{{#Wiki_filter:April 26, 2016
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 April 26, 2016 Mr. Eric McCartney Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
 
==SUBJECT:==
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
  - NRC SECURITY BASELINE INSPECTION REPORT 05000 26 6/201640 4; 05000301/2016404
  - NRC SECURITY BASELINE INSPECTION REPORT 05000 26 6/201640 4; 05000301/2016404



Revision as of 00:38, 14 July 2019

NRC Security Baseline Inspection Report 05000266/2016404; 05000301/2016404, April 15, 2016, (Cover Letter Only)
ML16117A256
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/26/2016
From: Steven Orth
Plant Support Branch II
To: Mccartney E
Point Beach
References
IR 2016404
Download: ML16117A256 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 April 26, 2016 Mr. Eric McCartney Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

- NRC SECURITY BASELINE INSPECTION REPORT 05000 26 6/201640 4; 05000301/2016404

Dear Mr. McCartney:

On April 15, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Point Beach Nuclear Plant, Units 1 and 2. On April 15, 2016, the NRC inspector discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, the inspector documented a licensee-identified violation

, which was determined to be of very low security significance in this report. The NRC is treating this violation as a N on-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Point Beach Nuclear Plant. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No s. 50-266; 50-301 License No s. DPR-24; DPR-27 Nonpublic Enclosure:

IR 0500026 6/201 6 404; 05000301/2016404 cc: B. Kopetsky, Security Manager M. Millen, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and Chief Nuclear Officer cc w/o encl: