{{#Wiki_filter:PRIORITY (ACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9502130285 DOC.DATE: 95/02/03 NOTARIZED:
{{#Wiki_filter:PRIORITY (ACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-244 RobertEmmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WYDAY,Z.A.
ACCESSION NBR:9502130285                 DOC.DATE: 95/02/03           NOTARIZED: NO         DOCKET FACIL:50-244 RobertEmmet Ginna Nuclear Plant, Unit 1, Rochester                           G 05000244 AUTH. NAME             AUTHOR AFFILIATION WYDAY,Z.A.             Rochester Ges & Electric Corp.                                               pi RECIP.NAME             RECIPIENT AFFILIATION JOHNSON,A.                 Project Directorate I-3 (PDl-3) (Post               941001)
Rochester Ges&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.
Project Directorate I-3 (PDl-3)(Post 941001)


==SUBJECT:==
==SUBJECT:==
Rev 5 to Att-17.0,"Attachment SD-1." W/950203 ltr.DISTRIBUTION CODE A045D COPIES RECEIVED:LTR J ENCL SIZE: TITLE: OR Submittal:
Rev 5     to Att-17.0, "Attachment SD-1." W/950203                     ltr.
Emergency Preparedness,Pla s, Implement'g Procedures, C pi 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DISTRIBUTION CODE         A045D       COPIES RECEIVED:LTR         J   ENCL     SIZE:
05000244 R RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL~ICE CENTER P1~NUDOCS A'BSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A NRR/DRSS/PEPB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 D 0 U N NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: OR Submittal: Emergency Preparedness,Pla s, Implement'g Procedures, C                       0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).                           05000244 R
PLEASE HELP US TO REDUCE iVASTE!CONTACI'THE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT.504-2083)TO E Llih!INATE YOUR NAME FRO~I DISTRIBUTION LISTS FOR DOCI;MENTS YOU DON" I'LED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7 t<<P,/.<<III<<I
RECIPIENT                 COPIES                  RECIPIENT        COPIES ID CODE/NAME              LTTR ENCL            ID CODE/NAME     LTTR ENCL PD1-3 PD                         1      1      JOHNSON,A              1    1 INTERNAL ~ICE CENTER P1                     1      1      NRR/DRSS/PEPB          1    1
<<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TELEPHONE AREA COOE 71B 546-2700 February 3, 1995 Mr.Allen Johnson Project Directorate I-3 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
        ~NUDOCS A'BSTRACT                   1      1 EXTERNAL: NOAC                               1       1       NRC PDR               1     1 D
0 U
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACI'THE DOCUMENTCONTROL DESK, ROOM PI -37 (EXT. 504-2083 ) TO E Llih!INATE YOUR NAME FRO~I DISTRIBUTION LISTS FOR DOCI;MENTS YOU DON"I'LED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                         7   ENCL     7
 
t   <<P,/.<<III<<I
        <<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N. Y.             14649-0001 TELEPHONE AREA COOE 71B 546-2700 February 3, 1995 Mr. Allen Johnson Project Directorate I-3 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Emergency Operating Procedures R.E.Ginna Nuclear Power Plant Docket No.50-244  
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Johnson:==


==Dear Mr.Johnson:==
As requested, enclosed are Ginna Station Emergency Operating Procedures.
As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very Truly Yours, a.d oseph A.Widay JAW/jdw xc: Mr.Lee Bettenhausen, USNRC, Region 1 Resident Inspector, Ginna Station RG&E Nuclear Safety&Licensing y/,on2S 9502130285 950203 PDR ADOCK 05000244 F PDR Page 2  
Very Truly Yours, a.d oseph A. Widay JAW/jdw xc:       Mr. Lee Bettenhausen, USNRC, Region             1 Resident Inspector, Ginna Station RG&E Nuclear Safety & Licensing y/,on2S 9502130285 950203 PDR     ADOCK 05000244 F                                 PDR
 
Page 2


==Enclosures:==
==Enclosures:==


ATT-17.0 Revision 5 EOP: ATT-17.0 1'ILE: ATTACHMENT SD-1 REV: 4 PAGE 1/of 2 Su rintendent Date 7 Perf m the following local actions to complete normal secondary syste shutdown: ose reheater 4th pass temperature control valves: V-2432 (SW corner 1A MSR)o V-2433 (SW corner 1B MSR)o V-2434 (SW corner 2A MSR)o-2435 (SW corner 2B MSR)Close r heater steam chain valves: o V-3 50 (SW of 1B MSR)o V-35 1 (SW of 1b MSR)o V-355 (NW of 1A MSR)o V-3553 (NW of 1A MSR)0 Open Reheater steamline vents middle floor): o V-8500 o V-8501 o V-8502 o V-8504 o V-8505 SW corner of condenser, Close flange heting solation valves: o MOV-3601A (TB i die Lvl West of TURB L.O.Reservoir) o MOV-3602A NOTE: IF either S/G p essure i LESS THAN condensate header pressure, THEN manual iso ation of the MFW regulating and bypass valve should be c sidered before aligning for cooldown re irculation.
ATT-17.0   Revision 5
Open the ollowing valves to align for condensate feed system oldown RECIRC: o V 982B (at N5 heater ou et header)o-3983B (at N5 heater out et header)o V-4363 (at N5 heater outle header)o V-4365 (by MFW regulating ives)V-4361 (southwest corner of condenser, middle floor)o V-3976A MFP A discharge valv bypass valve o V-3977A MFP B discharge valve bypass valve Secure all 5 secondary chemical add tion pumps on TURB BLDG middle floor by N5 heaters.o Secure all 3 ammonia pumps, TURB BLDG basement by MCC A.  
 
+1 Q I I A t l t EOP: ATT-17.0 ATTACHMENT SD-1 REV: 4 PAGE 2 of 2 o Isolate SW from the following coolers: o MFW Pump Oil Coolers (MFW pump room)o V-4703 o V-4704 o Exciter Air Cooler: o V-4679 (chain valve next to condensate transfer pump)o Bus Duct Air Cooler (TURB BLDG basement East of bus duct cooler)o V-4674 o V-4674C (mini bypass around V-4674)o Throttle SW as necessary from following coolers: o Generator Seal Oil Unit Coolers (H2 side and air side): o V-4674A (mini bypass disch valve inside seal oil enclosure Bldg.NW corner)o V-4677A (mini bypass disch valve inside seal oil enclosure Bldg.NW corner)o Main Lube Oil Coolers (SW corner of Turb Oil Reservoir) o V-4691 o V-4692 o WHEN the turbine shaft stops, THEN notify Control Room.Control Room personnel will determine if adequate power available to start turning gear.o Transfer house heating steam to house heating boiler if necessary (refer to T-35H, NUCLEAR HOUSE HEATING STEAM TO BOILER STEAM SUPPLY CHANGE).o Perform T-14G, STEAM GENERATOR BLOWDOWN HEAT RECOVERY SYSTEM SHUTDOWN.o Restore MAKEUP to CSTs as directed by Control Room.  
EOP:           1'  ILE:
REV: 4 ATT-17.0                                   ATTACHMENT SD-1 PAGE 1/of 2 Su   rintendent                                     Date 7 Perf m the following local actions to complete normal secondary syste   shutdown:
ose reheater 4th pass temperature               control valves:
V-2432 (SW corner 1A MSR) o V-2433 (SW corner 1B MSR) o V-2434 (SW corner 2A MSR) o       -2435 (SW corner 2B MSR)
Close       r heater     steam chain valves:
o     V-3 50     (SW of   1B MSR) o     V-35 1     (SW of   1b MSR) o     V-355       (NW   of 1A MSR) o     V-3553     (NW   of 1A MSR) 0   Open Reheater           steamline vents     SW  corner of condenser, middle       floor):
o     V-8500 o   V-8501 o     V-8502 o     V-8504 o     V-8505 Close flange heting             solation valves:
o     MOV-3601A (TB         i die Lvl West of   TURB   L.O. Reservoir) o   MOV-3602A NOTE:   IF either S/G p essure i LESS THAN condensate header pressure, THEN manual iso ation of the MFW regulating and bypass valve should be c sidered before aligning for cooldown re irculation.
Open the ollowing valves to align for condensate feed system         oldown RECIRC:
o V 982B (at N5 heater ou et header) o     -3983B (at N5 heater out et header) o V-4363 (at N5 heater outle header) o V-4365 (by MFW regulating               ives)
V-4361 (southwest corner of condenser, middle floor) o V-3976A MFP A discharge valv bypass valve o V-3977A MFP B discharge valve bypass valve Secure       all 5   secondary chemical add       tion   pumps on TURB BLDG       middle   floor   by N5 heaters.
o   Secure       all 3   ammonia pumps,   TURB BLDG     basement   by MCC A.
 
        +1     I Q
I t l A t
 
EOP:
REV: 4 ATT-17.0                       ATTACHMENT SD-1 PAGE 2 of 2 o Isolate   SW from the following coolers:
o   MFW Pump   Oil Coolers (MFW pump room) o   V-4703 o   V-4704 o   Exciter Air Cooler:
o V-4679 (chain valve next to condensate transfer pump) o   Bus Duct Air Cooler (TURB BLDG basement East of bus duct cooler) o   V-4674 o   V-4674C (mini bypass around V-4674) o Throttle   SW as necessary   from following coolers:
o   Generator Seal Oil Unit Coolers (H2 side and air side):
o V-4674A (mini bypass disch valve inside seal oil enclosure Bldg. NW corner) o V-4677A (mini bypass disch valve inside seal oil enclosure Bldg. NW corner) o   Main Lube Oil Coolers (SW corner of Turb Oil Reservoir) o V-4691 o   V-4692 the turbine shaft stops,     THEN notify Control o  WHEN Room. Control Room personnel available to start will determine turning gear.
if adequate power o Transfer house heating steam to house       heating boiler if necessary (refer to T-35H, NUCLEAR HOUSE       HEATING STEAM TO BOILER STEAM SUPPLY CHANGE).
o Perform T-14G,   STEAM GENERATOR BLOWDOWN HEAT RECOVERY SYSTEM SHUTDOWN.
o Restore   MAKEUP to CSTs as   directed by Control Room.
 
-~}}
-~}}

Latest revision as of 18:17, 29 October 2019

Rev 5 to Att-17.0, Attachment SD-1. W/950203 Ltr
ML17263A933
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/03/1995
From: Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
ATT-17.0, NUDOCS 9502130285
Download: ML17263A933 (7)


Text

PRIORITY (ACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9502130285 DOC.DATE: 95/02/03 NOTARIZED: NO DOCKET FACIL:50-244 RobertEmmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WYDAY,Z.A. Rochester Ges & Electric Corp. pi RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A. Project Directorate I-3 (PDl-3) (Post 941001)

SUBJECT:

Rev 5 to Att-17.0, "Attachment SD-1." W/950203 ltr.

DISTRIBUTION CODE A045D COPIES RECEIVED:LTR J ENCL SIZE:

TITLE: OR Submittal: Emergency Preparedness,Pla s, Implement'g Procedures, C 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 R

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL ~ICE CENTER P1 1 1 NRR/DRSS/PEPB 1 1

~NUDOCS A'BSTRACT 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

0 U

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACI'THE DOCUMENTCONTROL DESK, ROOM PI -37 (EXT. 504-2083 ) TO E Llih!INATE YOUR NAME FRO~I DISTRIBUTION LISTS FOR DOCI;MENTS YOU DON"I'LED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7

t <<P,/.<<III<<I

<<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N. Y. 14649-0001 TELEPHONE AREA COOE 71B 546-2700 February 3, 1995 Mr. Allen Johnson Project Directorate I-3 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very Truly Yours, a.d oseph A. Widay JAW/jdw xc: Mr. Lee Bettenhausen, USNRC, Region 1 Resident Inspector, Ginna Station RG&E Nuclear Safety & Licensing y/,on2S 9502130285 950203 PDR ADOCK 05000244 F PDR

Page 2

Enclosures:

ATT-17.0 Revision 5

EOP: 1' ILE:

REV: 4 ATT-17.0 ATTACHMENT SD-1 PAGE 1/of 2 Su rintendent Date 7 Perf m the following local actions to complete normal secondary syste shutdown:

ose reheater 4th pass temperature control valves:

V-2432 (SW corner 1A MSR) o V-2433 (SW corner 1B MSR) o V-2434 (SW corner 2A MSR) o -2435 (SW corner 2B MSR)

Close r heater steam chain valves:

o V-3 50 (SW of 1B MSR) o V-35 1 (SW of 1b MSR) o V-355 (NW of 1A MSR) o V-3553 (NW of 1A MSR) 0 Open Reheater steamline vents SW corner of condenser, middle floor):

o V-8500 o V-8501 o V-8502 o V-8504 o V-8505 Close flange heting solation valves:

o MOV-3601A (TB i die Lvl West of TURB L.O. Reservoir) o MOV-3602A NOTE: IF either S/G p essure i LESS THAN condensate header pressure, THEN manual iso ation of the MFW regulating and bypass valve should be c sidered before aligning for cooldown re irculation.

Open the ollowing valves to align for condensate feed system oldown RECIRC:

o V 982B (at N5 heater ou et header) o -3983B (at N5 heater out et header) o V-4363 (at N5 heater outle header) o V-4365 (by MFW regulating ives)

V-4361 (southwest corner of condenser, middle floor) o V-3976A MFP A discharge valv bypass valve o V-3977A MFP B discharge valve bypass valve Secure all 5 secondary chemical add tion pumps on TURB BLDG middle floor by N5 heaters.

o Secure all 3 ammonia pumps, TURB BLDG basement by MCC A.

+1 I Q

I t l A t

EOP:

REV: 4 ATT-17.0 ATTACHMENT SD-1 PAGE 2 of 2 o Isolate SW from the following coolers:

o MFW Pump Oil Coolers (MFW pump room) o V-4703 o V-4704 o Exciter Air Cooler:

o V-4679 (chain valve next to condensate transfer pump) o Bus Duct Air Cooler (TURB BLDG basement East of bus duct cooler) o V-4674 o V-4674C (mini bypass around V-4674) o Throttle SW as necessary from following coolers:

o Generator Seal Oil Unit Coolers (H2 side and air side):

o V-4674A (mini bypass disch valve inside seal oil enclosure Bldg. NW corner) o V-4677A (mini bypass disch valve inside seal oil enclosure Bldg. NW corner) o Main Lube Oil Coolers (SW corner of Turb Oil Reservoir) o V-4691 o V-4692 the turbine shaft stops, THEN notify Control o WHEN Room. Control Room personnel available to start will determine turning gear.

if adequate power o Transfer house heating steam to house heating boiler if necessary (refer to T-35H, NUCLEAR HOUSE HEATING STEAM TO BOILER STEAM SUPPLY CHANGE).

o Perform T-14G, STEAM GENERATOR BLOWDOWN HEAT RECOVERY SYSTEM SHUTDOWN.

o Restore MAKEUP to CSTs as directed by Control Room.

-~