ML24262A130

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review Comanche Peak Multiple Relief Requests for Unit 2 Third Inservice Inspection Interval Due to Impracticality (EPID L-2024-LLR-0053 Through -0058)
ML24262A130
Person / Time
Site: Comanche Peak 
Issue date: 09/18/2024
From: Samson Lee
NRC/NRR/DORL/LPL4
To: Boehmisch N
Vistra Operations Company
References
L-2024-LLR-0053, L-2024-LLR-0054, L-2024-LLR-0055, L-2024-LLR-0056, L-2024-LLR-0057, L-2024-LLR-0058
Download: ML24262A130 (3)


Text

From:

Samson Lee Sent:

Wednesday, September 18, 2024 11:24 AM To:

Boehmisch, Nicholas

Subject:

Acceptance Review: Comanche Peak multiple relief requests for Unit 2 third inservice inspection interval due to impracticality (EPID: L-2024-LLR-0053 through -0058)

By letter dated August 13, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24226A120), Vistra Operations Company LLC (the licensee) submitted multiple relief requests for Comanche Peak Nuclear Power Plant, Unit 2, third ten-year inservice inspection interval from Title 10 of the Code of Federal Regulations (10 CFR) 50.55(a) inspection requirements due to impracticality. The August 13, 2024, letter replaced a licensee letter dated August 5, 2024 (ML24218A217) for these multiple relief requests. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the licensees application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, the licensee will be advised by separate correspondence.

Based on the information provided in the licensees relief requests B-1, B-2, B-3, B-4, C-1, and C-2, the NRC staff has estimated that these relief requests will take approximately 160, 120, 120, 160, 160, and 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />, respectively, to complete. The NRC staff expects to complete this review by September 18, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Samson Lee Comanche Peak Project Manager Plant Licensing Branch 4

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168 Docket No. 50-446

Hearing Identifier:

NRR_DRMA Email Number:

2607 Mail Envelope Properties (SA1PR09MB86539015687F81F0DB2E6A739A622)

Subject:

Acceptance Review Comanche Peak multiple relief requests for Unit 2 third inservice inspection interval due to impracticality (EPID L-2024-LLR-0053 through -0058)

Sent Date:

9/18/2024 11:23:54 AM Received Date:

9/18/2024 11:23:00 AM From:

Samson Lee Created By:

Samson.Lee@nrc.gov Recipients:

"Boehmisch, Nicholas" <Nicholas.Boehmisch@luminant.com>

Tracking Status: None Post Office:

SA1PR09MB8653.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3221 9/18/2024 11:23:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: