Letter Sequence Request |
---|
TAC:MD4839, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0708001982007-03-13013 March 2007 9100-00003-NP, Rev. 1, Wolf Creek Generating Station Main Steam and Feedwater Isolation System (Msfis) Controls Summary. Project stage: Request ET 07-0004, Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement2007-03-14014 March 2007 Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement Project stage: Request ET 07-0008, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-04-18018 April 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0712204892007-05-0303 May 2007 Meeting Notice - LAR to Upgrade the Main Steam and Feedwater Isolation System (Msfis) Project stage: Meeting ET 07-0013, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls2007-05-0909 May 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls Project stage: Response to RAI ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification Project stage: Meeting ML0713805112007-05-29029 May 2007 Acceptance Review of Licensee'S Application for Main Steam and Feedwater Isolation System Controls Modification Project stage: Acceptance Review ML0713805102007-06-0404 June 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station on License Application Request to Update Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0022, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-06-15015 June 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0717900072007-07-18018 July 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Licensee'S License Amendment Request Dated March 14, 2006, to Modify the Main Steam and Feedwater Isolation System Project stage: Meeting ML0721501532007-08-0202 August 2007 NRC Staff Handout for August 2, 2007, Meeting with Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0717900062007-08-0808 August 2007 Completion of Acceptance Review of Request to Modify the Main Stream and Feedwater Isolation System Project stage: Acceptance Review ML0722109412007-08-14014 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Discussed on Description and Justification of Its Proposed Modification of the Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0039, Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-08-31031 August 2007 Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0724200172007-09-11011 September 2007 Request for Withholding Information from Public Disclosure in CS Innovations Topical Report 9100-00003-P for the Wolf Creek Generating Station Project stage: Withholding Request Acceptance ET 07-0041, Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-09-20020 September 2007 Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0725503102007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Report Submitted August 31, 2007 Project stage: Withholding Request Acceptance ML0724201352007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in Three CS Innovations Topical Reports Submitted April 18, 2007 for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502832007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Documents Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502682007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502012007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted April 18, 2007, for Wolf Creek Generating Station (Tac No. MD4839) Project stage: Withholding Request Acceptance ML0732001042007-11-16016 November 2007 Notice of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation to Discuss Main Steam and Feedwater Isolation System (Tac No. MD4839) Project stage: Meeting ML0733103642007-11-27027 November 2007 Revised Notice of Meeting with Wolf Creek Nuclear Operating Corp, to Discuss NRC Staff'S Request for Information on Licensee'S Supplemental Letter Dated September 27, 2007, to the Application Dated February 21, 2006, to Revise TS 5.5.9 Project stage: RAI ML0733101982007-11-27027 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation, to Discuss NRC Staff'S Request for Additional Information on Licensee'S Proposed Main Steam and Feedwater Isolation System Modification in Its Application Dated March 14, 2007 Project stage: RAI ML0731000102007-12-0707 December 2007 Request for Additional Information for the Main Stream and Feedwater Isolation System Modification (Tac No. MD4839) Project stage: RAI ML0729700242008-03-0303 March 2008 Issuance of License Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Approval ML0729700282008-03-0303 March 2008 Tech Spec Pages for Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Other ML0809801342008-04-16016 April 2008 Withholding from Public Disclosure, CS Innovations, 6101-00007, Msfis Instruction, Operation, and Maintenance Manual, Revision 1, Submitted March 14, 2008 Project stage: Other ML0809802612008-06-23023 June 2008 Wolf Creek,Request for Withholding Information from Public Disclosure in Als Architecture Evaluation and Sfis D3 Assessment Submitted February 28, 2008 Project stage: Withholding Request Acceptance ML0822703012008-07-29029 July 2008 CS Innovations Report 6002-00026, Rev. 1, Als Platform Overview, Non-Proprietary, Enclosure Viii Project stage: Request ML0822702982008-07-30030 July 2008 CS Innovations Report 6002-00002, Rev. 2, Als Configuration Management Plan, Non-Proprietary, Enclosure II Project stage: Request ML0822702962008-07-31031 July 2008 Transmitted of Resubmittal of Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0809802352008-08-18018 August 2008 Request for Withholding Information from Public Disclosure, Three Proprietary Documents, Affidavit Dated July 29, 2008, Executed by S. Sorenson, CS Innovations, LLC Project stage: Withholding Request Acceptance ML0902708252009-01-0909 January 2009 Enclosure II to Wm 09-0001, Msfis D3 Assessment, Rev 2 Project stage: Request ML0902708232009-01-14014 January 2009 Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 2 Project stage: Request WM 09-0001, Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-16016 January 2009 Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Response to RAI ML0902704262009-01-16016 January 2009 Wolf Creek, Enclosures Viii & Xxviii to Wm 09-0001 - CS Innovations Report 6002-00026, Als Platform Overview, Rev 2 Project stage: Request ET 09-0005, Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-29029 January 2009 Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0903406802009-02-0909 February 2009 Request for Withholding Information from Public Disclosure, Affidavit Executed by Steen Sorenson, CS Innovations LLC Project stage: Withholding Request Acceptance ET 09-0008, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-17017 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ET 09-0011, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-27027 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ML0906505542009-03-0606 March 2009 Decontrolled Letter, Draft Safety Evaluation for Modifications to the Main Steam and Feedwater Isolation Control System for Review of Proprietary Information Project stage: Draft Approval ML0906202032009-03-27027 March 2009 Request for Withholding Information from Public Disclosure, WCGS Letter Dated 2/17/2009 Project stage: Withholding Request Acceptance ML0906103172009-03-31031 March 2009 Issuance of Amendment No. 181, Revise Licensing Basis, Modification of the Main Steam and Feedwater Isolation System Controls Project stage: Approval 2007-08-08
[Table View] |
|
---|
Category:Report
MONTHYEARML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23244A2142023-09-0101 September 2023 IAEA Osart Report ML23068A1962023-03-0909 March 2023 Biennial 50.59 Evaluation Report ML23135A2012022-12-0606 December 2022 EQSD-I, Rev 18, Equipment Qualification Design Basis Document ML23135A1932022-09-0101 September 2022 EQSD-II, Rev 34, Equipment Qualification Summary Document WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML22152A2042022-05-18018 May 2022 EQSD-I, Revision 16, Equipment Qualification Design Basis Document ML22152A1992022-05-18018 May 2022 EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) ML22152A1942022-05-18018 May 2022 EQSD-I, Revision 15, Equipment Qualification Design Basis Document ML23135A2072022-04-0606 April 2022 EQSD-I, Rev 17, Equipment Qualification Design Basis Document ML20290A6192020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, EQSD-I, Rev. 14, Equipment Qualification Design Basis Document ML20182A4292020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)2020-01-15015 January 2020 Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) ML19330F8632019-12-0606 December 2019 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, ML19178A3392019-07-0909 July 2019 Staff Assessment of Aging Management Program and Inspection Plan of Reactor Vessel Internals ML19092A1562018-09-18018 September 2018 EQSD-I, Rev 14 ML18093B0112018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Classification Design Basis Document, EQSD-I Rev 13 ML18093B0132018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Qualification Summary Document, EQSD-II, Rev 30, Redacted WO 19-0010, EQSD-II, Rev 312018-02-19019 February 2018 EQSD-II, Rev 31 ML18023A1572018-01-18018 January 2018 Submittal of Blind Sample Error Investigation Report ML17241A2512017-11-0808 November 2017 Staff Assessment of Flooding Focused Evaluation ML17234A4002017-08-17017 August 2017 Summary of Changes to Three Forms That Implement Radiological Emergency Response Plan (RERP) ML17093A6652017-03-27027 March 2017 Report on Financial Protection Levels ML17151B0452017-03-0909 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted ML17151B0442017-03-0202 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 1 ML17072A0512017-03-0202 March 2017 Biennial 50.59 Evaluation Report for 01/01/2015 - 12/31/2016 ML17151B0432017-01-26026 January 2017 Equipment Qualification Design Basis Document, EQSD-I, Rev 11 ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays ET 17-0005, 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS2016-12-15015 December 2016 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document.2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. ML16204A1802016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. WM 16-0008, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted2016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted ML15314A6572015-11-0404 November 2015 Submittal of 10 CFR 50.46 Thirty Day Report of Emergency Core Cooling System (ECCS) Model Changes ML17151B0392015-10-26026 October 2015 E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation ET 16-0003, Flood Hazard Reevaluation Report, Revision 12015-10-21021 October 2015 Flood Hazard Reevaluation Report, Revision 1 ML15216A3202015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights ML15075A0282015-03-0404 March 2015 Biennial 50.59 Evaluation Report ML15062A2752015-02-24024 February 2015 Pressure and Temperature Limits Report, Revision 2 ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-23023 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 2023-09-01
[Table view] Category:Technical
MONTHYEARML23244A2142023-09-0101 September 2023 IAEA Osart Report ML23135A2012022-12-0606 December 2022 EQSD-I, Rev 18, Equipment Qualification Design Basis Document ML23135A1932022-09-0101 September 2022 EQSD-II, Rev 34, Equipment Qualification Summary Document WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML22152A2042022-05-18018 May 2022 EQSD-I, Revision 16, Equipment Qualification Design Basis Document ML22152A1992022-05-18018 May 2022 EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) ML22152A1942022-05-18018 May 2022 EQSD-I, Revision 15, Equipment Qualification Design Basis Document ML23135A2072022-04-0606 April 2022 EQSD-I, Rev 17, Equipment Qualification Design Basis Document ML20290A6192020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, EQSD-I, Rev. 14, Equipment Qualification Design Basis Document ML19092A1562018-09-18018 September 2018 EQSD-I, Rev 14 ML18093B0112018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Classification Design Basis Document, EQSD-I Rev 13 ML18093B0132018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Qualification Summary Document, EQSD-II, Rev 30, Redacted WO 19-0010, EQSD-II, Rev 312018-02-19019 February 2018 EQSD-II, Rev 31 ML17151B0452017-03-0909 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted ML17151B0442017-03-0202 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 1 ML17151B0432017-01-26026 January 2017 Equipment Qualification Design Basis Document, EQSD-I, Rev 11 ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document.2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. ML16204A1802016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. WM 16-0008, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted2016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted ML17151B0392015-10-26026 October 2015 E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation ML15062A2752015-02-24024 February 2015 Pressure and Temperature Limits Report, Revision 2 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14064A3292014-02-26026 February 2014 NP-Attachment to LTR-LIS-13-557, Rev 0, Application of Westinghouse Best-Estimate Large Break LOCA Methodology to the Wolf Creek Generating Station ET 14-0009, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2014-02-25025 February 2014 Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML14034A0542014-02-12012 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML14023A6142014-02-0303 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Wolf Creek Generating Station, TAC No.: MF0788 ML13247A0772013-08-31031 August 2013 WCAP-17658-NP, Rev. 0, Wolf Creek Generating Station Transition of Methods for Core Design and Safety Analyses - Licensing Report ML13247A0782013-08-31031 August 2013 WCAP-17746-NP, Rev. 0 Westinghouse Setpoint Methodology as Applied to the Wolf Creek Generating Station ML13247A0792013-08-31031 August 2013 WCAP-17602-NP, Rev. 0, Westinghouse Setpoint Calculations for the Wolf Creek Generating Station Control, Protection, and Indication Systems ML13247A0802013-08-13013 August 2013 Full Scope Implementation of the Alternative Source Term ML13177A2852013-06-30030 June 2013 WCAP-17678-NP, Supplement 1, Revision 1, Wolf Creek Generating Station Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Part 3 of 3 ML12340A3982012-11-30030 November 2012 PEUS-WR-12-5, Revision 1, Wolf Creek Nuclear Operating Corporation Post Fukushima Flooding Walkdown Report ML1222602142012-08-16016 August 2012 Iolb Evaluation of Ifr 2012-04 Relating to Wolf Creek Loss of Offsite Power and Notification of Unusual Event ML12129A3872011-08-30030 August 2011 Enclosure III, Wolf Creek Nuclear Operating Corporation Administrative Procedure AP 31A-100, Revision 8, Solid Radwaste Process Control Program. ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0822702982008-07-30030 July 2008 CS Innovations Report 6002-00002, Rev. 2, Als Configuration Management Plan, Non-Proprietary, Enclosure II ML0822703012008-07-29029 July 2008 CS Innovations Report 6002-00026, Rev. 1, Als Platform Overview, Non-Proprietary, Enclosure Viii ML0822703002008-07-29029 July 2008 CS Innovations Report 6101-00200, Rev. 3, Msfis V & V Report, Non-Proprietary, Enclosure VI ML0822702992008-07-29029 July 2008 CS Innovations Report 6002-00001, Rev. 2, Als Quality Assurance Plan, Non-proprietary, Enclosure IV ET 08-0032, Submittal of Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2008-05-14014 May 2008 Submittal of Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification ML0804401002008-01-31031 January 2008 Westinghouse Electric Company LLC LTR-CDME-08-11 NP-Attachment, Interim Alternate Repair Criterion (ARC) for Cracks in the Lower Region of the Tubesheet Expansion Zone ML0727506142007-09-24024 September 2007 LTR-CDME-07-198 NP-Attachment, Response to NRC RAI Relating to LTR-CDME-07-72 P-Attachment and LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request. ML0724703942007-08-31031 August 2007 Final Report on Implication of Wolf Creek Indications. ML0719700832007-07-14014 July 2007 Draft a EPRI Report: Advanced Fea Industry Corres Presentation Studies ML0720003122007-07-13013 July 2007 Summary of Impact to Wolf Creek License Renewal Application Severe Accident Mitigation Alternatives Analysis Due to Computer Program Error ML0715603982007-04-30030 April 2007 Evaluation of Circumferential Indications in Pressurizer Nozzle Dissimilar Metal Welds at the Wolf Creek Power Plant - Non-Proprietary Report ET 07-0008, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-04-18018 April 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification ML0708001982007-03-13013 March 2007 9100-00003-NP, Rev. 1, Wolf Creek Generating Station Main Steam and Feedwater Isolation System (Msfis) Controls Summary. ML0702401592007-01-22022 January 2007 MRP 2007-003 Attachment 1, Implications of Wolf Creek Pressurizer Butt Weld Indications Relative to Safety Assessment and Inspection Requirements. 2023-09-01
[Table view] |
Text
Enclosure II to GC 08-0024 CS Innovations Report 6002-00002, "ALS Configuration Management Plan," Rev. 2, Non-proprietary
Vendor Submittal Approyal M AIN STEAM & FEEDWATER.R ISOLATIONN SYSTEM (M'S FIS)
CONTROLS REPLACEMENT
- 4.
VEN D OR SU B MI TTAL APP ROVAL Name/Description Document Date Vendor Comments
- /Rev Submitted Name Al
,S"CM Plan 6002-00002 .7/29/2008 CSlnnovafions The pi.pOseofT Revisioh 2isto provide
.Rev.2 *"a pprOpit')etary'd'inon-froprietarjy r, versions of the' doctumet. No other significaiit"clianges tothe, previousl y approved Revisioni.
Approver Signature Approval Date 7/30/2008 Wolf Creek Nuclear Operating Corporation PO Box41i1 1550 Oxen Lane,. NE Burlington, KS 66839:
Revision 0 Page I of I
CS Innovations Non-Proprietary ALS Advanced Logic System 6002-00002 ALS Configuration Management Plan Revision 2 July 28, 2008 CS Innovations, LLC Scottsdale, AZ
© 2008 CS Innovations, LLC All Rights Reserved
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC CS Innovations, LLC 9150 E Del Camino, Suite 110 Scottsdale, AZ, 85258 (623) 505-1055 Phone (623) 505-1055 Fax 6002-00002 - ALS Configuration Management Plan Revision 2 July 28, 2008 APPROVALS Approvals are available in the proprietary version of the document.
6002-00002, Rev 2 CS Innovations LLC 2008 Page 2 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC RECORD OF CHANGES Revision Date Description of changes Made by 1 Feb 21 2008 Initial release Sten Sogaard 2 July 28 2008 Added Proprietary / Non-Proprietary statements. Sten Sogaard OPEN ITEMS Item Description Status
__ .1 I 6002-00002, Rev 2 CS Innovations LLC 2008 Page 3 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC Table of Content 1 Introd u c tio n ........................................................................................................................................................ 5 1.1 P u rp o s e ..................................................................................................................................................... 5 1.2 S c o p e ........................................................................................................................................................ 5 1.2.1 ALS Development Overview ................................................................................................... 5 1.2.2 ALS Board Configuration Items ............................................................................................... 7 1.2.3 Support Configuration Items .................................................................................................... 7 1.2.4 Other Configuration Items ...................................................................................................... 8 1.2 .5 Lim ita tion s ..................................................................................................................................... 8 1.3 Re fe re n c e s ................................................................................................................................................ 9 2 CM Management ................................................................................................................................................ 9 2 .1 O rg a n iz a tio n ............................................................................................................................................ 10 2.2 CM Responsibilities ......................................................................................................... *....................... 11 2.3 Applicable policies, directives, and procedures ................................................................................. 11 3 C M A ctiv itie s .................................................................................................................................................... 12 3.1 Configuration Identification ..................................................................................................................... 12 3.1.1 Configuration Items (CIs) ...................................................................................................... 12 3.1.2 Naming Configuration Items .................................................................................................. 15 3.1.3 Acquiring Configuration Items ............................................................................................... 16 3.1.4 Control of Software Tools ...................................................................................................... 16 3.2 Configuration Control .............................................................................................................................. 16 3.2.1 Change Control ........................................................................................................................... 16 3.2.2 Change Control Prior to Baseline ........................................................................................... 17 3.2.3 Configuration Item Release, Archive and Retrieve Activities ................................................ 17 3.2.4 Issue Reporting, Tracking and Corrective Action Activities .................................................. 17 3.2.5 Approval Authority - the Change Control Board (CCB) ....................................................... 18 I 3.3 Status Accounting ................................................................................................................................... 18 I 3.4 Configuration Audits and Reviews .................................................................................................... 19 4 S c h e d u le s ......................................................................................................................................................... 20 5 R e s o u rc e s ........................................................................................................................................................ 21 6 Plan Maintenance ............................................................................................................................................ 22 6 .1 R e s p o n sib ilitie s ....................................................................................................................................... 22 6.2 Change Approvals .................................................................................................................................. 22 6002-00002, Rev 2 CS Innovations LLC 2008 Page 4 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC Introduction 1.1 Purpose The ALS Configuration Management Plan (ALS CM Plan) describes the CM organization and practices used for I baseline control of ALS related configuration items. The ALS CM Plan is a platform specific CM Plan used for initial design activities related to ALS boards, but also for modifications to released ALS boards after baselining.
Modifications include changes to ALS board hardware design, FPGA design or SetPoints.
1.2 Scope The ALS CM Plan is to be applied consistently and uniformly throughout the life cycle of ALS boards. The intended audience for the ALS CM Plan is CS Innovations personnel associated with managing, developing, reviewing, and providing quality assurance of ALS based products.
The CM Plan is based on the guidance provided in IEEE Std 828-1998 and CS Innovations' QA Manual.
1.2.1 ALS Development Overview The Advanced Logic System (ALS) technology is a control system platform designed by CS Innovations. The focus of the ALS technology is to make a reliable and deterministic control system which may be used in applications where safety is in focus. The ALS platform consists of control, input, output, and service boards mounted in 19" sub-racks to provide a specific control solution.
The ALS platform is 19" rack mountable where sub-racks are configured with ALS board to perform a specific function. A sub-rack backplane allows for intercommunication between the ALS boards and for ALS input and output boards to connect to field signals. The field connectors will normally be accessible from the back side of the sub-rack.
Each ALS board is developed in an independent development flow with separate:
- Requirements 0 Specifications 6002-00002, Rev 2 CS Innovations LLC 2008 Page 5 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC L
The ALS board developments may run in parallel, or be spread out over time. CS Innovations will add additional ALS board developments as needs and markets are identified. Whenever new ALS board developments are added it will result in a new revision of the project management plan. Figure 2 illustrates how ALS board developments are performed in parallel with additional developments being added as needed.
Management
' i..........................
l .-_-_.7.......
DocumentsI 1iiii21121...
Board Spefi Board Specfi Board Specific Doiume Dor uments Df Documents Figure 2: Multiple AILS board developments of the same Project Management documents.
CS Innovations LLC 2008 Page 6 of 27 6002-00002, Rev Rev 2 2 CS Innovations LILC 2008 Page 6 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 1.2.2 ALS Board Configuration Items The ALS board itself consists of the following 3 Configuration Items (CIs):
Table 1: Ownership of ALS Board Cis 1.2.3 Support Configuration Items 1.2.3.1 Hardware and software used for programming FPGA The FPGA Image is programmed/burned into the FPGA using the appropriate programming tool endorsed by the FPGA manufacturer.
CS Innovations LLC 2008 Page 7 of 27 Rev 2 6002-00002, Rev 2 CS Innovations LLC 2008 Page 7 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 1.2.4 Other Configuration Items 1.2.5 Limitations N/A 6002-00002, Rev 2 CS Innovations LLC 2008 Page 8 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 1.4 Terms and Abbreviations Generally all terms and abbreviations are defined at the first instance of use with the exception of terms and abbreviations which are determined to be industry standard. For a complete list refer to 6002-00040 which defines common terms and abbreviations used in the ALS Platform.
6002-00002, Rev 2 CS Innovations LLC 2008 Page 9 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC SCM Management 2.1 Organization Figure 3 shows the organizational structure of the development organization. CS Innovations is a small organization with a small management team, as a result some activities which in larger organizations require a separate management have been merged (e.g. Manufacturing and Engineering are under the Project Managers control).
IPresident/EO C Quality Assurance Development Figure 3: Organizational Structure CS Innovations LLC 2008 Page 10of27 Rev 2 6002-00002, Rev 6002-00002, 2 CS Innovations LILC 2008 Page 10 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 2.2 CM Responsibilities Table 2: CM Roles and Responsibilities 2.3 Applicable policies, directives, and procedures All activities performed in the ALS CM Plan shall be conducted in accordance with:
- 9000-00000 - "Quality Assurance Manual", CS Innovations, LLC, Revision 3
- 6002-00001 - "ALS Quality Assurance Plan", CS Innovations, LLC All configuration items must be reviewed and approved prior to release following the document control requirements defined by the CS Innovations Quality Assurance program. (Reference 9000-00600)
- 9000-00600 - "Document Control", CS Innovations, LLC 6002-00002, Rev 2 CS Innovations LLC 2008 Page 11 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC CM Activities 3.1 Configuration Identification A Configuration Item (CI) is an object or collection of objects that are treated as a self-contained unit for the purpose of version control. Unique identifiers are assigned to all Cl's according to the document control procedures defined by the CS Innovations Quality Assurance Program (Reference 9000-00600).
K 3.1.1 Configuration Items (Cis)
All Cis associated with an ALS project are listed on the template in Appendix B. When an ALS board development is initiated, an Excel Spreadsheet containing the information show in Appendix B is prepared and placed in:
CVS: /D002/ALS-xyz/doc/ALS-xyz CM Report/Configuration Status.xls The document is created and maintained by the person responsible for Configuration Management, generally the Project Manager.
As documents are completed and assigned a revision number the spreadsheet is updated to reflect the newest information. The Project Manager is responsible for identifying and adding Cl's to the spreadsheet as needed.
The Configuration Status.xls document is printed to PDF files at milestones, baselines, and other points of interest during the board development and will later be used as a part of the CM report. The PDF printout must be reviewed and approved according to the document control procedure on baselines and releases.
CS Innovations LLC 2008 Page 12 of 27 6002-00002, Rev 6002-00002, Rev 2 2 CS Innovations LILC 2008 Page 12 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 6002-00002, Rev 2 CS Innovations LLC 2008 Page 13 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 3.1.1.2 Release Area 3.1.1.3 Baseline I-6002-00002, Rev, 2 CS Innovations LLC 2008 Page 14 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 3.1.2 Naming Configuration Items All documents are assigned a unique CS Innovations Part Number. Documents are named:
3.1.2.1 Identification of the ALS board 6002-00002, Rev 2 CS Innovations LLC 2008 Page 15 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC P
CD 3.1.3 Acquiring Configuration Items All configuration items are released under their revision number following the document control procedure described by the CS Innovations QA program (reference 9000-00600).
3.1.4 KP Control of Software Tools The exact revision number and storage location of each software tool used in the ALS development are tracked on the Configuration Status spreadsheet. (Reference Appendix B).
3.2 Configuration Control Configuration control describes the activities for requesting, evaluating, approving or disapproving, and implementing changes to baselined configuration items.
3.2.1 Change Control The purpose of the change control activities is to ensure the recording, evaluation, resolution and approval of changes. The Cl must be baselined according to the schedule shown in Chapter 4.
Guidance includes:
- 1) Change control shall preserve the integrity of the configuration items by providing protection against unauthorized change.
CS Innovations LLC 2008 Page 16of27 6002-00002, Rev 6002-00002, Rev 22 CS Innovations LLC 2008 Page 16 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC
- 2) Change control shall ensure a change is assessed to determine whether or not the configuration identity needs to be updated
- 3) Changes to configuration items under change control should be recorded, approved, and tracked.
- 4) Change control should ensure traceability of changes to the reason for the change
- 5) Change control should ensure that the impact of the change is assessed to determine the effect of the change on the outputs of the processes and that the output data is updated
- 6) Change control should ensure that feedback is provided to affected processes 3.2.2 Change Control Prior to Baseline 3.2.3 Configuration Item Release, Archive and Retrieve Activities The purpose of the release activity is to place data items under configuration management control to ensure that only authorized data is used in other activities, and to ensure that data items associated with the product can be retrieved in case of a need to duplicate, regenerate, re-test or modify the product.
CS Innovation document control procedure (Reference 9000-00600) must be followed for all releases.
3.2.4 Issue Reporting, Tracking and Corrective Action Activities The purpose of issue reporting, tracking and corrective action is to record problems and ensure correct disposition and resolution. Problems may include non-compliance with specifications or standards, deficiencies of life cycle process outputs, anomalous behavior of products, and inadequacy or deficiency of tools and technology processes.
Issue reporting should be implemented no later than the establishment of a baselined.
cs Innovations LLC 2008 Page 17 of 27 Rev 2 6002-00002, Rev 6002-00002, 2 CS Innovations LLC 2008 Page 17 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 3.2.5 Approval Authority - the Change Control Board (CCB)
Approval authority for baselining and acceptance/rejection of ECNs shall be placed to members of the CCB.
CSI's CCB has the following members:
" President
" Project manager 3.3 Status Accounting 6002-00002, Rev 2 CS Innovations LLC 2008 Page 18 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 3.4 Configuration Audits and Reviews 3.4.1 Internal Reviews 3.4.2 Managerial Reviews I
6002-00002, Rev 2 CS Innovations LLC 2008 Page 19 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC Schedaules Rev 22 Cs Innovations LLC 2008 Page 20 of 27 6002-00002, Rev 6002-00002, CS Innovations LLC 2008 Page 20 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC Resources The tools, techniques, and procedures identified in the ALS CM Plan are similar or identical to the procedures described in the CS Innovations Quality Assurance Manual. CS Innovations personnel require no additional training to follow the ALS CM Plan.
6002-00002, Rev 2 CS Innovations LLC 2008 Page 21 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC Plan: Maintenance.
This plan may be amended as necessary. All revisions must be reviewed and approved following the document control procedure (Reference 9000-00600).
6.1 Responsibilities The Project Manager is responsible for monitoring the ALS CM Plan to ensure and request/perform changes if needed.
The Project Manager is responsible for maintaining the CM Report including (Reference 5.2).
6.2 Change Approvals All changes to the CM Plan must be reviewed by the President, the Project Manager, and the ALS QA Manager.
6002-00002, Rev 2 CS Innovations LLC 2008 Page 22 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC Cs Innovations LLC 2008 Page 23 of 27 Rev 2 6002-00002, I~ev
~OO2-OOOO2, 2 CS Innovations LLC 2008 Page 23 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 6002-00002, Rev 2 CS Innovations LLC 2008 Page 24 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC P)
Cs Innovations LLC 2008 Page 25 of 27 6002-00002, Rev 22 6002-00002, Rev CS Innovations LLC 2008 Page 25 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC CD 6002-00002, Rev 2 CS Innovations LLC 2008 Confidential and Proprietary Page 26 of 27
ALS Configuration Management Plan Non-Proprietary CS Innovations LLC ALS Configuration Management Plan Non-Proprietary CS Innovations LLC 6002-00002, Rev 2 CS Innovations LLC 2008 Confidential and Proprietary Page 27 of 27