ML13246A288: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13246A288
| number = ML13246A288
| issue date = 09/03/2013
| issue date = 09/03/2013
| title = Diablo Canyon Midcycle Assessment Letter 2013
| title = Midcycle Assessment Letter 2013
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:September 3, 2013 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 September 3, 2013 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424


==SUBJECT:==
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT UNITS 1 AND 2 (REPORT 05000 275/2013006 AND 05000323/2013006
MID-CYCLE ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT UNITS 1 AND 2 (REPORT 05000275/2013006 AND 05000323/2013006)
)


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==


On August 1 3, 2013, the NRC completed its mid
On August 13, 2013, the NRC completed its mid-cycle performance review of Diablo Canyon Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
-cycle performance review of Diablo Canyon Power Plant
The NRC determined the performance at Diablo Canyon Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 12 , through June 30, 20 13. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.


The NRC determined the performance at Diablo Canyon Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC
E. Halpin                                        In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Please contact me at (817) 200-1141 with any questions you have regarding this letter.
The enclosed inspection plan lists the inspections scheduled through December 31, 20 14. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end
Sincerely,
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
                                                    /RA/
This inspection plan does not i nclude security related inspections, which will be sent via separate, non
Neil OKeefe, Chief Project Branch A Division of Reactor Projects Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82
-publicly available correspondence.
U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511 In accordance with 10 CFR 2.390 of the NRC
's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (8 17) 200-1141 with any questions you have regarding this letter.
Sincerely, /RA/ Neil O'Keefe , Chief Project Branch A Division of Reactor Projects Docket Nos.
: 50-275, 50-323 License Nos.
: DPR-80, DPR-82


==Enclosure:==
==Enclosure:==
Diablo Canyon Power Plant Units 1 and 2 Inspection / Activity Plan
Diablo Canyon Power Plant Units 1 and 2 Inspection / Activity Plan


Electronic Distribution by RIV
E. Halpin                                      Electronic Distribution by RIV:
: Acting Regional Administrator (Steven.Reynolds@nrc.gov) Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)
Acting Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Thomas.Blount@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Tom.Hipschman@nrc.gov) Resident Inspector (Laura.Miceweski@nrc.gov) Branch Chief / B (Neil.O'Keefe@nrc.gov) Senior Project Engineer (Michael.Bloodgood@nrc.gov) Project Engineer (Megan.Williams@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Thomas.Blount@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Tom.Hipschman@nrc.gov)
Resident Inspector (Laura.Miceweski@nrc.gov)
Branch Chief / B (Neil.OKeefe@nrc.gov)
Senior Project Engineer (Michael.Bloodgood@nrc.gov)
Project Engineer (Megan.Williams@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
R4DRP Branch Chiefs (R4DRP
R4DRP Branch Chiefs (R4DRP-BC@nrc.gov)
-BC@nrc.gov)
R4DRS Branch Chiefs (R4DRS-BC@nrc.gov)
R4DRS Branch Chiefs (R4DRS
-BC@nrc.gov)
Director, DIRS, NRR (Ho.Nieh@nrc.gov)
Director, DIRS, NRR (Ho.Nieh@nrc.gov)
Deputy Director, DIRS NRR (Allen.Howe@nrc.gov)
Deputy Director, DIRS NRR (Allen.Howe@nrc.gov)
Line 62: Line 61:
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
NRR Project Manager (Jennivine.Rankin@nrc.gov)
NRR Project Manager (Jennivine.Rankin@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
ACES (R4Enforcement@nrc.gov
RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)
) RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Assistant (Loretta.Williams@nrc.gov)
Technical Assistant (Loretta.Williams@nrc.gov)
RidsNrrDirslpabResource@nrc.gov ROPAssessment.Resource@nrc.gov ROPreports@nrc.gov R:\ _Reactors\Midcycle Assessment Letters 2013.pdf SUNSI Rev Compl.
RidsNrrDirslpabResource@nrc.gov ROPAssessment.Resource@nrc.gov ROPreports@nrc.gov R:\ _Reactors\Midcycle Assessment Letters 2013.pdf SUNSI Rev Compl. Yes  No ADAMS                     Yes  No Reviewer Initials   NFO Publicly Avail.         Yes  No Sensitive         Yes  No Sens. Type Initials NFO RIV:BC/B         RIV:DRS/D         RIV:DRP/DD   RIV: DRP/D NOKeefe         TBlount           TPruett       KKennedy
Yes  No ADAMS Yes  No Reviewer Initials NFO Publicly Avail.
/RA/             /RA/             /RA/         /RA/
Yes  No Sensitive Yes  No Sens. Type Initials NFO RIV:BC/B RIV:DRS/D RIV:DRP/DD RIV: DRP/D NOKeefe TBlount TPruett KKennedy   /RA/ /RA/ /RA/ /RA/   8/28/13 8/28/13 8/28/13 8/29/13   OFFICIAL RECORD COPY T=Telephone           E=E
8/28/13         8/28/13           8/28/13       8/29/13 OFFICIAL RECORD COPY                                   T=Telephone     E=E-mail     F=Fax}}
-mail       F=Fax}}

Latest revision as of 13:59, 4 November 2019

Midcycle Assessment Letter 2013
ML13246A288
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/03/2013
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-B
To: Halpin E
Pacific Gas & Electric Co
References
Download: ML13246A288 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 September 3, 2013 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT UNITS 1 AND 2 (REPORT 05000275/2013006 AND 05000323/2013006)

Dear Mr. Halpin:

On August 13, 2013, the NRC completed its mid-cycle performance review of Diablo Canyon Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Diablo Canyon Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

E. Halpin In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Neil OKeefe, Chief Project Branch A Division of Reactor Projects Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82

Enclosure:

Diablo Canyon Power Plant Units 1 and 2 Inspection / Activity Plan

E. Halpin Electronic Distribution by RIV:

Acting Regional Administrator (Steven.Reynolds@nrc.gov)

Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Thomas.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Tom.Hipschman@nrc.gov)

Resident Inspector (Laura.Miceweski@nrc.gov)

Branch Chief / B (Neil.OKeefe@nrc.gov)

Senior Project Engineer (Michael.Bloodgood@nrc.gov)

Project Engineer (Megan.Williams@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

R4DRP Branch Chiefs (R4DRP-BC@nrc.gov)

R4DRS Branch Chiefs (R4DRS-BC@nrc.gov)

Director, DIRS, NRR (Ho.Nieh@nrc.gov)

Deputy Director, DIRS NRR (Allen.Howe@nrc.gov)

Director, DORL, NRR (Michelle.Evans@nrc.gov)

Deputy Director, DORL, NRR (Louise.Lund@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

NRR Project Manager (Jennivine.Rankin@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)

ACES (R4Enforcement@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Technical Assistant (Loretta.Williams@nrc.gov)

RidsNrrDirslpabResource@nrc.gov ROPAssessment.Resource@nrc.gov ROPreports@nrc.gov R:\ _Reactors\Midcycle Assessment Letters 2013.pdf SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials NFO Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials NFO RIV:BC/B RIV:DRS/D RIV:DRP/DD RIV: DRP/D NOKeefe TBlount TPruett KKennedy

/RA/ /RA/ /RA/ /RA/

8/28/13 8/28/13 8/28/13 8/29/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax