Notice of Meeting with Constellation Energy, Llc., to Discuss the Nrc'S Assessment of the Safety Performance Nine Point Nuclear Station for 2007
ML080730030
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/18/2008
From: Glenn Dentel
Reactor Projects Branch 1
To:
References
MN 08-004
Download: ML080730030 (4)


Text

March 18, 2008 MN No.08-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Constellation Energy, LLC Facility: Nine Mile Point Nuclear Station, Units 1 and 2 Docket No: 50-220, 50-410 Date/Time: April 23, 2008, 2:00 p.m.

Location: Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069

Purpose:

The NRC requested an Annual Assessment Meeting with Constellation management to discuss the NRCs assessment of the safety performance of Nine Mile Point Nuclear Station for 2007. NRCs assessment is documented in a letter dated March 3, 2008.

Attendees*:

NRC: G. Dentel, Chief, Projects Branch 1, Division of Reactor Projects, Region I E. Knutson, Senior Resident Inspector, Nine Mile Point D. Dempsey, Resident Inspector, Nine Mile Point Licensee: K. Polson, Vice President - Nine Mile Point S. Belcher, Plant General Manager - Nine Mile Point L. Larragoite, Vice President - Nuclear Technical Services Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with an Accession Number of ML080610012.

This meeting notice with the enclosed meeting agenda is located in ADAMS with Accession Number ML080730030. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Nine Mile Point Units 1 and 2 can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: GTD@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by via telephone to the NRC meeting contact.

Approved By: ___/RA/_________

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/encl:

M. Wallace, President, Constellation Generation J. Heffley, Senior Vice President and Chief Nuclear Officer C. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. Wetterhahn, Esquire, Winston and Strawn T. Syrell, Director, Licensing, Nine Mile Point Nuclear Station P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network

3 Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Station Introduction ........................................................................................................ NRC (3 minutes)

Review of Reactor Oversight Process ................................................................. NRC (5 minutes)

National Summary of Plant Performance............................................................. NRC (7 minutes)

Discussion of Nine Mile Point Performance....................................................... NRC (15 minutes)

Constellation's Response and Remarks ............................................... Constellation (15 minutes)

Closing Remarks.................................................................................................. NRC (5 minutes)

Short Break ................................................................................................................... (5 minutes)

NRC to address public questions .................................. NRC/Members of the Public (as needed)

4 Agenda NRCs Annual Assessment Meeting Nine Mile Point Nuclear Power Station Introduction .................................................................................................................................................................. NRC (3 minutes)

Review of Reactor Oversight Process ........................................................................................................................... NRC (5 minutes)

National Summary of Plant Performance....................................................................................................................... NRC (7 minutes)

Discussion of Nine Mile Point Performance................................................................................................................. NRC (15 minutes)

Constellation's Response and Remarks ......................................................................................................... Constellation (15 minutes)

Closing Remarks............................................................................................................................................................ NRC (5 minutes)

Short Break .............................................................................................................................................................................(5 minutes)

NRC to address public questions ............................................................................................ NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL) M. Kowal, NRR Executive Director for Operations, OEDO G. Dentel, DRP (RIDSEDOMAILCENTER RESOURCES) B. Bickett, DRP Deputy Executive Director for Reactor Programs, OEDO R. Guzman, NRR (RIDSEDOMAILCENTER RESOURCES) D. Pickett, NRR Director, Office of Nuclear Reactor Regulation, NRR E. Knutson, SRI - Nine Mile Point (RIDSNRROD) D. Dempsey, RI - Nine Mile Point Deputy Director, Office of Nuclear Reactor Regulation, K. Kolek, DRP, OA NRR/ADPR (RIDSNRROD) D. Roberts, DRS RIDSNRRADRO M. Gamberoni, DRS RIDSNRRDIRS D. Screnci, PAO RIDSNRRDIRSLPAB N. Sheehan, PAO RIDSNRRDORL N. McNamara, SLO RIDSNRRDORlLpl1-1 M. McLaughlin, SLO RIDSNRRDORlLpl1-2 Region I Docket Room (w/concurrences)

Asst. General Counsel Materials Litigation and Enforcement, Regional Administrator Secretary, RI OGC (RIDSOGCMAILCENTER) Deputy Regional Administrator Secretary, RI S. Collins, RA DRP Division Secretary, RI M. Dapas, DRA DRS Division Secretary, RI G. West, RI OEDO DNMS Division Secretary, RI J. Lubinski, NRR DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: T:\DRP\BRANCH1\ROP Assessment Process Documents\2008 ROP EOC stuff\NMP EOC stuff +

attachments\Nine Mile Point Meeting Notice and agenda.wpd SUNSI Review Complete: GTD (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"

= No copy ML080730030 OFFICE RI/DRP RI/DRP NAME *BBickett/KMT FOR/ GDentel/GTD DATE 03/18/08 03/18/08

  • By Telecon OFFICIAL RECORD COPY