ML071010098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Ap ril 10 , 20 07 M N No. 07-020 U.S. N U C L E A R R E GU L A TOR Y C OM M IS S ION REGI ON I NOT ICE O F LICENSEE M EET ING Li cen see:
{{#Wiki_filter:April 10, 2007 MN No. 07-020 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee:             Constellation Energy, LLC Facility:             Nine Mile Point Nuclear Station, Units 1 and 2 Docket No:           50-220, 50-410 Date/Time:           April 24, 2007, at 2:00 p.m.
Co nste ll ati on En ergy , LL C Fac il ity:
Location:             Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069 Purpose:             The NRC requested an Annual Assessment Meeting with Constellation management to discuss NRCs assessment of the safety performance of Nine Mile Point Units 1 and 2 for calendar year 2006. NRCs assessment is documented in a letter dated March 2, 2007.
Ni ne M il e P oi nt N ucl ear Sta tio n, U ni ts 1 an d 2 Do cket No:
Attendees*:
50-2 20, 50-4 10 D a te/Ti me:
NRC:         G. Dentel, Chief, Projects Branch 1, Division of Reactor Projects, Region I L. Cline, Senior Resident Inspector, Nine Mile Point Units 1 and 2 B. Bickett, Senior Project Engineer, Division of Reactor Projects E. Knutson, Resident Inspector, Nine Mile Point Units 1 and 2 Licensee:   J. Heffley, Senior Vice President and Chief Nuclear Officer K. Nietmann, Vice President - Nine Mile Point J. Carlin, Vice President - Nuclear Technical Services M. Schimmel, Plant General Manager - Nine Mile Point Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
A p ri l 2 4 , 2 0 0 7 , a t 2:0 0 p.m.L o ca ti o n:
NRCs assessment letter can be found in ADAMS with an Accession Number of ML070610616.
Jo i n t N e w s C e n te r Os w e go C o u n ty A i rp o rt Co unty R oute 17 6 Ful ton, NY 13 069 Pu rpos e:
This meeting notice with the enclosed meeting agenda can be located in ADAMS with an Accession Number of ML071010098. The NRC slides for the meeting can be found under the Accession Number ML071010084. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.
The N RC reque sted an A nnu al A sse ssmen t M eeti ng w ith C ons tel la tio n mana gement to di scu ss NR C's a sse ssmen t of the safety pe rf ormanc e o f Ni ne M il e P oi nt U ni ts 1 an d 2 for cal end ar y ear 200 6. NR C's a sse ssmen t is do cumen ted in a le tter d ated M arch 2, 200 7.Atten dee s*:N R C:
G. D e n te l , C h i e f, P ro je ct s B ra n ch 1 , D i v i si o n o f R e a ct o r P ro je ct s, Re gion I L. C li ne, Se ni or R esi den t Ins pec tor, N in e M il e P oi nt U ni ts 1 an d 2 B. B i cke tt , S e n i o r P ro je ct E n gi n e e r, D i v i si o n o f R e a ct o r P ro je ct s E. Kn utso n, R esi den t Ins pec tor, N in e M il e P oi nt U ni ts 1 an d 2Li cen see:
J. H eff le y , S eni or V ic e P resi den t an d C hi ef Nuc le ar Off ic er K. Ni etmann , V ic e P resi den t - N in e M il e P oi nt J. C arl in , V ic e P resi den t - N ucl ear Techni cal S erv ic es M. S chi mmel, Pl ant Genera l M ana ger - N in e M il e P oi nt Public Participat ion:
T his is a Categ ory 1 M eeting. Th e public i s inv ited to obse rve this meeti ng an d w il l hav e o ne or mo re o ppo rtuni tie s to co mmuni cate w ith the NR C after the bus in ess po rtio n, b ut b efore the mee tin g is ad journ ed.N R C's a ss e ss me n t l e tt e r ca n b e fou n d i n A D A M S w i th a n A cc e ss i o n N u mb e r o f M L 0 7 0 6 1 0 6 1 6. This mee tin g noti ce w ith the en cl ose d me eti ng agend a c an be lo cate d i n A DA M S w ith an Acc ess io n N umbe r of M L07 101 009 8. The N RC sl id es f or th e me eti ng can be found un der the Acc ess io n N umbe r M L07 101 008 4. AD AM S is ac ces si bl e from the N RC W eb Si te a thtt p://ww w.nr c.g ov/read ing-r m/adam s.h tm l.
2 A d d i ti o n a l i n form a ti o n r e l a ti v e t o t h e N R C's A n n u a l A ss e ss me n t p ro ce ss a n d t h e s a fety p e rfor ma n ce o f N i n e M i l e P o i n t U n i ts 1 a n d 2 c a n b e fou n d o n t h e N R C W e b S i te a t:h tt p://w w w.n rc.go v/N R R/OV E R S IGH T/A S S E S S/i n d e x.h tml.M eeti ng Co ntac t:
Gle nn T. Den tel , C hi ef, Projec ts B ranc h 1 (603) 47 4-35 80 E-ma i l: G T D@nr c.g ov*
Ha ndi cap ped pe rson s re quiri ng ass is tanc e to atte nd or p arti ci pate i n th e me eti ng sha ll make th ei r reque sts know n to the mee tin g conta ct n o l ater than 2 bus in ess days prior to the meet ing. Atte ndance by NRC pers onnel at this m eeting should b e ma d e kn o w n b y A p ri l 2 0 , 2 0 0 7 v i a t e l e p h o n e t o t h e N R C me e ti n g c o n ta ct.A p p ro v e d B y:   /R A b y B ri ce B i cke tt A ct i n g F o r/
Gle nn T. Den tel , C hi ef Pro jects Bra nch 1 D i v i si o n o f R e a ct o r P ro je ct s cc w/enc l: M. J. W al la ce, Pre si den t, C ons tel la tio n Ge nera tio n J.M. H eff le y , S eni or V ic e P resi den t an d C hi ef Nuc le ar Off ic er C. W. Fl emi ng, Es quire , S eni or C oun sel , C ons tel la tio n E nergy Grou p, L LC M. J. W e t t e r h a h n , Es q u ir e , W in s t o n an d St r a wn P. S mi th , P re si d e n t, N e w Y o rk S ta te E n e rgy , R e se a rc h , a n d D e v e l o p me n t A u th o ri ty J. S p a th , P ro gra m D i re ct o r, N e w Y o rk S ta te E n e rgy R e se a rc h a n d D e v e l o p me n t A u th o ri ty P. D. Ed dy , E le ctri c D iv is io n, N YS D epa rtment o f P ubl ic S erv ic e C. Do nal dso n, E squire , A ssi stan t A ttorne y Gen eral , N ew Y ork De partmen t of La w Su perv is or, Tow n o f S cri ba T. J u d so n , C e n tr a l N Y C i ti z e n s A w a re n e ss N e tw o rk D. K a tz , C i ti z e n s A w a re n e ss N e tw o rk A gend a NR C's Ann ual Assessmen t Me eting Ni ne Mi le Poi nt N uclea r P ow er Statio n Apri l 2 4, 20 07 I n t r o d u c t i o n  ...................................................NR C (3 mi nute s)Re v ie w of Re acto r Ov ersi ght Pro ces s................................NR C (5 mi nute s)Na tio nal S ummary of Pl ant Pe rf ormanc e.............................NR C (7 mi nute s)D i sc u ss i o n o f N i n e M i l e P o i n t P e rfor ma n ce...........................NR C (15 min utes)Co nste ll ati on's R esp ons e a nd Re marks.......................Co nste ll ati on (15 min utes)C l o s i n g R e m a r k s................................................NR C (5 mi nute s)S h o r t B r e a k.........................................................(5 mi nute s)NR C to a ddre ss pub li c ques tio ns .................NR C/M embe rs o f the P ubl ic (as ne ede d)
Agen daNR C's Annu al Assessm en t M ee tingNin e M ile Poi nt Nu clea r Pow er Stati on Apr il 24 , 2 00 7 I n t r o d u c t i o n  ...............................................................................N R C (3 min u te s)R e v i e w o f R e a c t o r O v e r s i g h t P r o c e s s............................................................N R C (5 min u te s)N a t i o n a l S u m m a r y o f P l a n t P e r f o r m a n c e.........................................................N R C (7 min u te s)D i s c u s s i o n o f N i n e M i l e P o i n t P e r f o r m a n c e.......................................................N R C (1 5 min u te s)C o n s t e l l a t i o n's R e s p o n s e a n d R e m a r k s...................................................C o n ste ll a ti o n (1 5 min u te s)C l o s i n g R e m a r k s............................................................................N R C (5 min u te s)S h o r t B r e a k....................................................................................(5 min u te s)N R C t o a d d r e s s p u b l i c q u e s t i o n s ............................................NR C/M ember s of the Pub lic (as n ee de d)Dis tribut ion w/enc l: (VI A E-MA IL) Executi ve Director for Operati ons, OEDO  (RIDSE DOMAI LCENT ER)Deputy Executive Direc tor for React or Program s, OEDO (RIDS EDO MAILCE NTE R)Direc tor, Offi ce of Nuc lear React or Regulation, NRR (RIDS NRROD)Deputy Direct or, Off ic e of Nuclear React or Regulation, NRR/ADP R (RIDSNRROD)
D ir e cto r , D iv is io n o f R e g u la to r y I mpr o v e men t Pr o g r a ms, N R R (R ID SN R R D R IP)Direc tor, Division of I nspec tion P rogram M anagem ent, NRR (RIDS NRRDIP M)Direc tor, Division of Lic ensi ng Projec t Managem ent, NRR (RIDS NRRDLPM)Pr o je ct D ir e cto r a te I-1 (PD 1/2), N R R (R ID SN R R D IP M L PD I)As st. General Counse l Materials Litigat ion and Enforc em ent, OGC (RIDSOG CMAILCE NTE R)S. Collins , RA M. Dapas, DRA J. La m b, RI OEDO  J. Lubinsk i, NRR M. Kowal, NRR D. Pick ett, PM , NRR M. David, NRR G. Dent el, DRP B. Bic ket t, DRP L. Cli ne , D RP, Seni or R esid en t In specto r E. Knu tson, DR P, R esid en t In specto r K. Kol ek, R esid en t OA A. Blough, DRS M. Gam beroni, DRS D. Scr e n ci , PAO N. Sh e e h a n , PAO N. M cNamara , SLO M. M cLau gh lin , SLO R e g io n I D o cke t R o o m (w/co n cu r r e n ce s)Regional Adm inis trat or Secret ary, RI Deputy Regional Adm inis trat or Secret ary, RI DRP Divis ion Sec retary, RI DRS Divis ion Sec retary, RI DNMS Divisi on Sec retary, RI DRM Divis ion Sec retary, RI R e g io n I R e ce p ti o n is t DOC UM ENT NAM E: C:\M yF ile s\Cop ies\N ine M ile Poi nt M ee ting N otice a nd a ge nd a.w pd SU N SI R e v ie w C omp le t e: 


B A B 4                (R e v ie wer's I ni t ia ls)Af te r d e cl a r in g t h is d o cu men t "An O ff ic ia l Ag e n cy R e co r d" i t w il l b e r e le a se d t o t h e P u b li c.T o r e c e iv e a c op y o f t hi s d oc ume nt , in di c a t e i n t he b ox: " C" = C op y w itho ut atta chm en t/en closur e  " E" = C op y w ith atta chm en t/en closur e  " N" = N o copy OFF ICE RI/DRP RI/DRP NAME BB ic ket t GDente l/B AB 4 FOR/DATE 04/11/07 04/11/07OF FI C IA L R EC OR D C OP Y}}
2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Nine Mile Point Units 1 and 2 can be found on the NRC Web Site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Meeting Contact:        Glenn T. Dentel, Chief, Projects Branch 1 (603) 474-3580 E-mail: GTD@nrc.gov
* Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 20, 2007 via telephone to the NRC meeting contact.
Approved By: /RA by Brice Bickett Acting For/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/encl:
M. J. Wallace, President, Constellation Generation J.M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn P. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network
 
Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station April 24, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)
Review of Reactor Oversight Process.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
National Summary of Plant Performance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)
Discussion of Nine Mile Point Performance.. . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)
Constellation's Response and Remarks. . . . . . . . . . . . . . . . . . . . . . . Constellation (15 minutes)
Closing Remarks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Short Break.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
NRC to address public questions . . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)
 
Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station April 24, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)
Review of Reactor Oversight Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
National Summary of Plant Performance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)
Discussion of Nine Mile Point Performance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)
Constellation's Response and Remarks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Constellation (15 minutes)
Closing Remarks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Short Break. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
NRC to address public questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)
Distribution w/encl: (VIA E-MAIL)
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO J. Lubinski, NRR M. Kowal, NRR D. Pickett, PM, NRR M. David, NRR G. Dentel, DRP B. Bickett, DRP L. Cline, DRP, Senior Resident Inspector E. Knutson, DRP, Resident Inspector K. Kolek, Resident OA A. Blough, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences)
Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: C:\MyFiles\Copies\Nine Mile Point Meeting Notice and agenda.wpd SUNSI Review Complete:                    BAB4                      (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE                                  RI/DRP                                   RI/DRP NAME                                   BBickett                                GDentel/BAB4 FOR/
DATE                                   04/11/07                                 04/11/07 OFFICIAL RECORD COPY}}

Revision as of 08:31, 23 November 2019

04/24/2007 Meeting Notice and Agenda for Annual Assessment Meeting with Constellation Management to Discuss Nrc'S Assessment of the Safety Performance of Nine Mile Point Units 1 and 2 for Calendar Year 2006
ML071010098
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/10/2007
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dental, G., RGN-DRP, 603-474-3580
References
MN 07-020
Download: ML071010098 (4)


Text

April 10, 2007 MN No.07-020 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Constellation Energy, LLC Facility: Nine Mile Point Nuclear Station, Units 1 and 2 Docket No: 50-220, 50-410 Date/Time: April 24, 2007, at 2:00 p.m.

Location: Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069 Purpose: The NRC requested an Annual Assessment Meeting with Constellation management to discuss NRCs assessment of the safety performance of Nine Mile Point Units 1 and 2 for calendar year 2006. NRCs assessment is documented in a letter dated March 2, 2007.

Attendees*:

NRC: G. Dentel, Chief, Projects Branch 1, Division of Reactor Projects, Region I L. Cline, Senior Resident Inspector, Nine Mile Point Units 1 and 2 B. Bickett, Senior Project Engineer, Division of Reactor Projects E. Knutson, Resident Inspector, Nine Mile Point Units 1 and 2 Licensee: J. Heffley, Senior Vice President and Chief Nuclear Officer K. Nietmann, Vice President - Nine Mile Point J. Carlin, Vice President - Nuclear Technical Services M. Schimmel, Plant General Manager - Nine Mile Point Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with an Accession Number of ML070610616.

This meeting notice with the enclosed meeting agenda can be located in ADAMS with an Accession Number of ML071010098. The NRC slides for the meeting can be found under the Accession Number ML071010084. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Nine Mile Point Units 1 and 2 can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting Contact: Glenn T. Dentel, Chief, Projects Branch 1 (603) 474-3580 E-mail: GTD@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 20, 2007 via telephone to the NRC meeting contact.

Approved By: /RA by Brice Bickett Acting For/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/encl:

M. J. Wallace, President, Constellation Generation J.M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn P. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network

Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station April 24, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Nine Mile Point Performance.. . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Constellation's Response and Remarks. . . . . . . . . . . . . . . . . . . . . . . Constellation (15 minutes)

Closing Remarks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station April 24, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Nine Mile Point Performance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Constellation's Response and Remarks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Constellation (15 minutes)

Closing Remarks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO J. Lubinski, NRR M. Kowal, NRR D. Pickett, PM, NRR M. David, NRR G. Dentel, DRP B. Bickett, DRP L. Cline, DRP, Senior Resident Inspector E. Knutson, DRP, Resident Inspector K. Kolek, Resident OA A. Blough, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences)

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: C:\MyFiles\Copies\Nine Mile Point Meeting Notice and agenda.wpd SUNSI Review Complete: BAB4 (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett GDentel/BAB4 FOR/

DATE 04/11/07 04/11/07 OFFICIAL RECORD COPY