ML13282A628

From kanterella
Jump to navigation Jump to search
11/1/2013 - Notice of Public Meeting - Nine Mile Point Regulatory Conference, to Discuss Preliminary Greater than Green Finding and Apparent Violation
ML13282A628
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/09/2013
From: Daniel Schroeder
Reactor Projects Branch 1
To:
Constellation Energy Nuclear Group
Schroeder D
References
MN No.13-024
Download: ML13282A628 (4)


Text

MN No.13-024 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING October 9, 2013 Licensee:

Constellation Energy Nuclear Group, LLC (CENG)

Facilities:

Nine Mile Point Nuclear Generating Station, Units 1 and 2 (NMPNS)

Docket Nos:

50-220 and 50-410 Date and Time:

November 1, 2013 12:00 p.m. - 3:00 p.m.

Location: U.S. Nuclear Regulatory Commission (NRC)

Region I 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713

Purpose:

The purpose of this Regulatory Conference, which has been scheduled at your request, is to provide an opportunity for you to present to the NRC your perspective on the facts and assumptions the NRC used to arrive at, and assess the significance of, the finding and associated apparent violation (AV) documented in NRC Inspection Report Nos.

05000220/2013003 and 05000410/2013003, dated August 13, 2013, (ML13225A471), and letter dated September 23, 2013, (EA-13-186),

Nine Mile Point Nuclear Station, Units 1 and 2 - NRC Integrated Inspection Report 05000220/2013003 and 05000410/2013003; Preliminary Greater than Green Finding and Apparent Violation, (ML13266A237). This finding dealt with inadequate CENG procedures for restoration following an unexpected loss of direct current control power resulting in an unplanned loss of all shutdown cooling (SDC) when time to boil was less than two hours. As a result of this inadequacy, Nine Mile Point Unit 1 had a loss of SDC event that occurred on April 16, 2013, during the unit refueling outage. This conference will also address whether enforcement action is warranted for the associated AV.

Category:

This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss CENGs performance and the role of the NRC in ensuring safe operations at the plants. The agenda is enclosed.

2 Attendees:

NRC:

William M. Dean, Regional Administrator, Region I Darrell J. Roberts, Director, Division of Reactor Projects Raymond K. Lorson, Director, Division of Reactor Safety (DRS)

Wayne L. Schmidt, Senior Reactor Analyst, DRS CENG:

Chris Costanzo, Vice President, NMPNS Jim Stanley - Plant General Manager, NMPNS Terry Syrell, Manager, Nuclear Safety and Security, NMPNS Everett Perkins, Director of Licensing, NMPNS Meeting

Contact:

Dan Schroeder, Chief, Projects Branch 1 610-337-5262 E-mail:

Daniel.Schroeder@nrc.gov The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Interested members of the public can participated in this meeting via a toll free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information.

Attendance by other NRC personnel at this meeting should be made known by October 30, 2013, via telephone to the NRC meeting contact.

Approved by:

/RA/

Daniel Schroeder, Chief Projects Branch 1 Division of Reactor Projects cc w/encl: Distribution via ListServ

ML13282A628 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/

DSchroeder/

DATE 10/8/13 10/9/13

Enclosure Nine Mile Point Unit 1 Loss of Shutdown Cooling Event Regulatory Conference 12:00 pm Welcome and Introductions NRC/CENG

12:15 pm Overview of the Finding and the NRC Phase III Risk Assessment NRC

12:30 pm Constellation Presentation CENG

2:00 pm Questions to Constellation from NRC NRC/CENG

3:00 pm Closing Comments (Regulatory Conference Concludes)

NRC 3:10 pm NRC Address any Public Comments NRC Adjourn