| #REDIRECT [[IR 05000325/2003005]] | | {{Adams |
| | | number = ML040220816 |
| | | issue date = 01/16/2004 |
| | | title = IR 05000324-03-005, & IR 05000325-03-005, on 08/26/2003, for Brunswick Steam Electric Plant, Physical Security Baseline Inspection |
| | | author name = Kuzo G |
| | | author affiliation = NRC/RGN-II/DRS |
| | | addressee name = Gannon C |
| | | addressee affiliation = Carolina Power & Light Co |
| | | docket = 05000324, 05000325 |
| | | license number = DPR-062, DPR-071, NPF-037, NPF-066 |
| | | contact person = |
| | | document report number = IR-03-005 |
| | | document type = Inspection Report, Letter |
| | | page count = 5 |
| | }} |
| | |
| | {{IR-Nav| site = 05000324 | year = 2003 | report number = 005 }} |
| | |
| | =Text= |
| | {{#Wiki_filter:ary 16, 2004 |
| | |
| | ==SUBJECT:== |
| | BRUNSWICK STEAM ELECTRIC PLANT - NRC INTEGRATED INSPECTION REPORT ADDENDUM 05000324/20030005 and 05000325/20030005: |
| | PHYSICAL SECURITY BASELINE INSPECTION |
| | |
| | ==Dear Mr. Gannon:== |
| | On August 26, 2003, the NRC completed a physical security baseline inspection at your Brunswick Units 1 and 2 facilities. The enclosed report addendum documents the inspection details which were discussed on August 26, 2003, with Mr. E. ONeil and other members of your staff. |
| | |
| | The inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions regulations, orders, and the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
| | |
| | The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the NRC Public Document Room. The enclosed report is being submitted as an addendum to NRC Integrated Inspection Reports 05000324/20030005 and 05000325/20030005, issued on October 16, 2003, and entered into the NRC document system (ADAMS) under accession number ML032900004. |
| | |
| | In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without the enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. |
| | |
| | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | CP&L 2 Should you have any questions concerning this letter, please contact us. |
| | |
| | Sincerely, |
| | /RA/ |
| | George B. Kuzo, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Enclosure: Brunswick Steam Electric Plant - NRC Integrated Inspection Report Addendum 05000324/20030005 and 05000325/20030005 w/Attachment: Supplemental Information ( ) |
| | cc w/encl ( ): |
| | W. C. Noll, Director Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 cc w/o encl: |
| | David H. Hinds Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 James W. Holt, Manager Performance Evaluation and Regulatory Affairs PEB 7 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551 Edward T. ONeil, Manager Support Services Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 (cc w/o encl contd - See page 3) |
| | |
| | CP&L 3 (cc w/o encl contd) |
| | Lenny Beller, Supervisor Licensing/Regulatory Programs Carolina Power and Light Company P. O. Box 10429 Southport, NC 28461 William D. Johnson Vice President & Corporate Secretary Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602-1551 John H. O'Neill, Jr. |
| | |
| | Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Peggy Force Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 (cc w/o encl contd - See page 4) |
| | |
| | CP&L 4 (cc w/o encl contd) |
| | Donald E. Warren Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Warren Lee Emergency Management Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402 Distribution w/encl ( ): |
| | B. Westreich, NSIR (hard copy w/encl) |
| | E. McNiel, NSIR (hard copy w/encl) |
| | Distribution w/o encl: |
| | B. Mozafari, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE ENNIS SHEHEE FREDRICKSON NAME RA RA RA DATE 1/15/2004 1/15/2004 1/15/2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040220816.WPD |
| | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000324/20240032024-11-13013 November 2024 Integrated Inspection Report 05000324/2024003 and 05000325/2024003 IR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 IR 05000324/20224032022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 IR 05000324/20220102022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 IR 05000324/20210032021-11-10010 November 2021 Team Electric Plant; Integrated Inspection Report 05000324/2021003 and 05000325/2021003 IR 05000324/20210102021-10-22022 October 2021 Temporary Instruction 2515/193 Inspection Report 05000324/2021010 and 05000325/2021010 IR 05000324/20214012021-09-28028 September 2021 Security Baseline Inspection Report 05000324/2021401 and 05000325/2021401 IR 05000324/20210052021-08-26026 August 2021 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2021005 and 05000325/2021005) IR 05000324/20210122021-08-24024 August 2021 Biennial Probleem Identification and Resolution Inspection Report 05000324/2021012 and 05000325/2021012 IR 05000324/20210022021-08-11011 August 2021 Integrated Inspected Report 05000324/2021002 and 05000325/2021002 IR 05000324/20214022021-06-16016 June 2021 Material Control and Accounting Program Inspection Report 05000324/2021402 and 05000325/2021402 (OUO Removed) IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 IR 05000324/20210112021-06-0202 June 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000324/2021011 and 05000325/2021011 IR 05000324/20210012021-05-14014 May 2021 Integrated Inspection Report 05000324/2021001 and 05000325/2021001 IR 05000324/20200062021-03-0303 March 2021 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2020006 and 05000324/2020006 IR 05000324/20200042021-02-0505 February 2021 Integrated Inspection Report 05000324/2020004 and 05000325/2020004; 07200006/2020002 IR 05000324/20203012021-01-22022 January 2021 NRC Operator License Examination Report 05000325/2020301 and 05000324/2020301 IR 05000324/20200032020-11-0606 November 2020 Integrated Inspection Report 05000324/2020003 and 05000325/2020003 IR 05000324/20204012020-10-30030 October 2020 Security Baseline Inspection Report 05000324/2020401 and 05000325/2020401 2024-09-10
[Table view] Category:Letter
MONTHYEARIR 05000324/20240032024-11-13013 November 2024 Integrated Inspection Report 05000324/2024003 and 05000325/2024003 IR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24218A0862024-09-0909 September 2024 NRC to NMFS, Designation of Duke Energy Progress LLC as the Non-Federal Representative for Brunswick Steam Electric Plant, Units 1 and 2 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24242A0322024-08-29029 August 2024 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, 10 CFR 54.37 Update, Technical Requirements Manuals, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Change IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 2024-09-09
[Table view] |
Text
ary 16, 2004
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NRC INTEGRATED INSPECTION REPORT ADDENDUM 05000324/20030005 and 05000325/20030005:
PHYSICAL SECURITY BASELINE INSPECTION
Dear Mr. Gannon:
On August 26, 2003, the NRC completed a physical security baseline inspection at your Brunswick Units 1 and 2 facilities. The enclosed report addendum documents the inspection details which were discussed on August 26, 2003, with Mr. E. ONeil and other members of your staff.
The inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions regulations, orders, and the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the NRC Public Document Room. The enclosed report is being submitted as an addendum to NRC Integrated Inspection Reports 05000324/20030005 and 05000325/20030005, issued on October 16, 2003, and entered into the NRC document system (ADAMS) under accession number ML032900004.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without the enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of ADAMS.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
CP&L 2 Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
George B. Kuzo, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Enclosure: Brunswick Steam Electric Plant - NRC Integrated Inspection Report Addendum 05000324/20030005 and 05000325/20030005 w/Attachment: Supplemental Information ( )
cc w/encl ( ):
W. C. Noll, Director Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 cc w/o encl:
David H. Hinds Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 James W. Holt, Manager Performance Evaluation and Regulatory Affairs PEB 7 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551 Edward T. ONeil, Manager Support Services Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 (cc w/o encl contd - See page 3)
CP&L 3 (cc w/o encl contd)
Lenny Beller, Supervisor Licensing/Regulatory Programs Carolina Power and Light Company P. O. Box 10429 Southport, NC 28461 William D. Johnson Vice President & Corporate Secretary Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602-1551 John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Peggy Force Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 (cc w/o encl contd - See page 4)
CP&L 4 (cc w/o encl contd)
Donald E. Warren Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Warren Lee Emergency Management Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402 Distribution w/encl ( ):
B. Westreich, NSIR (hard copy w/encl)
E. McNiel, NSIR (hard copy w/encl)
Distribution w/o encl:
B. Mozafari, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE ENNIS SHEHEE FREDRICKSON NAME RA RA RA DATE 1/15/2004 1/15/2004 1/15/2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040220816.WPD