ML13032A131
| ML13032A131 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/21/2012 |
| From: | NRC/RGN-I/DRP/PB5 |
| To: | |
| References | |
| FOIA/PA-2013-0045 | |
| Download: ML13032A131 (3) | |
Text
8:00 AM Daily Reactor Oversight Coordination Meeting - August 21, 2012 Date Added Lead Branch Plant/Issue/Status MS-U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp 8/13/12 PB5 limit of 75 degrees, Mode 5 Cold Shutdown Events, Significant 8/13/12 PB6 TMI-Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Safety Issues, and 8/13/12 PB4 S-Dry fuel storage transfer trailer detected with removable contamination Operational Challenges 8/13/12 PB6 TMI-Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews 6/21/12 PB1 NMP - U1 AL3 UIL 0.34 gpm 7/09/12 PB6 TMI - AL3 UIL 0.14 gpm; downpower 9/24 Plant Status Items 8/07/12 PB4 5g - U1 UIL 0.39 gpm (first 90 days) of Interest 8/13/12 PB4 LM-U1 LP Turbine Blade Inspection 8/31 8/20/12 PB2 IP - U2 21CP Freeze Seal/Operator Performance HC - CDBI 7/30, 8/13, 8/27 Salem/HC - 95002 8/27 Team Inspections OC - PI&R 8/13 & 8/27 MS-95001 9/10 1/03/12 EB1/PB3 SB - ASR resolution: 1) CAL Follow-up INSP in progress; 2) Working group priority High Profile
'Issues:
TIA, deviation memo, technical issues position papers Coordination 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Activities 7/12/12 PB1 CC - Magwood visit to site 8/23 G:\\DRP\\MorninR Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx
.00 De~ei~-
7/31/12 PB2 IP - Magwood visit 9/13 8/02/12 DRM Region - Chairman visit 9/13 8/16/12 PB1 CC - GAO visit to site 9/25 8/16/12 PB4 PB -- Apostolakis visit 10/3 8/21/12 PB4 S__ - Lou Barletta visit 8/24; licensee sponsored visit Daily Notes & One-Week Look Aheads FOIA Requests 2515/177 ECCS Gas Accumulation - 96% complete, pending at BV 1D1111 Due 2515/185 Follow-up on Industry's Groundwater Protection Initiative 12/31/12 Due TI Status 2516/001 Review of License Renewal Activities (1P2) 12/31/13 (1St Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns 12/31/13 Due 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 12/31/13 Review of the Implementation of the Industry Initiative to Control Degradation of Due 2515/182 i0/01 Underground Piping and Tanks -50%
06/30/14 General Announcements and Other Items of Interest G:\\DRP\\MorninR Meeting Files\\New Format 2012\\June 2012\\06-14-2012.docx
Weekend Coverage D:"
(Thursdays)
DRP:
DRS:
SLO:
RDO:Cook PAO:
10/2011 PB6 TMI - Flood evaluation review (PI&R sample)
Long-Term Items of 5/29/12 PB4 LM & 5O - Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP - ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12 PB2 FP - Increasing tritium in RB perimeter sump; TI inspection in August are.updates) 8/16/12 PSB2 NMP - U1 Tritium leak, no identified source
" NRR/OpE
" Off-line security issues Following the meeting please select ie and send email to George.Wilson(&,nrc..qov G:\\DRP\\MorninR, Meetin2, Files\\New Format 2012\\June 2012\\06-14-2012.docx