| -2 Draft Request for Additional Regarding Two, 14-Day, One-Time, Completion Times for Offsite Luminant Generation Company, Comanche Peak Nuclear Power Plant, Units 1 and (TAC Nos. MF0405 and The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the Luminant Generation Company LLC License Amendment Request (LAR) dated December 19, 2012 (Agencywide Documents Access ad management System (ADAMS) Accession No. ML 13023A237). | | -2 Draft Request for Additional Regarding Two, 14-Day, One-Time, Completion Times for Offsite Luminant Generation Company, Comanche Peak Nuclear Power Plant, Units 1 and (TAC Nos. MF0405 and The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the Luminant Generation Company LLC License Amendment Request (LAR) dated December 19, 2012 (Agencywide Documents Access ad management System (ADAMS) Accession No. ML 13023A237). |
| Based on its review of the LAR, the staff requests the following additional information: | | Based on its review of the LAR, the staff requests the following additional information: |
| Request for Additional Information (RAI): RAI-1: In the LAR Attachment 1, Section 2.0, Page 3, the following is stated: The proposed changes in Chapters 8 and 9 of the Final Safety Analysis Report (FSAR) (Reference 8.1) (Attachment | | Request for Additional Information (RAI): RAI-1: In the LAR Attachment 1, Section 2.0, Page 3, the following is stated: The proposed changes in Chapters 8 and 9 of the Final Safety Analysis Report (FSAR) (Reference 8.1) (Attachment |
| : 6) reflect ST [startup transformer] | | : 6) reflect ST [startup transformer] |
| XST1 , new alternate ST XST1A, new 138 kV [kilo volt] tower disconnect switches, firewall, and the installation of new cable buses and transfer panels. The FSAR Table and Figures not shown in the Attachment, but which will also be updated, are Table 8.3-3 and Figures 1.2-1, 8.2-1, 8.2-4, 8.2-7, 8.2-9, and 8.2-11. Please provide the following documents: Markup/update of the FSAR Figures 1.2-1, 8.2-1, 8.2-4, 8.2-7. 8.2-9, 8.2-11, and 8.3-1 (Drawing No. E1-0001) (or a relevant portion of the figures/drawings) showing the modifications. Markup of the FSAR Table 8.3-3. RAI-2: In the LAR Attachment 1, Section 4.1, Page 15, the licensee stated that the plant procedure SOP-614A1B "Alternative Power Generator Operations" requires the Alternate Power Diesel Generator (APDG) fuel be replenished every two hours. Please describe how the APDG fuel will be replenished every two hours, if needed, throughout any of two 14-day Completion Times (CTs). | | XST1 , new alternate ST XST1A, new 138 kV [kilo volt] tower disconnect switches, firewall, and the installation of new cable buses and transfer panels. The FSAR Table and Figures not shown in the Attachment, but which will also be updated, are Table 8.3-3 and Figures 1.2-1, 8.2-1, 8.2-4, 8.2-7, 8.2-9, and 8.2-11. Please provide the following documents: Markup/update of the FSAR Figures 1.2-1, 8.2-1, 8.2-4, 8.2-7. 8.2-9, 8.2-11, and 8.3-1 (Drawing No. E1-0001) (or a relevant portion of the figures/drawings) showing the modifications. Markup of the FSAR Table 8.3-3. RAI-2: In the LAR Attachment 1, Section 4.1, Page 15, the licensee stated that the plant procedure SOP-614A1B "Alternative Power Generator Operations" requires the Alternate Power Diesel Generator (APDG) fuel be replenished every two hours. Please describe how the APDG fuel will be replenished every two hours, if needed, throughout any of two 14-day Completion Times (CTs). |
Letter Sequence RAI |
---|
|
|
MONTHYEARCP-201201518, License Amendment Request (LAR) 12-007, Revision to Technical Specification 3.8.1, AC Sources - Operating, for Two 14-Day Completion Times for Offsite Circuits2012-12-19019 December 2012 License Amendment Request (LAR) 12-007, Revision to Technical Specification 3.8.1, AC Sources - Operating, for Two 14-Day Completion Times for Offsite Circuits Project stage: Request ML13032A2412013-01-31031 January 2013 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, for Extension of Two 14-Day Completion Times for Offsite Circuits Project stage: Acceptance Review ML13108A1532013-04-18018 April 2013 Request for Additional Information Email, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, for Extension of Two 14-Day Completion Times for Offsite Circuits (TAC Nos. MF0405 and - Project stage: RAI CP-201300546, Response to Request for Additional Information for License Amendment Request (LAR) 12-007, Revision to Technical Specification 3.8.1, AC Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits2013-05-16016 May 2013 Response to Request for Additional Information for License Amendment Request (LAR) 12-007, Revision to Technical Specification 3.8.1, AC Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits Project stage: Response to RAI ML13232A1432013-09-18018 September 2013 Issuance of Amendment Nos. 160 and 160, Revise Technical Specification 3.8.1, AC Sources - Operating, for Extension of Two 14-Day Completion Times for Offsite Circuits Project stage: Approval CP-201301252, Request for Enforcement Discretion Regarding Compliance with Technical Specifications 3.8.1, AC Sources - Operating.2013-12-0909 December 2013 Request for Enforcement Discretion Regarding Compliance with Technical Specifications 3.8.1, AC Sources - Operating. Project stage: Request CP-201400140, Correction to Figures Provided in Response to Request for Additional Information for LAR 12-007 Regarding Two, 14-Day, One-Time, Completion Times for Offsite Circuits.2014-02-13013 February 2014 Correction to Figures Provided in Response to Request for Additional Information for LAR 12-007 Regarding Two, 14-Day, One-Time, Completion Times for Offsite Circuits. Project stage: Response to RAI 2013-04-18
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24292A0282024-10-18018 October 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Adoption of TSTF-51, TSTF-471, and TSTF-571 ML24262A1302024-09-18018 September 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Multiple Relief Requests for Unit 2 Third Inservice Inspection Interval Due to Impracticality (EPID L-2024-LLR-0053 Through -0058) ML24205A2162024-07-23023 July 2024 September 2024 Emergency Preparedness Program Inspection - Request for Information ML24204A0022024-07-18018 July 2024 NRR E-mail Capture - Request for Additional Information Comanche Peak Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML24095A1532024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Request to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program (EPID 2024-LLA-0023) ML24095A2382024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Request to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24052A0122024-02-16016 February 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ML24033A2642024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Revised Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24036A0122024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24025A0172024-01-22022 January 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML24019A0742024-01-19019 January 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24008A2492023-12-18018 December 2023 Texas SHPO Response for Comanche Peak Deis Review and Comment ML23311A2202023-11-20020 November 2023 NRC to Fws, NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2023 ML23255A2882023-09-12012 September 2023 NRR E-mail Capture - Comanche Peak - Acceptance of Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML23256A1492023-09-11011 September 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 4 ML23226A0072023-08-11011 August 2023 NRR E-mail Capture - Comanche Peak 1 and 2 – Audit Plan - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23188A0442023-07-0707 July 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 3 ML23181A0722023-06-29029 June 2023 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23181A0202023-06-29029 June 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 2 ML23172A0152023-06-20020 June 2023 NRR E-mail Capture - Re Comanche Peak - Acceptance of License Amendment Request Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23167A0222023-06-14014 June 2023 Email: Request for Additional Information (RAI) Letter for the Review of the Comanche Peak Initial License Renewal Application, Set 1 ML23145A2332023-05-25025 May 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Confirmation of Information - Set 2 ML23143A1382023-05-23023 May 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Confirmation of Information - Set 1 ML23139A0802023-05-18018 May 2023 NRR E-mail Capture - Comanche Peak – Draft Supplemental Information Request - License Amendment Request Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23138A1522023-05-18018 May 2023 Lr Docs - (External_Sender) Comanche Peak Nuclear Power Plants ML23135A9132023-05-15015 May 2023 NRR E-mail Capture - Comanche Peak - Draft Supplemental Information Request - License Amendment Request to 10 CFR 50.69 ML23131A2932023-05-11011 May 2023 Lr Docs - License Renewal for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23110A7122023-04-20020 April 2023 NRR E-mail Capture - Comanche Peak - Verbal Authorization of Proposed Alternative RV-1 (L-2023-LLR-0019) ML23103A4682023-04-11011 April 2023 NRR E-mail Capture - Comanche Peak – Request for Additional Information - License Amendment Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23086B9852023-03-27027 March 2023 NRR E-mail Capture - Comanche Peak – Draft Request for Additional Information - Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23061A1612023-03-0202 March 2023 E-mail from David Griggs Regarding Submission to NRC Electronic Information Exchange on 03/01/2023 for Citizens for Fair Utility Regulation in Comanche Peak Proceeding ML23032A3842023-02-0101 February 2023 LRA On-Site Audit Needs List ML23214A0192023-01-30030 January 2023 (External_Sender) Request to Broaden Extended Deadline to the General Public (with Attachments) - C3 ML23214A0202023-01-29029 January 2023 (External_Sender) Requesting a Deadline Extension on NRC-2002-0183, Comanche Peak License Renewal - C2 ML23214A0182023-01-26026 January 2023 (External Sender) NRC-2022-0183-0003 (with Attachment) - C6 ML23214A0162023-01-24024 January 2023 (External Sender) EPA Scoping Comment Letter for the Comanche Peak Nuclear Power Plant License Renewal (with Attachment) - C8 ML23214A0142023-01-23023 January 2023 (External Sender) Docket NRC-2022-0183 Comanche Peak Nuclear Power Plant Renewal (with Attachment) - C1 ML23214A0172023-01-17017 January 2023 (External Sender) NRC License Extension? No! ML23214A0132023-01-17017 January 2023 (External Sender) Docket Id NRC-2022-0183, Request for Extension of License for Comanche Peak, Comment for Environmental Scoping - C9 ML23214A0122023-01-13013 January 2023 (External Sender) Correction to Comment Submitted 01-13-23 - C11 ML22362A0992022-12-28028 December 2022 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Apply Westinghouse Fsloca Evaluation Model ML22362A0972022-12-28028 December 2022 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Adopt WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications, ML22325A2742022-11-21021 November 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22318A3102022-11-10010 November 2022 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22237A2842022-08-25025 August 2022 CPNPP 2022 EP Program Inspection RFI Hjs 08252022 ML22229A0792022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22230B1092022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22220A1942022-08-0808 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Draft Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22133A0472022-05-13013 May 2022 July 2022 Emergency Preparedness Exercise Inspection - Request for Information 2024-09-18
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24204A0022024-07-18018 July 2024 NRR E-mail Capture - Request for Additional Information Comanche Peak Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24052A0122024-02-16016 February 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ML24036A0122024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24033A2642024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Revised Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24019A0742024-01-19019 January 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24018A1072024-01-18018 January 2024 – Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23256A1492023-09-11011 September 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 4 ML23256A1502023-09-11011 September 2023 Request for Additional Information Requests - Comanche Peak - Set 4 ML23213A2162023-08-0202 August 2023 Vistra Operations Company, LLC Notification of License Renewal Inspection and Request for Information ML23188A0452023-07-0707 July 2023 Request for Additional Information Requests - Comanche Peak - Set 3 ML23188A0442023-07-0707 July 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 3 ML23181A0212023-06-29029 June 2023 Request for Additional Information Requests - Comanche Peak - Set 2 ML23181A0202023-06-29029 June 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 2 ML23167A0232023-06-14014 June 2023 Request for Additional Information (RAI) for the Review of the Comanche Peak Initial License Renewal Application (Lra), Set 1 ML23167A0222023-06-14014 June 2023 Email: Request for Additional Information (RAI) Letter for the Review of the Comanche Peak Initial License Renewal Application, Set 1 ML23145A2322023-05-25025 May 2023 LRA - Request for Confirmation of Information - Set 2 ML23132A2542023-05-23023 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization & Treatment of Structures,Systems & Components for Nuclear Power Reactors EPID L-2023-LLA-0057 ML23143A1372023-05-23023 May 2023 LRA - Request for Confirmation of Information - Set 1 ML23068A0562023-05-0909 May 2023 Request for Additional Information - Comanche Peak License Renewal Application Environmental Review ML23068A0732023-04-13013 April 2023 Requests for Confirmation of Information for the Environmental Review of the Comanche Peak Nuclear Power Plant, Units 1 and 2, Licensed Renewal Application (EPID Number: L-2022-LNE-0004) (Docket Numbers 50-445 and 50-446) ML23103A4682023-04-11011 April 2023 NRR E-mail Capture - Comanche Peak – Request for Additional Information - License Amendment Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23086B9852023-03-27027 March 2023 NRR E-mail Capture - Comanche Peak – Draft Request for Additional Information - Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23010A1442023-01-0909 January 2023 Inservice Inspection Request for Information ML22325A2742022-11-21021 November 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22318A3102022-11-10010 November 2022 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22230B1092022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22220A1942022-08-0808 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Draft Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing IR 05000445/20224012022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22083A0262022-03-23023 March 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF 505 Revision 2 ML21286A7912021-10-13013 October 2021 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF-577 Revision 1 ML21253A2242021-09-0909 September 2021 Request for Information Occupational Radiation Safety Inspection (71124.01, 71124.02, and 71151) from 10/18-22/2021 ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 ML21166A3382021-06-22022 June 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML21165A1022021-06-13013 June 2021 Pi&R; Request for Information ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML20225A0932020-08-12012 August 2020 Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information ML20105A1072020-04-13013 April 2020 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Exigent Amendment Request for One Time Change to Unit 2 Steam Generator Inspection Frequency ML20104A0022020-04-11011 April 2020 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - Proposed Alternative to ASME OM Code for Deferral of Snubber Testing (SNB-1) and Visual Examinations (SNB-2) ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 ML19346B3812019-12-11011 December 2019 NRR E-mail Capture - Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment ML19319A5432019-11-14014 November 2019 NRR E-mail Capture - Draft Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment ML19058A3592019-02-27027 February 2019 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Final Request for Additional Information Concerning License Amendment Request to Revise the Emergency Plan IR 05000445/20170072018-02-0808 February 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000445/2017007 and 05000446/2017007) ML17276B8622017-10-0303 October 2017 Notification of NRC Design Bases Assurance Inspection (Programs)(05000445/2017007 and 05000446/2017007) and Initial Request for Information ML17087A2032017-03-28028 March 2017 NRR E-mail Capture - Comanche Peak, Unit 2 - Final Request for Additional Information Regarding Request No. 2B3-1 ML17066A2372017-03-0707 March 2017 Notification of NRC Triennial Fire Protection Baseline Inspection (05000445/2017008 and 05000446/2017008) and Request for Information ML17048A4172017-02-17017 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment... ML16034A1962016-02-0808 February 2016 Independent Spent Fuel Storage Installation - Request for Additional Information, Application for Order Approving Transfer of Facility Operating Licenses and Conforming Amendment 2024-07-18
[Table view] |
Text
Lent. Susan From: Singal, Balwant Sent: Thursday, April 18, 2013 10:32 AM To: Hope, Timothy Cc: Ervin-Walker, Tamera
Subject:
Request for Additional Information
-license amendment Request (LAR)12-007 (TACs MF0405 and MF0406) Attachments:
MF0405-RAl.docx Tim, By letter dated December 19, 2012, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13023A237), Luminant Generation Company LLC, (Luminant) submitted license amendment request (LAR)12-007 for the U.S. Nuclear Regulatory Commission (NRC) review and approval.
The licensee requested approval for revision to Technical Specification (TS) 3.8.1, "AC Sources -Operating" for two 14-day completion times for the offsite sources for Comanche Peak Nuclear Power Plant (CPNPP), Unit 1 and 2. Based on the initial review of your application, the NRC staff has the attached request for additional information (RAI) for completing its review. Draft RAI were transmitted on April 12, 2013 and clarification call was held on April 18, 2013. Please treat this e-mail asformaltransmittalofRAI.Ms. Tamera J. Ervin-Walker of Luminant agreed to provide the response within 30 days from the date of this e-mail. Please let me know if you have any questions.
Thanks. Balwant K. Singal Senior Project Manager (Comanche Peak and STP) Nuclear Regulatory Commission Division of Operating Reactor Licensing BalwantSingal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1
-2 Draft Request for Additional Regarding Two, 14-Day, One-Time, Completion Times for Offsite Luminant Generation Company, Comanche Peak Nuclear Power Plant, Units 1 and (TAC Nos. MF0405 and The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the Luminant Generation Company LLC License Amendment Request (LAR) dated December 19, 2012 (Agencywide Documents Access ad management System (ADAMS) Accession No. ML 13023A237).
Based on its review of the LAR, the staff requests the following additional information:
Request for Additional Information (RAI): RAI-1: In the LAR Attachment 1, Section 2.0, Page 3, the following is stated: The proposed changes in Chapters 8 and 9 of the Final Safety Analysis Report (FSAR) (Reference 8.1) (Attachment
- 6) reflect ST [startup transformer]
XST1 , new alternate ST XST1A, new 138 kV [kilo volt] tower disconnect switches, firewall, and the installation of new cable buses and transfer panels. The FSAR Table and Figures not shown in the Attachment, but which will also be updated, are Table 8.3-3 and Figures 1.2-1, 8.2-1, 8.2-4, 8.2-7, 8.2-9, and 8.2-11. Please provide the following documents: Markup/update of the FSAR Figures 1.2-1, 8.2-1, 8.2-4, 8.2-7. 8.2-9, 8.2-11, and 8.3-1 (Drawing No. E1-0001) (or a relevant portion of the figures/drawings) showing the modifications. Markup of the FSAR Table 8.3-3. RAI-2: In the LAR Attachment 1, Section 4.1, Page 15, the licensee stated that the plant procedure SOP-614A1B "Alternative Power Generator Operations" requires the Alternate Power Diesel Generator (APDG) fuel be replenished every two hours. Please describe how the APDG fuel will be replenished every two hours, if needed, throughout any of two 14-day Completion Times (CTs).
-3 RAI-3: Please provide the following drawings related to the APDG sets: Drawing(s) showing layout of major enclosures/components of the APDG sets, and describe the cable routing from the APDG sets to the plant Class 1 E 6.9 kV buses. A single line diagram showing connections of the APDG sets to the plant 6.9 kV Class 1E buses. RAI-4: Please describe whether any dedicated operator will be assigned to ensure proper operation of the APDGs, during the proposed two 14-day CTs. RAI-5 In the LAR Attachment 1, Section 4.1, Page 15, the licensee stated that each APDG set consist of three diesel generators operating in parallel at 480 volts (V), 3 phase and 60 hertz (Hz). Each APDG is rated at 1140 kilowatts (kW) with output connected in parallel for a total capacity of 3420 kW and is connected to the Class 1 E 6.9 kVous through a 480 V/6.9 kV transformer.
The loading of APDG set will be limited by the transformer capacity of 3450 kVA. The total of the unit-specific loads required to be fed from APDGs as shown in Page 16, Table 4, is 3010.29 kW. Please provide total unit-specific load in kVA [kilovolt-ampere] (considering power factor of loads) to verify that the loading will remain within the connected transformer rating of 3450 kVA. Also, please provide a discussion if any common load may be necessary to be powered from the unit APDG set for safe shutdown and long term cooling of the unit. RAI-6 Please describe whether each APDG set conSisting of 3 DGs, each rated 1140 kW, will be provided with load sharing mechanism so that the kW and kVAR [kilovolt-ampere-reactive]
loading is shared equally among the 3 DGs. RAI-7 In the LAR Attachment 1, Section 4.1, Page 27, the licensee stated: CPNPP's [Comanche Peak Nuclear Power Plant's] Operations Department will contact the Transmission Operator (Transmission Grid Controller) once per day during a 14-day Completion Time to ensure no problems exist in the transmission lines feeding CPNPP or their associated switchyards that would cause post trip switchyard voltages to exceed the voltages required by ST A-629.
-Please provide relevant portion of the STA-629 document which provides the required post trip switchyard voltages.
RAI-8 In the LAR Attachment 1, Section 4.2, Page 30, the licensee stated In the two weeks prior to the start of the CT, a thermographic survey will be conducted on the two fixed sources in the safeguards switchgear room to verify no abnormalities exist. This is to reduce the likelihood of a fire ignition.
Please provide a description of two fixed sources in the safeguards switchgear room. RAI-9 Please describe the precautions which will be taken to prevent any fire-hazards due to any diesel fuel oil leakage/spillage associated with the APDG sets.