ML082340794

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Nine Mile Point Nuclear Station to Discuss Proposed Extended Power Uprate Related to Steam Dryer Analysis for Unit No. 2
ML082340794
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/27/2008
From: Richard Guzman
Plant Licensing Branch 1
To: Mark Kowal
Plant Licensing Branch 1
Guzman R, NRR/DORL, 415-1030
References
Download: ML082340794 (7)


Text

August 27, 2008 MEMORANDUM TO: Mark G. Kowal, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing FROM: Richard V. Guzman, Senior Project Manager /RA/

Plant Licensing Branch I-1 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH NINE MILE POINT NUCLEAR STATION (NMPNS) TO DISCUSS EXTENDED POWER UPRATE FOR NINE MILE POINT, UNIT NO. 2 (NMP2)

DATE & TIME: Tuesday, September 9, 2008 1:00 p.m. - 4:30 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11545 Rockville Pike, Room O-11B2 Rockville, Maryland PURPOSE: This meeting is to conduct a working level-discussion related to the schedule, approach, and strategy for the proposed NMP2 extended power uprate (EPU) application related to steam dryers.

CATEGORY 1:

  • This is a Category 1 Meeting. Proprietary information will be discussed during this meeting. Therefore, portions of this meeting may be closed to members of the public who have not been granted access to the information by the owner of the information.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). NMPNS contract staff from Continuum Dynamics Incorporated (CDI) will also attend.

NRR NMPNS CDI K. Manoly G. Laughlin A. Bilanin C. Basavaraju G. Pavis A. Tsirigotis T. Darling R. Guzman K. Jenks T. Alexion J. Dosa Docket No. 50-410

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACTS: Richard Guzman, NRR Douglas Pickett, NRR 301-415-1030 301-415-1364 rvg@nrc.gov dvp1@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

ML082340794 NRC-001 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman ABaxter for SLittle MKowal DATE 8/26/08 8/27/08 8/27/08 DATED: August 27, 2008 FORTHCOMING MEETING WITH THE NINE MILE POINT NUCLEAR STATION (NMPNS) TO DISCUSS EXTENDED POWER UPRATE FOR NINE MILE POINT UNIT NO. 2 (NMP2)

PUBLIC LPLI-1 R/F MKowal RidsNrrDorlLpl-1 SLittle RidsNrrLASLittle (Hard copy)

RGuzman RidsNrrPMRGuzman OGC RidsOgcMailCenter JGiitter RidsNrrDorl BBoger RidsNrrAdro OPA RidsOpaMail PHiland RidsNrrDe KManoly RidsNrrDeEmcb CBasavaraju ATsirigotis TAlexion RidsNrrPMTAlexion SWilliams, EDO ACRS RidsAcrsAcnw&mMailCenter GDentel, RI RidsRgn1MailCenter Receptionist (OWFN and TWFN)

PMNS cc: Plant Service list

AGENDA*

NUCLEAR REGULATORY COMMISSION MEETING WITH NINE MILE POINT NUCLEAR STATION (NMPNS)

EXTENDED POWER UPRATE (EPU) PRE-APPLICATION MEETING RELATED TO STEAM DRYER ANALYSIS SEPTEMBER 9, 2008 INTRODUCTIONS 1:00 p.m. - 1:05 p.m.

OBJECTIVES 1:05 a.m. - 1:10 p.m.

INITIAL STAFF COMMENTS 1:10 p.m. - 1:30 p.m.

NMPNS EPU INTRODUCTION 1:30 p.m. - 1:45 p.m.

NMPNS APPROACH TO ADDRESS 1:45 p.m. - 3:15 p.m.

STEAM DRYER ISSUES IDENTIFIED IN PREVIOUS EPU LICENSE AMENDMENT REQUESTS BREAK 3:15 p.m. - 3:30 p.m.

SUMMARY

AND SCHEDULE REVIEW 3:30 p.m. - 3:45 p.m.

OPPORTUNITY FOR PUBLIC REMARKS 3:45 p.m. - 4:15 p.m.

CONCLUSIONS AND CLOSING REMARKS 4:15 p.m. - 4:30 p.m.

ADJOURN 4:30 p.m.

  • Tentative Schedule - Topics and time subject to change Enclosure

Nine Mile Point Nuclear Station, Unit No. 2 cc:

Mr. Michael J. Wallace, Vice-Chairman Constellation Energy 100 Constellation Way, Suite 1800P Baltimore, MD 21202 Carey W. Fleming, Esquire Sr. Counsel - Nuclear Generation Mr. Henry B. Barron, President, CEO & Constellation Energy Nuclear Group, LLC Chief Nuclear Officer 750 East Pratt Street, 17th Floor Constellation Energy Nuclear Group, LLC Baltimore, MD 21202 100 Constellation Way, Suite 200C Baltimore, MD 21202 Mr. John P. Spath New York State Energy, Research, and Mr. Terry F. Syrell Development Authority Director, Licensing 17 Columbia Circle Nine Mile Point Nuclear Station Albany, NY 12203-6399 P.O. Box 63 Lycoming, NY 13093 Mr. Paul Tonko President and CEO Regional Administrator, Region I New York State Energy, Research, and U.S. Nuclear Regulatory Commission Development Authority 475 Allendale Road 17 Columbia Circle King of Prussia, PA 19406 Albany, NY 12203-6399 Resident Inspector Mr. Gary L. Detter U.S. Nuclear Regulatory Commission Manager - Nuclear Safety and Security P.O. Box 126 Constellation Energy Nuclear Group, LLC Lycoming, NY 13093 100 Constellation Way, Suite 200C Baltimore, MD 21202 Supervisor Town of Scriba Mr. James R. Evans Route 8, Box 382 LIPA Oswego, NY 13126 P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General Mr. Keith J. Polson New York Department of Law Vice President Nine Mile Point 120 Broadway Nine Mile Point Nuclear Station, LLC New York, NY 10271 P. O. Box 63 Lycoming, NY 13093 Mr. Paul D. Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mark J. Wetterhahn, Esquire Winston & Strawn 1700 K Street, NW Washington, DC 20006