DRP\\MorninR Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx

7/31/12 DM Rgo himnvst91 PB2 IP - Magwood visit 9/13 8/02/12 DRM j

efifion - Chairman visit 9/13 8/16/12 P61 jCC -GAO visit to site 9/25 8/16/12 PB4 EB:.-fipostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests Due 2515/177 ECCS Gas Accumulation - 96% complete, pending at BV e2/31/12 2515/185 Follow-up on Industry's Groundwater Protection Initiative Due 12/31/12 TI Status 2516/001 Review of License Renewal Activities (1P2)

Due (1st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns Due 12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns Due 12/31/13 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Due Underground Piping and Tanks -50%

06/30/14 General Announcements and Other Items of Interest G:\\DRP\\Morning Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx

Weekend Coverage DRP:

DRS:

SLO:

RDO:Cook PAO:

(Thursdays) 10/2011 PB6 TMI - Flood evaluation review (PI&R sample)

Long-Term Items of 5/29/12 PB4 LM & Q - Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP - ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12 PB2 FP - Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP - U1 Tritium leak, no identified source

" NRR/OpE

" Off-line security issues Following the meeting please select file and send email to Geor~qe.Wilson(,nrc.qov G:\\DRP\\Morning Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx