ML071010098

From kanterella
Jump to navigation Jump to search
Meeting Notice and Agenda for Annual Assessment Meeting with Constellation Management to Discuss Nrc'S Assessment of the Safety Performance of Nine Mile Point Units 1 and 2 for Calendar Year 2006
ML071010098
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/10/2007
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dental, G., RGN-DRP, 603-474-3580
References
MN 07-020
Download: ML071010098 (4)


Text

April 10, 2007 MN No.07-020 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Constellation Energy, LLC Facility: Nine Mile Point Nuclear Station, Units 1 and 2 Docket No: 50-220, 50-410 Date/Time: April 24, 2007, at 2:00 p.m.

Location: Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069

Purpose:

The NRC requested an Annual Assessment Meeting with Constellation management to discuss NRCs assessment of the safety performance of Nine Mile Point Units 1 and 2 for calendar year 2006. NRCs assessment is documented in a letter dated March 2, 2007.

Attendees*:

NRC: G. Dentel, Chief, Projects Branch 1, Division of Reactor Projects, Region I L. Cline, Senior Resident Inspector, Nine Mile Point Units 1 and 2 B. Bickett, Senior Project Engineer, Division of Reactor Projects E. Knutson, Resident Inspector, Nine Mile Point Units 1 and 2 Licensee: J. Heffley, Senior Vice President and Chief Nuclear Officer K. Nietmann, Vice President - Nine Mile Point J. Carlin, Vice President - Nuclear Technical Services M. Schimmel, Plant General Manager - Nine Mile Point Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with an Accession Number of ML070610616.

This meeting notice with the enclosed meeting agenda can be located in ADAMS with an Accession Number of ML071010098. The NRC slides for the meeting can be found under the Accession Number ML071010084. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Nine Mile Point Units 1 and 2 can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn T. Dentel, Chief, Projects Branch 1 (603) 474-3580 E-mail: GTD@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 20, 2007 via telephone to the NRC meeting contact.

Approved By: /RA by Brice Bickett Acting For/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/encl:

M. J. Wallace, President, Constellation Generation J.M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn P. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network

Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station April 24, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Nine Mile Point Performance.. . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Constellation's Response and Remarks. . . . . . . . . . . . . . . . . . . . . . . Constellation (15 minutes)

Closing Remarks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station April 24, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Nine Mile Point Performance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Constellation's Response and Remarks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Constellation (15 minutes)

Closing Remarks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO J. Lubinski, NRR M. Kowal, NRR D. Pickett, PM, NRR M. David, NRR G. Dentel, DRP B. Bickett, DRP L. Cline, DRP, Senior Resident Inspector E. Knutson, DRP, Resident Inspector K. Kolek, Resident OA A. Blough, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences)

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: C:\MyFiles\Copies\Nine Mile Point Meeting Notice and agenda.wpd SUNSI Review Complete: BAB4 (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett GDentel/BAB4 FOR/

DATE 04/11/07 04/11/07 OFFICIAL RECORD COPY