{{#Wiki_filter:SDV Vent and Drain 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves Valves 3.1.8 LCO 3.1.8 APPLICABILITY:
{{#Wiki_filter:SDV Vent and Drain Valves 3.1.8 3.1    REACTIVITY CONTROL SYSTEMS 3.1.8   Scram Discharge Volume (SDV)   Vent and Drain Valves LCO   3.1.8         Each SDV vent and drain valve shall be OPERABLE.
Each SDV vent and drain valve shall be OPERABLE.MODES I and 2.ACTIONS-------------------------------------
APPLICABILITY:      MODES I and 2.
NOTES--------------------------
ACTIONS
: 1. Separate Condition entry is allowed for each SDV vent and drain line.2. An isolated line may be unisolated under administrative draining and venting of the SDV.control to allow CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent A.1 Isolate the 7 days or drain lines with associated line.one valve inoperable.
-------------------------------------   NOTES--------------------------
B. One or more SDV vent B.1 Isolate the 8 hours or drain lines with associated line.both valves inoperable.
: 1. Separate Condition entry is allowed for each SDV vent and drain line.
C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time not met.PERRY -UNIT I 3.1-24 Amendment No145}}
: 2. An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.
CONDITION                   REQUIRED ACTION           COMPLETION TIME A. One or more SDV vent         A.1   Isolate the             7 days or drain lines with                 associated line.
one valve inoperable.
B. One or more SDV vent         B.1   Isolate the             8 hours or drain lines with                 associated line.
both valves inoperable.
C. Required Action and         C.1   Be in MODE 3.             12 hours associated Completion Time not met.
PERRY - UNIT I                         3.1-24                         Amendment No145}}

Latest revision as of 06:02, 23 November 2019

Tech Spec Page for Amendment 145 Scram Discharge Volume Vent and Drain Valves
ML071770466
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/22/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-2
To:
Wengert, Thomas NRR/DORL 415-4037
Shared Package
ML071450238 List:
References
TAC MD3898
Download: ML071770466 (1)


Text

SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves LCO 3.1.8 Each SDV vent and drain valve shall be OPERABLE.

APPLICABILITY: MODES I and 2.

ACTIONS


NOTES--------------------------

1. Separate Condition entry is allowed for each SDV vent and drain line.
2. An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent A.1 Isolate the 7 days or drain lines with associated line.

one valve inoperable.

B. One or more SDV vent B.1 Isolate the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or drain lines with associated line.

both valves inoperable.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

PERRY - UNIT I 3.1-24 Amendment No145