| title = 08/31/2011 Summary of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Fire Protection Report and Open Items in the Safety Evaluation Report
| title = Summary of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Fire Protection Report and Open Items in the Safety Evaluation Report
| author name = Poole J C
| author name = Poole J
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000391
| docket = 05000391
| license number =  
| license number =  
| contact person = Poole J C
| contact person = Poole J
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 4
| page count = 4
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:RfGU{ ",v'" "';-, 01.' o?'! << 0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Iii cs. : ;;; "'., ****. &#xa5;00 March 27, 2012 Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2  
{{#Wiki_filter:~"I\ RfGU{                                     UNITED STATES
      ",v'"         "';-,
01.'                 o?'                 NUCLEAR REGULATORY COMMISSION
                            ~
0 WASHINGTON, D.C. 20555-0001 Iii                         :
cs.~                    ~
      "'.,           &#xa5;00
          ****.                                       March 27, 2012 LICENSEE:        Tennessee Valley Authority FACILITY:        Watts Bar Nuclear Power Plant, Unit 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF AUGUST 31, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2, FIRE PROTECTION REPORT AND OTHER OPEN ITEMS IN THE SAFETY EVALUATION REPORT On August 31,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF AUGUST 31, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2, FIRE PROTECTION REPORT AND OTHER OPEN ITEMS IN THE SAFETY EVALUATION REPORT On August 31,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss the review of Watts Bar Nuclear Plant Unit 2 Fire Protection Report and other open items in the Safety Evaluation Report, in support of TVA's application for an operating license. A list of attendees is enclosed.
The purpose of the meeting was to discuss the review of Watts Bar Nuclear Plant Unit 2 Fire Protection Report and other open items in the Safety Evaluation Report, in support of TVA's application for an operating license. A list of attendees is enclosed.
The first part of the meeting consisted of the NRC and TVA staff discussing draft requests for additional information (RAls) based on the content of the fire protection report under technical review. As a result of the meeting, the staff issued RAls that can be found in the Agencywide Documents Access and Management System at Accession Number ML 112490474.
The first part of the meeting consisted of the NRC and TVA staff discussing draft requests for additional information (RAls) based on the content of the fire protection report under technical review. As a result of the meeting, the staff issued RAls that can be found in the Agencywide Documents Access and Management System at Accession Number ML112490474.
For the last portion of the meeting, the NRC and TVA staff discussed the responses provided by TVA in a letter dated July 29,2011, on boron dilution.
For the last portion of the meeting, the NRC and TVA staff discussed the responses provided by TVA in a letter dated July 29,2011, on boron dilution. NRC staff stated that although TVA tried to justify boron dilution calculations for Modes 1, 2, and 6 were sufficient, the staff did not agree and could not complete its evaluation without having calculations for all modes. TVA stated it would work with Westinghouse to provide the missing information.
NRC staff stated that although TVA tried to justify boron dilution calculations for Modes 1, 2, and 6 were sufficient, the staff did not agree and could not complete its evaluation without having calculations for all modes. TVA stated it would work with Westinghouse to provide the missing information.
Members of the public did not participate in the meeting.
Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-391  
                                                            ~.
                                                            ~.-.--  Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
==Enclosure:==


list of Attendees cc w/encl: Distribution via Listserv Steve Campbell Patrick Milano Justin Poole Alex Klein Daniel Frumkin Charles Moulton Bernard Litkett Naeem Iqbal Michelle Kichline Steve Rose* Eric Patterson*
list of Attendees cc w/encl: Distribution via Listserv
Sam Miranda LIST OF AUGUST 31, 2011! PUBLIC MEETING TENNESSEE VALLEY SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT FIRE PROTECTION REPORT AND OPEN PositionlTitle Branch Chief Sr. Project Manager Sr. Project Manager Branch Chief Team Leader Watts Bar Special Projects Branch Division of Operating Reactor Fire Protection Branch Division of Risk Assessment Fire Protection Engineer AFPBIDRA Fire Protection Engineer AFPBIDRA Fire Protection Engineer AFPB/DRA Mechanical Engineer Resident Inspector Inspector Sr. Reactor Engineer Tennessee Valley Authority (TVA) Participants:
Gordon Arent Licensing Manager Joe Shea Licensing Manger William Crouch Engineering Aging Management of Plant Systems Branch Division of License Renewal RII RII Reactor Systems Branch Division of Safety Systems TVA Watts Bar Unit 2 TVA Watts Bar Unit 1 TVA Watts Bar Unit 2 Enclosure Name PositionlTitle Steve Hilmes Instrumentation and Electrical Manager Kevin Dutton Engineering Ernst Haston Engineering Organization TV A Watts Bar Unit 2 TVA TVA John Sterchi Fire Protection Engineer TVA Charles Brush Electrical Engineer EPM Bob Kalentari*
Contractor EPM *via teleconference March 27, 2012 Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2


==SUMMARY==
LIST OF ATTENDEES AUGUST 31, 2011! PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2 FIRE PROTECTION REPORT AND OPEN ITEMS PositionlTitle            Organization Steve Campbell      Branch Chief              Watts Bar Special Projects Branch (LPWB)
OF AUGUST 31, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2, FIRE PROTECTION REPORT AND OTHER OPEN ITEMS IN THE SAFETY EVALUATION REPORT On August 31,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
Division of Operating Reactor Licensing (DORL)
The purpose of the meeting was to discuss the review of Watts Bar Nuclear Plant Unit 2 Fire Protection Report and other open items in the Safety Evaluation Report, in support of TVA's application for an operating license. A list of attendees is enclosed.
Patrick Milano      Sr. Project Manager        LPWB\DORL Justin Poole        Sr. Project Manager        LPWB\DORL Alex Klein          Branch Chief              Fire Protection Branch (AFPB)
The first part of the meeting consisted of the NRC and TVA staff discussing draft requests for additional information (RAls) based on the content of the fire protection report under technical review. As a result of the meeting, the staff issued RAls that can be found in the Agencywide Documents Access and Management System at Accession Number ML 112490474.
Division of Risk Assessment (DRA)
For the last portion of the meeting, the NRC and TVA staff discussed the responses provided by TVA in a letter dated July 29, 2011, on boron dilution.
Daniel Frumkin      Team Leader                AFPB/DRA Charles Moulton    Fire Protection Engineer AFPBIDRA Bernard Litkett    Fire Protection Engineer AFPBIDRA Naeem Iqbal        Fire Protection Engineer AFPB/DRA Michelle Kichline  Mechanical Engineer        Aging Management of Plant Systems Branch Division of License Renewal Steve Rose*        Resident Inspector        RII Eric Patterson*    Inspector                  RII Sam Miranda        Sr. Reactor Engineer      Reactor Systems Branch Division of Safety Systems Tennessee Valley Authority (TVA)
NRC staff stated that although TVA tried to justify boron dilution calculations for Modes 1, 2, and 6 were sufficient, the staff did not agree and could not complete its evaluation without having calculations for all modes. TVA stated it would work with Westinghouse to provide the missing information.
 
Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
==Participants:==
IRA! Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Gordon Arent        Licensing Manager         TVA Watts Bar Unit 2 Joe Shea            Licensing Manger          TVA Watts Bar Unit 1 William Crouch      Engineering                TVA Watts Bar Unit 2 Enclosure


==Enclosure:==
Name                PositionlTitle          Organization Steve Hilmes        Instrumentation and      TVA Watts Bar Unit 2 Electrical Manager Kevin Dutton        Engineering              TVA Ernst Haston        Engineering              TVA John Sterchi        Fire Protection Engineer TVA Charles Brush      Electrical Engineer      EPM Bob Kalentari*      Contractor              EPM
*via teleconference


List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
'" ML120830484 OFFICE             LPWB\PM               LPWB\LA             LPWB\BC NAME               JPoole                 BClayton             SCampbell DATE               3/27112               3/26/12             3/27112}}
PUBLIC RidsRgn2MailCenter Resource LPWBR/F RidsNrrLABClayton (Hard copy) RidsAcrsAcnw_MailCTR Resource MKotzalas, EDO RidsNrrPMWattsBar2 Resource RidsOgcMailCenter Resource CSteger, NRR RidsNrrDorlLp_WB Resource AKlein, NRR CMoulton, NRR DFrumkin, NRR PMilano, NRR SMiranda, NRR BLitkett, NRR Nlqbal, NRR MKichline, NRR ADAMS Accession No' ML 120830484 " OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 3/27112 3/26/12 3/27112 OFFICIAL RECORD COPY}}

Latest revision as of 12:05, 10 March 2020

Summary of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Fire Protection Report and Open Items in the Safety Evaluation Report
ML120830484
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/27/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Poole J
References
Download: ML120830484 (4)


Text

~"I\ RfGU{ UNITED STATES

",v'" "';-,

01.' o?' NUCLEAR REGULATORY COMMISSION

~

0 WASHINGTON, D.C. 20555-0001 Iii  :

cs.~ ~

"'., ¥00

        • . March 27, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF AUGUST 31, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2, FIRE PROTECTION REPORT AND OTHER OPEN ITEMS IN THE SAFETY EVALUATION REPORT On August 31,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

The purpose of the meeting was to discuss the review of Watts Bar Nuclear Plant Unit 2 Fire Protection Report and other open items in the Safety Evaluation Report, in support of TVA's application for an operating license. A list of attendees is enclosed.

The first part of the meeting consisted of the NRC and TVA staff discussing draft requests for additional information (RAls) based on the content of the fire protection report under technical review. As a result of the meeting, the staff issued RAls that can be found in the Agencywide Documents Access and Management System at Accession Number ML112490474.

For the last portion of the meeting, the NRC and TVA staff discussed the responses provided by TVA in a letter dated July 29,2011, on boron dilution. NRC staff stated that although TVA tried to justify boron dilution calculations for Modes 1, 2, and 6 were sufficient, the staff did not agree and could not complete its evaluation without having calculations for all modes. TVA stated it would work with Westinghouse to provide the missing information.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

~.

~.-.-- Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

list of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES AUGUST 31, 2011! PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2 FIRE PROTECTION REPORT AND OPEN ITEMS PositionlTitle Organization Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB)

Division of Operating Reactor Licensing (DORL)

Patrick Milano Sr. Project Manager LPWB\DORL Justin Poole Sr. Project Manager LPWB\DORL Alex Klein Branch Chief Fire Protection Branch (AFPB)

Division of Risk Assessment (DRA)

Daniel Frumkin Team Leader AFPB/DRA Charles Moulton Fire Protection Engineer AFPBIDRA Bernard Litkett Fire Protection Engineer AFPBIDRA Naeem Iqbal Fire Protection Engineer AFPB/DRA Michelle Kichline Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Steve Rose* Resident Inspector RII Eric Patterson* Inspector RII Sam Miranda Sr. Reactor Engineer Reactor Systems Branch Division of Safety Systems Tennessee Valley Authority (TVA)

Participants:

Gordon Arent Licensing Manager TVA Watts Bar Unit 2 Joe Shea Licensing Manger TVA Watts Bar Unit 1 William Crouch Engineering TVA Watts Bar Unit 2 Enclosure

Name PositionlTitle Organization Steve Hilmes Instrumentation and TVA Watts Bar Unit 2 Electrical Manager Kevin Dutton Engineering TVA Ernst Haston Engineering TVA John Sterchi Fire Protection Engineer TVA Charles Brush Electrical Engineer EPM Bob Kalentari* Contractor EPM

  • via teleconference

'" ML120830484 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 3/27112 3/26/12 3/27112