ML16204A180: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML16204A180 | | number = ML16204A180 | ||
| issue date = 05/31/2016 | | issue date = 05/31/2016 | ||
| title = Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, | | title = Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. | ||
| author name = | | author name = | ||
| author affiliation = Wolf Creek Nuclear Operating Corp | | author affiliation = Wolf Creek Nuclear Operating Corp | ||
Line 14: | Line 14: | ||
| document type = Report, Technical, Updated Final Safety Analysis Report (UFSAR) | | document type = Report, Technical, Updated Final Safety Analysis Report (UFSAR) | ||
| page count = 318 | | page count = 318 | ||
| revision = 0 | |||
}} | }} |
Revision as of 16:48, 25 February 2018
ML16204A180 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 05/31/2016 |
Revision: | 0 |
From: | Wolf Creek |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16203A351 | List:
|
References | |
WM 16-0008 | |
Download: ML16204A180 (318) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Report
MONTHYEARML24248A0762024-09-0404 September 2024
[Table view]Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23244A2142023-09-0101 September 2023 IAEA Osart Report ML23068A1962023-03-0909 March 2023 Biennial 50.59 Evaluation Report ML23135A2012022-12-0606 December 2022 EQSD-I, Rev 18, Equipment Qualification Design Basis Document ML23135A1932022-09-0101 September 2022 EQSD-II, Rev 34, Equipment Qualification Summary Document WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML22152A2042022-05-18018 May 2022 EQSD-I, Revision 16, Equipment Qualification Design Basis Document ML22152A1992022-05-18018 May 2022 EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) ML22152A1942022-05-18018 May 2022 EQSD-I, Revision 15, Equipment Qualification Design Basis Document ML23135A2072022-04-0606 April 2022 EQSD-I, Rev 17, Equipment Qualification Design Basis Document ML20290A6192020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, EQSD-I, Rev. 14, Equipment Qualification Design Basis Document ML20182A4292020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)2020-01-15015 January 2020 Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) ML19330F8632019-12-0606 December 2019 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, ML19178A3392019-07-0909 July 2019 Staff Assessment of Aging Management Program and Inspection Plan of Reactor Vessel Internals ML19092A1562018-09-18018 September 2018 EQSD-I, Rev 14 ML18093B0112018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Classification Design Basis Document, EQSD-I Rev 13 ML18093B0132018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Qualification Summary Document, EQSD-II, Rev 30, Redacted WO 19-0010, EQSD-II, Rev 312018-02-19019 February 2018 EQSD-II, Rev 31 ML18023A1572018-01-18018 January 2018 Submittal of Blind Sample Error Investigation Report ML17241A2512017-11-0808 November 2017 Staff Assessment of Flooding Focused Evaluation ML17234A4002017-08-17017 August 2017 Summary of Changes to Three Forms That Implement Radiological Emergency Response Plan (RERP) ML17093A6652017-03-27027 March 2017 Report on Financial Protection Levels ML17151B0452017-03-0909 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted ML17151B0442017-03-0202 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 1 ML17072A0512017-03-0202 March 2017 Biennial 50.59 Evaluation Report for 01/01/2015 - 12/31/2016 ML17151B0432017-01-26026 January 2017 Equipment Qualification Design Basis Document, EQSD-I, Rev 11 ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays ET 17-0005, 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS2016-12-15015 December 2016 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document.2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. ML16204A1802016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. WM 16-0008, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted2016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted ML15314A6572015-11-0404 November 2015 Submittal of 10 CFR 50.46 Thirty Day Report of Emergency Core Cooling System (ECCS) Model Changes ML17151B0392015-10-26026 October 2015 E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation ET 16-0003, Flood Hazard Reevaluation Report, Revision 12015-10-21021 October 2015 Flood Hazard Reevaluation Report, Revision 1 ML15216A3202015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights ML15075A0282015-03-0404 March 2015 Biennial 50.59 Evaluation Report ML15062A2752015-02-24024 February 2015 Pressure and Temperature Limits Report, Revision 2 ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-23023 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request 2024-09-04 Category:Technical MONTHYEARML23244A2142023-09-0101 September 2023
[Table view]IAEA Osart Report ML23135A2012022-12-0606 December 2022 EQSD-I, Rev 18, Equipment Qualification Design Basis Document ML23135A1932022-09-0101 September 2022 EQSD-II, Rev 34, Equipment Qualification Summary Document WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML22152A2042022-05-18018 May 2022 EQSD-I, Revision 16, Equipment Qualification Design Basis Document ML22152A1992022-05-18018 May 2022 EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) ML22152A1942022-05-18018 May 2022 EQSD-I, Revision 15, Equipment Qualification Design Basis Document ML23135A2072022-04-0606 April 2022 EQSD-I, Rev 17, Equipment Qualification Design Basis Document ML20290A6192020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, EQSD-I, Rev. 14, Equipment Qualification Design Basis Document ML19092A1562018-09-18018 September 2018 EQSD-I, Rev 14 ML18093B0112018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Classification Design Basis Document, EQSD-I Rev 13 ML18093B0132018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Qualification Summary Document, EQSD-II, Rev 30, Redacted WO 19-0010, EQSD-II, Rev 312018-02-19019 February 2018 EQSD-II, Rev 31 ML17151B0452017-03-0909 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted ML17151B0442017-03-0202 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 1 ML17151B0432017-01-26026 January 2017 Equipment Qualification Design Basis Document, EQSD-I, Rev 11 ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document.2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. ML16204A1802016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. WM 16-0008, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted2016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted ML17151B0392015-10-26026 October 2015 E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation ML15062A2752015-02-24024 February 2015 Pressure and Temperature Limits Report, Revision 2 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14064A3292014-02-26026 February 2014 NP-Attachment to LTR-LIS-13-557, Rev 0, Application of Westinghouse Best-Estimate Large Break LOCA Methodology to the Wolf Creek Generating Station ET 14-0009, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2014-02-25025 February 2014 Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML14034A0542014-02-12012 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML14023A6142014-02-0303 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Wolf Creek Generating Station, TAC No.: MF0788 ML13247A0772013-08-31031 August 2013 WCAP-17658-NP, Rev. 0, Wolf Creek Generating Station Transition of Methods for Core Design and Safety Analyses - Licensing Report ML13247A0782013-08-31031 August 2013 WCAP-17746-NP, Rev. 0 Westinghouse Setpoint Methodology as Applied to the Wolf Creek Generating Station ML13247A0792013-08-31031 August 2013 WCAP-17602-NP, Rev. 0, Westinghouse Setpoint Calculations for the Wolf Creek Generating Station Control, Protection, and Indication Systems ML13247A0802013-08-13013 August 2013 Full Scope Implementation of the Alternative Source Term ML13177A2852013-06-30030 June 2013 WCAP-17678-NP, Supplement 1, Revision 1, Wolf Creek Generating Station Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Part 3 of 3 ML12340A3982012-11-30030 November 2012 PEUS-WR-12-5, Revision 1, Wolf Creek Nuclear Operating Corporation Post Fukushima Flooding Walkdown Report ML1222602142012-08-16016 August 2012 Iolb Evaluation of Ifr 2012-04 Relating to Wolf Creek Loss of Offsite Power and Notification of Unusual Event ML12129A3872011-08-30030 August 2011 Enclosure III, Wolf Creek Nuclear Operating Corporation Administrative Procedure AP 31A-100, Revision 8, Solid Radwaste Process Control Program. ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0822702982008-07-30030 July 2008 CS Innovations Report 6002-00002, Rev. 2, Als Configuration Management Plan, Non-Proprietary, Enclosure II ML0822703012008-07-29029 July 2008 CS Innovations Report 6002-00026, Rev. 1, Als Platform Overview, Non-Proprietary, Enclosure Viii ML0822703002008-07-29029 July 2008 CS Innovations Report 6101-00200, Rev. 3, Msfis V & V Report, Non-Proprietary, Enclosure VI ML0822702992008-07-29029 July 2008 CS Innovations Report 6002-00001, Rev. 2, Als Quality Assurance Plan, Non-proprietary, Enclosure IV ET 08-0032, Submittal of Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2008-05-14014 May 2008 Submittal of Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification ML0804401002008-01-31031 January 2008 Westinghouse Electric Company LLC LTR-CDME-08-11 NP-Attachment, Interim Alternate Repair Criterion (ARC) for Cracks in the Lower Region of the Tubesheet Expansion Zone ML0727506142007-09-24024 September 2007 LTR-CDME-07-198 NP-Attachment, Response to NRC RAI Relating to LTR-CDME-07-72 P-Attachment and LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request. ML0724703942007-08-31031 August 2007 Final Report on Implication of Wolf Creek Indications. ML0719700832007-07-14014 July 2007 Draft a EPRI Report: Advanced Fea Industry Corres Presentation Studies ML0720003122007-07-13013 July 2007 Summary of Impact to Wolf Creek License Renewal Application Severe Accident Mitigation Alternatives Analysis Due to Computer Program Error ML0715603982007-04-30030 April 2007 Evaluation of Circumferential Indications in Pressurizer Nozzle Dissimilar Metal Welds at the Wolf Creek Power Plant - Non-Proprietary Report ET 07-0008, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-04-18018 April 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification ML0708001982007-03-13013 March 2007 9100-00003-NP, Rev. 1, Wolf Creek Generating Station Main Steam and Feedwater Isolation System (Msfis) Controls Summary. ML0702401592007-01-22022 January 2007 MRP 2007-003 Attachment 1, Implications of Wolf Creek Pressurizer Butt Weld Indications Relative to Safety Assessment and Inspection Requirements. 2023-09-01 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24114A1912024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 19, Post-Fire Safe Shutdown Area Analysis ML24114A1602024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W01, Attachment C Through G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML24114A1482024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Figures ML24114A1882024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1892024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-II, Rev. 35, Equipment Qualification Summary Document ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1852024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 12, Fire Hazard Analysis ML24114A1862024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Rev. 14. Quality Program Manual ML24114A1782024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1592024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Rev. 4 ML24114A1362024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Cover Sheet ML24114A1382024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Instrumentation and Controls ML24114A1422024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Radiation Protection ML24114A1312024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 16, Relocated Technical Specifications ML24114A1752024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 18, Post-Fire Safe Shutdown Area Analysis ML24114A1562024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Figures ML24114A1832024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 14, Fire Hazard Analysis ML24114A1802024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-I, Rev. 19, Equipment Qualification Design Basis Document ML24114A1572024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Figures ML24114A1402024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Site Characteristics ML24114A1332024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1322024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Questions 005.1 Through 031.20 ML24114A1372024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Electric Power ML24114A1272024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements ML24114A1392024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Reactor Coolant System and Connected Systems ML24114A1872024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1292024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 14, Initial Test Program ML24114A1532024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures ML24114A1842024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN004, Post-Fire Shutdown (PFSSD) Analysis ML24114A1282024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 13, Conduct of Operating ML24114A1732024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN011, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1922024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1822024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1352024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Auxiliary Systems ML24114A1522024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Figures ML24114A1472024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Figures ML24114A1612024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W08, Appendix G3D to H, Structural Steel Fireproofing Data ML24114A1502024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Figures ML24114A1342024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 4, Reactor ML24114A1772024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evaluation ML24114A1622024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Attachment B7 Through B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail B-1 Limitation ML24114A1242024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 3, Design of Structures, Components, Equipment, and Systems ML24114A1552024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 1, Figures ML24114A1792024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation, XX-E-013, Rev. 4-CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1812024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN010, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1492024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Figures ML24114A1262024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Radioactive Waste Management ML24114A1512024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 10, Figures ML24114A1762024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013. Rev. 4-CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1412024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Engineered Safety Features 2024-04-15 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16204A180&oldid=343204"