ML17292B095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17292B095
| number = ML17292B095
| issue date = 10/24/1997
| issue date = 10/24/1997
| title = Submits Colr 97-13,rev 2,IAW Requirements of WNP-2 TS 5.6.5
| title = Submits COLR 97-13,rev 2,IAW Requirements of WNP-2 TS 5.6.5
| author name = COLEMAN D W
| author name = Coleman D
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY REGUI STOL INFORMATION DZSTRZBUTIO STEM (RIDE)'c ACCESSIONNNBR 9710310210 DOC.DATE: 97/10/24 NOTARIZED:
{{#Wiki_filter:CATEGORY REGUI STOL INFORMATION DZSTRZBUTIO               STEM (RIDE)
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAMB AUTHOR AFFILIATION COLEMAN;D.W.
                                  'c ACCESSIONNNBR 9710310210             DOC.DATE: 97/10/24     NOTARIZED: NO             DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public             Powe   05000397 AUTH.NAMB           AUTHOR   AFFILIATION COLEMAN;D.W.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Submits COLR 97-13, rev 2, in accordance w/requirements of WNP-2 TS 5.6.5.re Nuclear Plant WNP-2.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR j ENCL I SIZE: TITLE: OR Submittal:
Submits COLR     97-13, rev 2, in accordance w/requirements of WNP-2 TS   5.6.5. re Nuclear Plant WNP-2.
General'Distribution DOCKET 05000397 NOTES: RECIPIENT ID CODE/NAME PD4-2 LA COLBURN,T COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 0 INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC 1 1 1 1 1 1 1 1 1 0 1 1 ILE CENTER NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR 1 1 1 1 1 1 1 1 1 1 R D NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: AOOID         COPIES RECEIVED:LTR       j ENCL   I   SIZE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13  
TITLE: OR Submittal: General 'Distribution NOTES:
RECIPIENT              COPIES            RECIPIENT           COPIES ID CODE/NAME           LTTR ENCL      ID CODE/NAME          LTTR ENCL PD4-2 LA                   1     1     PD4-2 PD                 1      1 COLBURN,T                  1     1 0
INTERNAL: ACRS                         1    1      ILE  CENTER            1      1 NRR/DE/ECGB/A             1    1                              1      1                R NRR/DRCH/HICB             1    1      NRR/DSSA/SPLB            1     1 NRR/DSSA/SRXB              1    1      NUDOCS-ABSTRACT         1     1 OGC/HDS3                  1     0 EXTERNAL: NOAC                        1     1     NRC PDR                  1     1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR             14   ENCL     13


WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 9935Z-0968 October 24, 1997 G02-97-195 Docket No.50-397 U.S.Nuclear Regulator Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 9935Z-0968 October 24, 1997 G02-97-195 Docket No. 50-397 U. S. Nuclear Regulator Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:


==Subject:==
==Subject:==
NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 CYCLE 13 CORE OPERATING LIMITS REPORT (COLR)The Supply System hereby submits the COLR 97-13, Revision 2, in accordance with the requirements of WNP-2 Technical Specification 5.6.5.The operating limits in the COLR resulting from the Cycle 13 reload and licensing analyses have been evaluated against the criteria of 10 CFR 50.59 and it was determined that no unreviewed safety questions are created by its implementation.
NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 CYCLE 13 CORE OPERATING LIMITSREPORT (COLR)
The COLR has been reviewed and approved by the WNP-2 Plant Operations Committee.
The Supply System hereby submits the COLR 97-13, Revision 2, in accordance with the requirements of WNP-2 Technical Specification 5.6.5. The operating limits in the COLR resulting from the Cycle 13 reload and licensing analyses have been evaluated against the criteria of 10 CFR 50.59 and it was determined that no unreviewed safety questions are created by its implementation. The COLR has been reviewed and approved by the WNP-2 Plant Operations Committee.
Should you have any questions or desire additional information regarding this matter, please call me or P.J.Inserra at (509)377-4147.D.W.Coleman Acting Manager, Regulatory Affairs Mail Drop PE20 CC: EW Merschoff-NRC RIV KE Perkins, JR.-NRC RIV, Walnut creek Field Office TG Colburn-NRR NRC Senior Resident Inspector-927N DL Williams-BPA/399 RD Robinson-Winston Ec Strawn 97i03i02i0 97i024%PDR A00CK 00000307 ,4t p PGR IlllllllIIIllIIIIllllllllliIIlllllll I
Should you have any questions or desire additional information regarding this matter, please call me or P. J. Inserra at (509) 377-4147.
~Pa e WNP-2 Cycle 13 Core Operating Limits Report LIST OF EFFE TIVE PA~Revi ioo 3 0 5 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0i 0 0 0 0 0 0 0 LEP
D. W. Coleman Acting Manager, Regulatory Affairs Mail Drop PE20 CC:     EW Merschoff - NRC RIV KE Perkins, JR. - NRC RIV, Walnut creek Field Office TG Colburn - NRR NRC Senior Resident Inspector - 927N DL Williams - BPA/399 RD Robinson - Winston Ec Strawn IlllllllIIIllIIIIllllllllliIIlllllll 97i03i02i0 97i024%                                             I PDR     A00CK 00000307
~Pa e WNP-2.Cycle 13 Core Operating Limits Report LIST F EFFECTIVE PAGES Revision 26 27 28 29 30 31 32 33 35 36 37 38 39 40 41 42 43 44 45 46 47 49 50 0 0 0 0 0 0 0 0 0 0 0'0 0 0 0 0 0 0'0 0 0 0 0 2 LEP-2-'
,4t p                     PGR
~~4~~QoQoiggoggggQ~~QogQgiQ~
jgiiggiig~i~
K322HKXZ!EIR322HK3IZE5lKKEHKRZZ5I RRKRKlHRRKRRH3&EERKK Qgggiggg Q/g++++ii ggg HKEHEXIRKZRKKHH&EZKl RKEREKRKERHRKK'ORE RKKRRKSKERHRKXlREK RKKIRXRKERRXKRKElEZ WKKRKE~~HHWKK WKK'WEE~~~~
~I~i~


==6.0 REFERENCES==
WNP-2 Cycle 13 Core Operating Limits Report LIST OF EFFE TIVE PA
~Pa e                              ~Revi  ioo 3                                    0 5
8 9
10                                      0i 0
12                                      0 13                                      0 14                                      0 15                                      0 16 17 18                                      0 19                                      0 20 21 22 23 24 25 LEP WNP-2
              . Cycle 13 Core Operating Limits Report LIST F EFFECTIVE PAGES
~Pa e                              Revision 26                                      0 27                                      0 28                                      0 29                                      0 30                                      0 31                                      0 32                                      0 33                                      0 0
35                                      0 36                                      0 37                                    '0 38                                      0 39                                      0 40                                      0 41                                      0 42                                      0 43                                      0 44                                    '0 45                                      0 46                                      0 47                                      0 0
49                                      2 50 LEP  '


6.1 NEDO-32269,"Washington Public Power Supply System Nuclear Project 2, Supplement.
4
to SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis," GE Nuclear Energy, September 1993.6.2 6.3 6.4 Letter, Kaveh Taghavi (GE)to J.D.Fisher (WPPSS),"Extended MAPLHGR Curve for SNP 9x9-9X," October 4, 1995.CE NPSD-821-P, Rev.4,"WNP-2 Cycle 13 Reload Report," ABB Combustion Engineering Nuclear Operations, September 1997.CE NPSD-820-P,"WNP-2 Cycle 13 Transient Analysis Report," ABB Combustion Engineering Nuclear Operations, April 1997.6.5 Letter KVW-95:050, K.V, Walters (Siemens Power Corporation) to R.A.Vopalensky (WPPSS),"WNP-2 Fuel Misorientation Error Analysis," October 16, 1995.6.6 CE NPSD-801-P,"WNP-2 LOCA Analysis Report," ABB Combustion Engineering Nuclear Operations, May 1996.Washington Nuclear-Unit.2-50-COLR 97-l3, Revision 2}}
    ~ ~                      ~ ~
QoQoiggoggggQ~~QogQgiQ~ jgiiggiig~i~
K322HKXZ!EIR322HK3IZE5lKKEHKRZZ5I RRKRKlHRRKRRH3&EERKK Qgggiggg Q/g++++iiggg HKEHEXIRKZRKKHH&EZKl RKEREKRKERHRKK'ORE RKKRRKSKERHRKXlREK RKKIRXRKERRXKRKElEZ WKKRKE~~HHWKK WKK'WEE~~~~
                  ~  I  ~ i ~
 
==6.0    REFERENCES==
 
6.1     NEDO-32269, "Washington Public Power Supply System Nuclear Project 2, Supplement. to SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis,"
GE Nuclear Energy, September 1993.
6.2     Letter, Kaveh Taghavi (GE) to J. D. Fisher (WPPSS), "Extended MAPLHGR Curve for SNP 9x9-9X," October 4, 1995.
6.3    CE NPSD-821-P, Rev. 4, "WNP-2 Cycle 13 Reload Report," ABB Combustion Engineering Nuclear Operations, September 1997.
6.4    CE NPSD-820-P, "WNP-2 Cycle 13 Transient Analysis Report,"           ABB Combustion Engineering Nuclear Operations, April 1997.
6.5     Letter KVW-95:050, K. V, Walters (Siemens Power Corporation) to R. A. Vopalensky (WPPSS), "WNP-2 Fuel Misorientation Error Analysis,"
October 16, 1995.
6.6     CE NPSD-801-P, "WNP-2 LOCA Analysis Report," ABB Combustion Engineering Nuclear Operations, May 1996.
Washington Nuclear - Unit.2                                         COLR 97-l3, Revision 2}}

Latest revision as of 13:03, 29 October 2019

Submits COLR 97-13,rev 2,IAW Requirements of WNP-2 TS 5.6.5
ML17292B095
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/24/1997
From: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-195, NUDOCS 9710310210
Download: ML17292B095 (7)


Text

CATEGORY REGUI STOL INFORMATION DZSTRZBUTIO STEM (RIDE)

'c ACCESSIONNNBR 9710310210 DOC.DATE: 97/10/24 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAMB AUTHOR AFFILIATION COLEMAN;D.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits COLR 97-13, rev 2, in accordance w/requirements of WNP-2 TS 5.6.5. re Nuclear Plant WNP-2.

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR j ENCL I SIZE:

TITLE: OR Submittal: General 'Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 COLBURN,T 1 1 0

INTERNAL: ACRS 1 1 ILE CENTER 1 1 NRR/DE/ECGB/A 1 1 1 1 R NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 9935Z-0968 October 24, 1997 G02-97-195 Docket No. 50-397 U. S. Nuclear Regulator Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 CYCLE 13 CORE OPERATING LIMITSREPORT (COLR)

The Supply System hereby submits the COLR 97-13, Revision 2, in accordance with the requirements of WNP-2 Technical Specification 5.6.5. The operating limits in the COLR resulting from the Cycle 13 reload and licensing analyses have been evaluated against the criteria of 10 CFR 50.59 and it was determined that no unreviewed safety questions are created by its implementation. The COLR has been reviewed and approved by the WNP-2 Plant Operations Committee.

Should you have any questions or desire additional information regarding this matter, please call me or P. J. Inserra at (509) 377-4147.

D. W. Coleman Acting Manager, Regulatory Affairs Mail Drop PE20 CC: EW Merschoff - NRC RIV KE Perkins, JR. - NRC RIV, Walnut creek Field Office TG Colburn - NRR NRC Senior Resident Inspector - 927N DL Williams - BPA/399 RD Robinson - Winston Ec Strawn IlllllllIIIllIIIIllllllllliIIlllllll 97i03i02i0 97i024% I PDR A00CK 00000307

,4t p PGR

WNP-2 Cycle 13 Core Operating Limits Report LIST OF EFFE TIVE PA

~Pa e ~Revi ioo 3 0 5

8 9

10 0i 0

12 0 13 0 14 0 15 0 16 17 18 0 19 0 20 21 22 23 24 25 LEP WNP-2

. Cycle 13 Core Operating Limits Report LIST F EFFECTIVE PAGES

~Pa e Revision 26 0 27 0 28 0 29 0 30 0 31 0 32 0 33 0 0

35 0 36 0 37 '0 38 0 39 0 40 0 41 0 42 0 43 0 44 '0 45 0 46 0 47 0 0

49 2 50 LEP '

4

~ ~ ~ ~

QoQoiggoggggQ~~QogQgiQ~ jgiiggiig~i~

K322HKXZ!EIR322HK3IZE5lKKEHKRZZ5I RRKRKlHRRKRRH3&EERKK Qgggiggg Q/g++++iiggg HKEHEXIRKZRKKHH&EZKl RKEREKRKERHRKK'ORE RKKRRKSKERHRKXlREK RKKIRXRKERRXKRKElEZ WKKRKE~~HHWKK WKK'WEE~~~~

~ I ~ i ~

6.0 REFERENCES

6.1 NEDO-32269, "Washington Public Power Supply System Nuclear Project 2, Supplement. to SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis,"

GE Nuclear Energy, September 1993.

6.2 Letter, Kaveh Taghavi (GE) to J. D. Fisher (WPPSS), "Extended MAPLHGR Curve for SNP 9x9-9X," October 4, 1995.

6.3 CE NPSD-821-P, Rev. 4, "WNP-2 Cycle 13 Reload Report," ABB Combustion Engineering Nuclear Operations, September 1997.

6.4 CE NPSD-820-P, "WNP-2 Cycle 13 Transient Analysis Report," ABB Combustion Engineering Nuclear Operations, April 1997.

6.5 Letter KVW-95:050, K. V, Walters (Siemens Power Corporation) to R. A. Vopalensky (WPPSS), "WNP-2 Fuel Misorientation Error Analysis,"

October 16, 1995.

6.6 CE NPSD-801-P, "WNP-2 LOCA Analysis Report," ABB Combustion Engineering Nuclear Operations, May 1996.

Washington Nuclear - Unit.2 COLR 97-l3, Revision 2