8:00 AM Daily Reactor Oversight Coordination Meeting-August 16, 2012 Date Added Lead Branch Plant/Issue/Status 8/13/12 PB1 CC-U1 Tech Spec required shutdown due to CEA #9 dropped MS-U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp Events, Significant 8limit of 75 degrees, Mode 5 Cold Shutdown Safety Issues, and 8/13/12 PB6 TMI-Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational Challenges 8/13/12 PB4 SUS-Dry fuel storage transfer trailer detected with removable contamination Fi 8/13/12 PB6 1 TMI-Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews 6/21/12 PB1 NMP - U1 AL3 UIL 0.35 gpm 7/09/12 PB6 TMI - AL3 UIL 0.16 gpm; downpower 8/22 Plant Status Items PlaIntetsIte 8/07/12 PB4 S

- U2 UIL 0.35 gpm (first 90 days) 8/13/12 PB4 LM-U1 LP Turbine Blade Inspection 8/23 HC-CDBI 7/30, 8/13, 8/27 Salem/HC - 95002 8/27 Team Inspections OC - PI&R 8/13 & 8/27 MS-95001 9/10 1/03/12 *EB1/PB3 SB - ASR resolution: 1) CAL Follow-up INSP in progress; 2) Working group priority 1/03/12 Profe Issues: TIA, deviation memo, technical issues position papers High Profile 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Actrivities 7/12/12 PB1 CC - Magwood visit to site 8/23 7/31/12 PB2 IP -

Magwood visit 9/13 GAMDP\\Morning Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx

8/02/12 DRM 1 Region - Chairman visit 9/13 8/16/12 PB1 CC - GAO visit to site 9/25 8/16/12 PB4 jPB -- Apostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests 2515/177 ECCS Gas Accumulation - 96% complete, pending at BV Due 12/31/12 2515/185 Follow-up on Industry's Groundwater Protection Initiative Due 12/31/12 TI Status 2516/001 Review of License Renewal Activities (1P2)

Due 12/31/13 (1st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns 12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns Due 12/31/13 Review of the Implementation of the Industry Initiative to Control Degradation of Due 2515/182 0/01 Underground Piping and Tanks -50%

06/30/14 General Announcements and Other Items of Interest G:\\DRP\\Morning Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx

Weeend CoverageI (Thursdays)

DRP: Clifford DRS: Wilson 51:

RDO: Powell PAO: Sheehan 10/2011 11PB6 TM__I - Flood evaluation review (PI&R sample)

Long-Term Items of 5/29/12 PB4 LM & 5O - Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP - ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12

,3PB2 FP - Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP - U1 Tritium leak, no identified source

" NRR/OpE