| Q | CCA | Title |
---|
05000266/FIN-2015007-01 | 2015Q3 | P.3 | Failure to Demonstrate the Functionality of a Credited Safe Shutdown Component |
05000266/FIN-2015010-01 | 2015Q3 | | Failure to Evaluate Containment Spray System for Potential Gas Intrusion |
05000266/FIN-2015003-01 | 2015Q3 | P.2 | Incomplete Functionality Assessment for Flooding in the Diesel Generator Building |
05000266/FIN-2015003-02 | 2015Q3 | | Potential Failure of Multiple Safety-Related Trains During Flooding Events |
05000266/FIN-2015003-03 | 2015Q3 | | Failure to Perform a Written Safety Evaluation for FSAR Changes |
05000266/FIN-2015004-01 | 2015Q4 | H.9 | Failure to Follow Fire Protection Program Requirements for Care, Use and Maintenance of Fire Hose |
05000301/FIN-2015004-02 | 2015Q4 | H.4 | Inadequate Evaluation of Non-Conforming Auxiliary Feedwater System Pipe Defects |
05000301/FIN-2016001-01 | 2016Q1 | H.1 | Failure to Follow Electrical Safety Procedures Results in Plant Transient |
05000266/FIN-2016002-01 | 2016Q2 | H.10 | Failure to Perform Required Fire Watches in Areas Containing Transient Combustibles |
05000266/FIN-2016002-04 | 2016Q2 | H.11 | Violation of Technical Specifications During Mode 4 Entry with LCO 3.6.6 Not Met |
05000266/FIN-2016002-05 | 2016Q2 | H.12 | Fuel Assembly Move Sequence Planned Incorrectly |
05000266/FIN-2016002-06 | 2016Q2 | H.12 | Incorrect Wiring Causes Transformer Lockout |
05000266/FIN-2016002-02 | 2016Q2 | P.2 | Submerged Safety-Related EDG Fuel Oil Transfer Pump Cables |
05000266/FIN-2016002-03 | 2016Q2 | | Suitability of Reactor Protection System and Engineered Safeguards System Components |