CP-201400140, Correction to Figures Provided in Response to Request for Additional Information for LAR 12-007 Regarding Two, 14-Day, One-Time, Completion Times for Offsite Circuits.

From kanterella
Jump to navigation Jump to search

Correction to Figures Provided in Response to Request for Additional Information for LAR 12-007 Regarding Two, 14-Day, One-Time, Completion Times for Offsite Circuits.
ML14057A804
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/13/2014
From: Flores R, Madden F
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14066A223 List:
References
CP-201400140, TAC MF0405, TAC MF0406, TXX-14019
Download: ML14057A804 (2)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.flores@luminant.com Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201400140 REF: 10 CFR 50.90 Log # TXX-14019 February 13, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

UNITS 1 AND 2, DOCKET NUMBERS 50-445 AND 50-446 "CORRECTION TO FIGURES PROVIDED IN RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR LAR 12-007 REGARDING TWO, 14-DAY, ONE-TIME, COMPLETION TIMES FOR OFFSITE CIRCUITS."

(TAC NOS. MF0405 AND MF0406)

REFERENCES:

1. Luminant Power Letter, Logged TXX-12198, from Rafael Flores to the NRC Titled "License Amendment Request (LAR)12-007, Revision to Technical Specifications 3.8.1, 'AC Sources - Operating,' for Two, 14-Day Completion Times for Offsite Circuits" Dated December 19, 2012. (ADAMS Accession No. ML13023A237)
2. Luminant Power Letter, Logged TXX- 13082, from Rafael Flores to the NRC titled "Response to Request for Additional Information for License Amendment Request (LAR)12-007, Revision to Technical Specifications 3.8.1, 'AC Sources -

Operating,' for Two, 14-Day Completion Times for Offsite Circuits" Dated May 16, 2013. (ADAMS Accession No. ML13149A257)

3. NRC Letter from Balwant K. Singal, NRC, to Rafael Flores, Luminant Power, "Comanche Peak Nuclear Power Plant, Units 1 and 2 - Issuance of Amendments Re: Revision to Technical Specification 3.8.1, 'AC Sources - Operating,' for Two 14-Day Completion Times for Offsite Circuits" dated September 18, 2013.

(ADAMS Accession No. ML13232A143)

Dear Sir or Madam:

Reference 1 was Comanche Peak Nuclear Power Plant (CPNPP) License Amendment Request (LAR)12-007 for two, one-time, 14-day Technical Specification (TS) Completion Times (CTs) to complete a plant modification by March 31, 2014. Reference 2 was a request from the Nuclear Regulatory Commission (NRC) for additional information needed to review LAR 12-007.

Reference 3 was the NRC's approval of LAR 12-007 and provided the Safety Evaluation for Amendment 160 to the Units 1 and 2 Facility Operating License Nos. NPF-87 and NPF-89, respectively.

A member of the STARS Alliance Callaway

  • Comanche Peak ' Diablo Canyon
  • Palo Verde
  • Wolf Creek

[At~e~.

TXX-14019 Page 2 of 2 02/13/2014 Luminant Power discovered inconsistencies with some of the figures provided in Reference 2. As a result of conmmunications between Luminant Power and the NRC Staff Project Manager it was agreed that updated figures would be provided. Updated figures are provided in . Luminant Power has reviewed these inconsistencies and determined that there is no material change to the no significant hazards consideration provided by Reference 1 or to the conclusions of the NRC Safety Evaluation Report (Reference 3).

This issue has been entered into the corrective action program (CR-2014-000182) and the FSAR will be updated in accordance with 10CFR50.71(e).

If you have any questions regarding this report, please contact Tamera J. Ervin-Walker at 254-897-6902 or tamera.ervin@luminant.com.

This letter contains no new regulatory commitments.

I state under penalty of perjury that the foregoing is true and correct.

Executed on February 13, 2014.

Sincerely, Luminant Generation Company LLC Rafael Flores By: *j~

iFred W. EMafdden Director, External Affairs TJEW : "Correction to Figures Provided in Response to Request for Additional Information for LAR 12-007 Regarding Two, 14-Day, One-Time, Completion Times for Offsite Circuits."

c Michele G. Evans, Director, Division of Operating Reactor Licensing, Office of NRR Marc Dapas, Region IV Wayne Walker, Region IV Balwant K. Singal, NRR Resident Inspectors, Comanche Peak