ML11286A033: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11286A033
| number = ML11286A033
| issue date = 10/03/2011
| issue date = 10/03/2011
| title = 2011/10/03 Watts Bar 2 OL - NRC PM Open Items List 10-4-11.docx
| title = OL - NRC PM Open Items List 10-4-11.docx
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent: Monday, October 03, 2011 9:40 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Boyd, Desiree L
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, October 03, 2011 9:40 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L


==Subject:==
==Subject:==
NRC PM Open Items List 10-4-11.docx Attachments:
NRC PM Open Items List 10-4-11.docx Attachments:
NRC PM Open Items List 10-4-11.docx For next phone call.  
NRC PM Open Items List 10-4-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764


Thank You,    ~*~*~*~*~*~*~*~*~*~*~*~
Hearing Identifier:
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services
Watts_Bar_2_Operating_LA_Public Email Number:
 
533 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF23B39AC1)  
dlboyd@tva.gov 423-365-8764
 
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 533   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF23B39AC1)


==Subject:==
==Subject:==
NRC PM Open Items List 10-4-11.docx Sent Date:   10/3/2011 9:40:26 AM Received Date: 10/3/2011 9:40:30 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
NRC PM Open Items List 10-4-11.docx Sent Date:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
10/3/2011 9:40:26 AM Received Date:
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
10/3/2011 9:40:30 AM From:
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Boyd, Desiree L Created By:
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov
dlboyd@tva.gov Recipients:  
 
"Arent, Gordon" <garent@tva.gov>
Files     Size     Date & Time MESSAGE   264     10/3/2011 9:40:30 AM NRC PM Open Items List 10-4-11.docx   33217 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Page 1 of 4    NRC PM Open Items List 10/4/11 (423) 751-7777 ID 4233652004#
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Nov. 2011 Procedures complete 9/30/11 Pre-inspection TBD
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
 
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Inspection
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 264 10/3/2011 9:40:30 AM NRC PM Open Items List 10-4-11.docx 33217 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October  
Page 1 of 4 NRC PM Open Items List 10/4/11 (423) 751-7777 ID 4233652004#
No.
Description Status Additional Comments Resp Org/Person
: 1.
Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Nov. 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).
Heinrich/Snyder (Bryan)


5 th - closed portion).
Page 2 of 4 No.
Heinrich/Snyder (Bryan)
Description Status Additional Comments Resp Org/Person
Page 2 of 4     No. Description Status Additional Comments Resp Org/Person 2. Instrumentation RAI List (Knuettel)  
: 2.
Instrumentation RAI List (Knuettel)
: 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
: 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Draft scheduled for 9/9 is now TBD.  
Draft scheduled for 9/9 is now TBD.
: 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
: 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
: 3. Revise GA-ESI procedure for CGI dedication to address NRC comments.  
: 3. Revise GA-ESI procedure for CGI dedication to address NRC comments.
: 4. Draft received for review 9/20/11.  
: 4. Draft received for review 9/20/11.
: 5. Non-props & affidavits  
: 5. Non-props & affidavits
: 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 7. WEC to revise figure to remove connection from OM to printer to complete commitment.  
: 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
: 7. WEC to revise figure to remove connection from OM to printer to complete commitment.
: 8. WEC to agreed to produce a test report for the incore IITA.
: 8. WEC to agreed to produce a test report for the incore IITA.
: 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
: 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
: 10. Submit I&C update letter
: 10. Submit I&C update letter
: 1. 9/29/11 2. Various - see status
: 1. 9/29/11
: 3. 9/26/11A 4. 10/4/11 5. 11/18/11 6. Various - see status  
: 2. Various -
: 7. 10/24/11 8. TBD 9. 10/10/11 10. 10/14/11 1. Draft response received and comments sent to GA.  
see status
: 2. 04038903-1SP: 9/30/11 04038903-2SP: 10/6/11 04038903-4SP: 10/21/11 04038903-QSR: 9/30/11 Non-props and affidavits due 11/18/11  
: 3. 9/26/11A
: 3. OP-7.3-240: Complete  
: 4. 10/4/11
: 5. 11/18/11
: 6. Various -
see status
: 7. 10/24/11
: 8. TBD
: 9. 10/10/11
: 10. 10/14/11
: 1. Draft response received and comments sent to GA.
: 2. 04038903-1SP: 9/30/11 04038903-2SP: 10/6/11 04038903-4SP: 10/21/11 04038903-QSR: 9/30/11 Non-props and affidavits due 11/18/11
: 3. OP-7.3-240: Complete
: 4. Create new bridge document 04038800-1SP:
: 4. Create new bridge document 04038800-1SP:
10/4/11 5. Provide NRC non-prop and affidavit for all remaining documents  
10/4/11
: 5. Provide NRC non-prop and affidavit for all remaining documents
: 6. WEC to provide the following documents:
: 6. WEC to provide the following documents:
CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/30/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: 10/26/11 WNA-PT-00138-WBT: Complete
CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/30/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: 10/26/11 WNA-PT-00138-WBT: Complete
: 7. WNA-AR-00189-WBT:10/24/11  
: 7. WNA-AR-00189-WBT:10/24/11
: 8. IITA In-core EQ report  
: 8. IITA In-core EQ report
: 9. MI cable 600V test report Produce non-prop summary document  
: 9. MI cable 600V test report Produce non-prop summary document
: 10. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables?
: 10. Next I&C submittal update Eng/Hilmes (Smith)
10/31/11 Determine if exemption required. Check SSER 24. NRC may need to establish a license condition.
: 3.
Hilmes (Stockton)
Exemption to 10CFR50.49 for some Category II cables?
Page 3 of 4     No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer)
10/31/11 Determine if exemption required. Check SSER 24.
Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection - June 2012 Phase I commitments 10/7/11 Additional clarification to Phase I actions will be needed. Fleet wide issue. Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 10/24-28/11 2.9/30/11A 3.9/30/11A 4. 11/4/11 5. 11/30/11  
NRC may need to establish a license condition.
: 6. 9/30/11A  
Hilmes (Stockton)  
: 7. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs - if needed  
 
: 4. Response to Group 8 5. Submit As-designed U1/U2 FPR 6. Fire Protection Program Audit Frequency - add to group 7 response  
Page 3 of 4 No.
: 7. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments  
Description Status Additional Comments Resp Org/Person
: 1. 10/14/11  
: 4.
: 2. 10/14/11  
Complete Implementation (Hemmer)
: 3. 10/21/11  
Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection -
June 2012 Phase I commitments 10/7/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.
Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
: 5.
Fire Protection Report Questions regarding OMA
: 1. 10/24-28/11 2.9/30/11A 3.9/30/11A
: 4. 11/4/11
: 5. 11/30/11
: 6. 9/30/11A
: 7. TBD
: 1. Audit
: 2. Group 7 RAI response
: 3. Receive Group 8 RAIs - if needed
: 4. Response to Group 8
: 5. Submit As-designed U1/U2 FPR
: 6. Fire Protection Program Audit Frequency - add to group 7 response
: 7. Follow-up meeting ENG/Hilmes (Arent)
: 6.
Tech Spec Revisions from latest T/S markup and NRC Review comments
: 1. 10/14/11
: 2. 10/14/11
: 3. 10/21/11
: 4. 10/21/11
: 4. 10/21/11
: 1. CSST A & B - discretionary  
: 1. CSST A & B - discretionary
: 2. I-131 DEI  
: 2. I-131 DEI
: 3. Diesel Generator Frequency  
: 3. Diesel Generator Frequency
: 4. Unit 1 AST FHA Licensing/Elton (Bryan) 7. ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon 8. SSER 22/23/24 Open Items Response 10/31/11 10/31 is the target date for the next SSER update. The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 10/7/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 10/31/11 Current target date for A107 is 10/31/11. Lic/Stockton Page 4 of 4     No. Description Status Additional Comments Resp Org/Person 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/1/112. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification 1. 10/18/11  
: 4. Unit 1 AST FHA Licensing/Elton (Bryan)
: 2. Feb 2012 1. 3 SSDs remaining to be issued. Possible submittal if any number changes.  
: 7.
: 2. TS certification Eng/Hilmes (Bryan) 13. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing 15. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon
Licensing (Gordon) 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR 18. ASME Section III N-3 reports 8/2012   19. Provide list of community leaders for NRC to send request for environmental reviews 9/26/11A Get list from public affairs Gordon 0. Discretionary Actions
: 8.
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Arent) Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.
SSER 22/23/24 Open Items Response 10/31/11 10/31 is the target date for the next SSER update.
Corp SG/ Webber ISI/Tinley}}
The expanded HH list and status is covered periodically.
Licensing
: 9.
Transient Analysis issues Boron dilution RAI response 10/7/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
: 10.
FSAR A107 10/31/11 Current target date for A107 is 10/31/11.
Lic/Stockton  
 
Page 4 of 4 No.
Description Status Additional Comments Resp Org/Person
: 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
: 1. 11/1/11
: 2. TBD
: 3. TBD
: 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
: 2. NRR to review current exemptions
: 3. Verify required notifications made NRR/TVA (Bryan)
: 12.
Verify Tech Spec Setpoints match calcs TS certification
: 1. 10/18/11
: 2. Feb 2012
: 1. 3 SSDs remaining to be issued. Possible submittal if any number changes.
: 2. TS certification Eng/Hilmes (Bryan)
: 13.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
: 14.
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
: 15.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
: 16.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
: 17.
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.
NRR
: 18.
ASME Section III N-3 reports 8/2012
: 19.
Provide list of community leaders for NRC to send request for environmental reviews 9/26/11A Get list from public affairs Gordon
: 0.
Discretionary Actions
: 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)
: 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
: 3.
Status of GSI 199 Eastern Seismicity (Arent)
Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR
: 4.
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.
Lic/Arent
: 5.
IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.
Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.
Corp SG/
Webber ISI/Tinley}}

Latest revision as of 01:38, 13 January 2025

OL - NRC PM Open Items List 10-4-11.docx
ML11286A033
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/03/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11286A033 (6)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Monday, October 03, 2011 9:40 AM To:

Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:

Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L

Subject:

NRC PM Open Items List 10-4-11.docx Attachments:

NRC PM Open Items List 10-4-11.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

533 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF23B39AC1)

Subject:

NRC PM Open Items List 10-4-11.docx Sent Date:

10/3/2011 9:40:26 AM Received Date:

10/3/2011 9:40:30 AM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 264 10/3/2011 9:40:30 AM NRC PM Open Items List 10-4-11.docx 33217 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Page 1 of 4 NRC PM Open Items List 10/4/11 (423) 751-7777 ID 4233652004#

No.

Description Status Additional Comments Resp Org/Person

1.

Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Nov. 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).

Heinrich/Snyder (Bryan)

Page 2 of 4 No.

Description Status Additional Comments Resp Org/Person

2.

Instrumentation RAI List (Knuettel)

1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.

Draft scheduled for 9/9 is now TBD.

2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
3. Revise GA-ESI procedure for CGI dedication to address NRC comments.
4. Draft received for review 9/20/11.
5. Non-props & affidavits
6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
7. WEC to revise figure to remove connection from OM to printer to complete commitment.
8. WEC to agreed to produce a test report for the incore IITA.
9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
10. Submit I&C update letter
1. 9/29/11
2. Various -

see status

3. 9/26/11A
4. 10/4/11
5. 11/18/11
6. Various -

see status

7. 10/24/11
8. TBD
9. 10/10/11
10. 10/14/11
1. Draft response received and comments sent to GA.
2. 04038903-1SP: 9/30/11 04038903-2SP: 10/6/11 04038903-4SP: 10/21/11 04038903-QSR: 9/30/11 Non-props and affidavits due 11/18/11
3. OP-7.3-240: Complete
4. Create new bridge document 04038800-1SP:

10/4/11

5. Provide NRC non-prop and affidavit for all remaining documents
6. WEC to provide the following documents:

CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/30/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: 10/26/11 WNA-PT-00138-WBT: Complete

7. WNA-AR-00189-WBT:10/24/11
8. IITA In-core EQ report
9. MI cable 600V test report Produce non-prop summary document
10. Next I&C submittal update Eng/Hilmes (Smith)
3.

Exemption to 10CFR50.49 for some Category II cables?

10/31/11 Determine if exemption required. Check SSER 24.

NRC may need to establish a license condition.

Hilmes (Stockton)

Page 3 of 4 No.

Description Status Additional Comments Resp Org/Person

4.

Complete Implementation (Hemmer)

Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection -

June 2012 Phase I commitments 10/7/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.

Substantial building to complete and equipment in May.

Provide document of mitigating equipment and location for unit 2.

Hemmer (Smith)

5.

Fire Protection Report Questions regarding OMA

1. 10/24-28/11 2.9/30/11A 3.9/30/11A
4. 11/4/11
5. 11/30/11
6. 9/30/11A
7. TBD
1. Audit
2. Group 7 RAI response
3. Receive Group 8 RAIs - if needed
4. Response to Group 8
5. Submit As-designed U1/U2 FPR
6. Fire Protection Program Audit Frequency - add to group 7 response
7. Follow-up meeting ENG/Hilmes (Arent)
6.

Tech Spec Revisions from latest T/S markup and NRC Review comments

1. 10/14/11
2. 10/14/11
3. 10/21/11
4. 10/21/11
1. CSST A & B - discretionary
2. I-131 DEI
3. Diesel Generator Frequency
4. Unit 1 AST FHA Licensing/Elton (Bryan)
7.

ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),

WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon

8.

SSER 22/23/24 Open Items Response 10/31/11 10/31 is the target date for the next SSER update.

The expanded HH list and status is covered periodically.

Licensing

9.

Transient Analysis issues Boron dilution RAI response 10/7/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.

ENG/Koontz WEC/Morgan

10.

FSAR A107 10/31/11 Current target date for A107 is 10/31/11.

Lic/Stockton

Page 4 of 4 No.

Description Status Additional Comments Resp Org/Person

11.

Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)

1. 11/1/11
2. TBD
3. TBD
1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
2. NRR to review current exemptions
3. Verify required notifications made NRR/TVA (Bryan)
12.

Verify Tech Spec Setpoints match calcs TS certification

1. 10/18/11
2. Feb 2012
1. 3 SSDs remaining to be issued. Possible submittal if any number changes.
2. TS certification Eng/Hilmes (Bryan)
13.

Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/

Woods (Bryan)

14.

Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing

15.

Submit final as-constructed FSAR figures 7/1/12 Licensing/

Stockton

16.

TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.

Licensing (Gordon)

17.

ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.

NRR

18.

ASME Section III N-3 reports 8/2012

19.

Provide list of community leaders for NRC to send request for environmental reviews 9/26/11A Get list from public affairs Gordon

0.

Discretionary Actions

1.

Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)

2.

Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing

3.

Status of GSI 199 Eastern Seismicity (Arent)

Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR

4.

Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.

Lic/Arent

5.

IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.

Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.

Corp SG/

Webber ISI/Tinley